CN202099820U - Real-time monitoring system for anchorage force of prestressed anchor cable - Google Patents

Real-time monitoring system for anchorage force of prestressed anchor cable Download PDF

Info

Publication number
CN202099820U
CN202099820U CN2011201759995U CN201120175999U CN202099820U CN 202099820 U CN202099820 U CN 202099820U CN 2011201759995 U CN2011201759995 U CN 2011201759995U CN 201120175999 U CN201120175999 U CN 201120175999U CN 202099820 U CN202099820 U CN 202099820U
Authority
CN
China
Prior art keywords
anchor
cable
real
clamp
time monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201759995U
Other languages
Chinese (zh)
Inventor
杨俊志
侯锦
冯杨文
陈修星
杨世伟
Original Assignee
杨俊志
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 杨俊志 filed Critical 杨俊志
Priority to CN2011201759995U priority Critical patent/CN202099820U/en
Application granted granted Critical
Publication of CN202099820U publication Critical patent/CN202099820U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The utility model discloses a real-time monitoring system for the anchorage force of a prestressed anchor cable, comprising a prestressed anchor cable (1), a force measuring sensor (2) and a signal transmission system (3), wherein the prestressed anchor cable (1) consists of a guide cap (4), an anchor support plate (5), an anchor backing plate (6), an extrusion head (8), a separating frame (9), a restraining ring (10), a grout pipe (11), an anchor clamp (12) and an unbonded steel strand (13), the tail end of the unbonded steel strand (13) is fixedly connected with the anchor clamp (12) on an anchor pier (14), a steel backing plate (15) is arranged between the anchor pier (14) and the anchor clamp (12), the force measuring sensor (2) is arranged between the anchor clamp (12) and the steel backing plate (15), and the force measuring sensor (2) is further connected with the signal transmission system (3). The real-time monitoring system for the anchorage force of the prestressed anchor cable is capable of remote monitoring, good in safety performance and high in measurement accuracy.

Description

The anchorage force of pre-stressed anchor cable real-time monitoring system
Technical field
The utility model relates to a kind of anchorage force of pre-stressed anchor cable real-time monitoring system.
Background technology
In building trade, particularly in the hydraulic architecture industry, the application of prestress anchorage cable is extremely extensive.Traditional prestress anchorage cable generally is divided into tension type prestress anchorage cable and pressure-type prestress anchorage cable: the anchoring section leading portion of tension type prestress anchorage cable is stressed to be the tensile stress concentration zones, gradually to back segment and the easy shear failure that produces; The anchoring section latter end of pressure-type prestress anchorage cable is stressed to be the compressive stress concentration zones, gradually to leading portion and be prone to cause pressure break.
Above-mentioned two kinds of prestress anchorage cables are different to the failure mode of anchoring section; But all can have a strong impact on the effect of prestress anchoraging; If can not monitor the anchored force and the duty of anchor cable in real time, faults such as the not enough and anchor cable fracture of anchorage cable anchoring power will take place unavoidably, even cause the generation of side slope avalanche.Yet; Traditional anchor cable monitoring all is artificial the realization, because the residing geographical environment of a lot of work items is very abominable, even need anchor cable be installed on the very dangerous rock mass and steep cliff; If adopt the personal monitoring, with causing unnecessary personal security accident unavoidably; Also have some anchored force monitoring systems, though adopt intellectual monitoring to act on behalf of the personal monitoring, the certainty of measurement of anchored force is very low.
Along with the development of builing industry and improving constantly of people's safe production awareness; People seem important all the more for the precise monitoring of anchorage force of pre-stressed anchor cable, seek the important topic that a kind of safe and reliable anchorage force of pre-stressed anchor cable monitoring method is called current hydraulic architecture industry.
The utility model content
The purpose of the utility model is to solve the deficiency of prior art; A kind of novel anchorage force of pre-stressed anchor cable real-time monitoring system is provided; Overcome shortcomings such as existing anchorage cable anchoring power monitoring poor stability, certainty of measurement are low; Guaranteed the safety in constructor's work progress, the anchored force situation of real-time remote monitoring anchor cable, unusual circumstance can in time be handled.
The purpose of the utility model realizes through following technical scheme: the anchorage force of pre-stressed anchor cable real-time monitoring system; It comprises prestress anchorage cable, load cell and signal transmission system, and described prestress anchorage cable is made up of guiding cap, anchor supporting plate, anchor plate, extrusion head, isolating frame, constraint circle, grout pipe, anchor clamp and non-bending steel cable, and the anchor plate, extrusion head and the non-bending steel cable extruding that are positioned at the anchoring section front end become single piece; And anchor supporting plate and this single piece are chained together by screw rod; Decomposition pressure type twisted wire bundle, isolating frame, constraint circle and non-bending steel cable are formed tension type twisted wire bundle, and pressure-type twisted wire bundle and tension type twisted wire bundle are organized in together; Guiding cap is fixedly connected with foremost supporting plate; The end of non-bending steel cable is fixedly connected with anchor clamp on the anchor pier, and grout pipe penetrates from the prestress anchorage cable end, through guiding cap place foremost; Be provided with billet between anchor pier and the anchor clamp; Billet is fixedly connected with anchor pier, and load cell is arranged between anchor clamp and the billet, and load cell is connected with a signal transmission system.
The described signal transmission system of the utility model comprises mainboard, signal data transport module and remote server; The output of load cell is connected with mainboard; Mainboard is connected with the input of signal data transport module, and the output of signal data transport module is connected with remote server.
The described signal data transport module of the utility model is the GPRS wireless data transfer module.
The beneficial effect of the utility model is: sensor and Radio Transmission Technology are applied to anchorage cable anchoring power monitoring field, provide a kind of can remote monitoring, security performance is good and certainty of measurement is high anchorage force of pre-stressed anchor cable real-time monitoring system.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 forms block diagram for the utility model signal transmission system;
Among the figure, 1-prestress anchorage cable, 2-load cell, 3-signal transmission system, 4-guiding cap, 5-anchor supporting plate; The 6-anchor plate, the 7-screw rod, the 8-extrusion head, the 9-isolating frame, 10-retrains circle; The 11-grout pipe, 12-anchor clamp, 13-non-bending steel cable, 14-anchor pier, 15-billet.
The specific embodiment
Further describe the technical scheme of the utility model below in conjunction with accompanying drawing: as shown in Figure 1, the anchorage force of pre-stressed anchor cable real-time monitoring system, it comprises prestress anchorage cable 1, load cell 2 and GPRS wireless transmitting system 3; Described prestress anchorage cable 1 is made up of guiding cap 4, anchor supporting plate 5, anchor plate 6, extrusion head 8, isolating frame 9, constraint circle 10, grout pipe 11, anchor clamp 12 and non-bending steel cable 13; The anchor slab, extrusion head and the non-bending steel cable extruding that are positioned at the anchoring section front end become single piece, and supporting plate and this single piece are chained together decomposition pressure type twisted wire bundle by screw rod; Isolating frame, constraint circle and non-bending steel cable are formed tension type twisted wire bundle; Pressure-type twisted wire bundle and tension type twisted wire bundle are organized in together, and guiding cap 4 is fixedly connected with foremost anchor supporting plate 5, and the end of non-bending steel cable 13 is fixedly connected with anchor clamp 12 on the anchor pier 14; Grout pipe 11 penetrates from prestress anchorage cable 1 end; Through guiding cap 4 places foremost are provided with billet 15 between anchor pier 14 and the anchor clamp 12, and billet 15 is fixedly connected with anchor pier 14; Load cell 2 is arranged between anchor clamp 12 and the billet 15; Load cell 2 also is connected with a GPRS wireless transmitting system 3, and GPRS wireless transmitting system 3 comprises mainboard, GPRS wireless data transfer module, remote server, and the output of load cell is connected with mainboard; Mainboard is connected with the input of GPRS wireless data transfer module, and the output of GPRS wireless data transfer module is connected with remote server.
Force sensor for anchor rope 2 is installed between anchor pier 14 and the anchor clamp 12; The stretching force that prestress anchorage cable 1 produces acts on the non-bending steel cable 13 of prestress anchorage cable 1; Thereby affact on the load cell 2 that is fixedly connected with non-bending steel cable 13; Load cell 2 converts the pressure that senses into analog current or voltage, is transferred to mainboard, and mainboard is transferred to the GPRS wireless data transfer module with it after receiving pressure information number; The signal that remote server active searching GPRS wireless data transfer module sends carries out remote monitoring by the staff.

Claims (3)

1. anchorage force of pre-stressed anchor cable real-time monitoring system; It comprises prestress anchorage cable (1), load cell (2) and signal transmission system (3); Described prestress anchorage cable (1) is made up of guiding cap (4), anchor supporting plate (5), anchor plate (6), extrusion head (8), isolating frame (9), constraint circle (10), grout pipe (11), anchor clamp (12) and non-bending steel cable (13); The anchor plate (6), extrusion head (8) and non-bending steel cable (13) extruding that are positioned at the anchoring section front end become single piece; And anchor supporting plate (5) and this single piece are chained together by screw rod (7); Decomposition pressure type twisted wire bundle, isolating frame (9), constraint circle (10) and non-bending steel cable (13) are formed tension type twisted wire bundle, and pressure-type twisted wire bundle and tension type twisted wire bundle are organized in together; Guiding cap (4) is fixedly connected with foremost anchor supporting plate (5); The end of non-bending steel cable (13) is fixedly connected with anchor clamp (12) on the anchor pier (14), and grout pipe (11) penetrates from prestress anchorage cable (1) end, and through guiding cap (4) is foremost located; It is characterized in that: be provided with billet (15) between anchor pier (14) and the anchor clamp (12); Billet (15) is fixedly connected with anchor pier (14), and load cell (2) is arranged between anchor clamp (12) and the billet (15), and load cell (2) also is connected with a signal transmission system (3).
2. anchorage force of pre-stressed anchor cable real-time monitoring system according to claim 1; It is characterized in that: described signal transmission system (3) comprises mainboard, signal data transport module and remote server; The output of load cell (2) is connected with mainboard; Mainboard is connected with the input of signal data transport module, and the output of signal data transport module is connected with remote server.
3. anchorage force of pre-stressed anchor cable real-time monitoring system according to claim 3 is characterized in that: described signal data transport module is the GPRS wireless data transfer module.
CN2011201759995U 2011-05-27 2011-05-27 Real-time monitoring system for anchorage force of prestressed anchor cable Expired - Lifetime CN202099820U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201759995U CN202099820U (en) 2011-05-27 2011-05-27 Real-time monitoring system for anchorage force of prestressed anchor cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201759995U CN202099820U (en) 2011-05-27 2011-05-27 Real-time monitoring system for anchorage force of prestressed anchor cable

Publications (1)

Publication Number Publication Date
CN202099820U true CN202099820U (en) 2012-01-04

Family

ID=45385839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201759995U Expired - Lifetime CN202099820U (en) 2011-05-27 2011-05-27 Real-time monitoring system for anchorage force of prestressed anchor cable

Country Status (1)

Country Link
CN (1) CN202099820U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102297739A (en) * 2011-05-27 2011-12-28 杨俊志 System for monitoring anchored force of pre-stressed anchor cable in real time
CN111256895A (en) * 2020-02-18 2020-06-09 广东交科检测有限公司 Post-construction anchor cable prestress monitoring and mounting system and method
CN111395413A (en) * 2020-03-20 2020-07-10 广东交科检测有限公司 Post-construction anchor cable prestress sensor mounting system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102297739A (en) * 2011-05-27 2011-12-28 杨俊志 System for monitoring anchored force of pre-stressed anchor cable in real time
CN111256895A (en) * 2020-02-18 2020-06-09 广东交科检测有限公司 Post-construction anchor cable prestress monitoring and mounting system and method
CN111395413A (en) * 2020-03-20 2020-07-10 广东交科检测有限公司 Post-construction anchor cable prestress sensor mounting system and method

Similar Documents

Publication Publication Date Title
CN102297739B (en) System for monitoring anchored force of pre-stressed anchor cable in real time
CN202099820U (en) Real-time monitoring system for anchorage force of prestressed anchor cable
CN201229214Y (en) Tensile force monitoring device for ice-coated powerline on-line monitoring system
CN202012047U (en) Steel strand inclined pulling and buckling system of tower
CN104653208A (en) Simple micro-added resistance large-deformation anchorage device and method
CN202075181U (en) Anchor bolt strength testing device
CN201223881Y (en) Apparatus for measuring tensioning force of fine rolling screw-thread steel
CN111551300B (en) Method for monitoring total anchoring force of whole-body type anchor rod by utilizing linear displacement sensor
CN214783888U (en) Partially recyclable tension type prestressed anchor rod
CN109915188A (en) A kind of high-strength surely hinder detachable pushes back half davit and wall rock deformation monitoring method
CN202116199U (en) Stretch-draw adjusting and anchoring device for steel strand cable of cable crane
CN201883612U (en) Anchor device
CN201464096U (en) Anchor tope pre-stress non-destructive detector
CN203174889U (en) Extrusion screw anchorage device
CN201209252Y (en) High intensity ribbed screw-thread steel anchor rod
CN204113316U (en) A kind of interval screw rod body formula large deformation anchor rod
CN201390621Y (en) Control device capable of automatically giving alarm and shutting down winch for overloaded traction rope
CN202378869U (en) Load distortion based passenger transport cableway safety device
CN211740580U (en) Positioning and monitoring device for looseness fault of bolt of power transmission tower
CN202693167U (en) Rock bolt extensometer for underground engineering model test
CN209722747U (en) Steel box-girder entirety fall girder apparatus
CN201896462U (en) Moving device for integral translating of house
CN201266128Y (en) Security anchor withdrawing apparatus adopting double-anchor structure
CN201311281Y (en) Remote strain measuring collector
CN203497970U (en) Moment limiter of derrick crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120104

Effective date of abandoning: 20130227

RGAV Abandon patent right to avoid regrant