CN202099723U - Arch bridge suspender structure with a rigid tie bar - Google Patents

Arch bridge suspender structure with a rigid tie bar Download PDF

Info

Publication number
CN202099723U
CN202099723U CN2011201196285U CN201120119628U CN202099723U CN 202099723 U CN202099723 U CN 202099723U CN 2011201196285 U CN2011201196285 U CN 2011201196285U CN 201120119628 U CN201120119628 U CN 201120119628U CN 202099723 U CN202099723 U CN 202099723U
Authority
CN
China
Prior art keywords
steel pipe
tie bar
tie
sling
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201196285U
Other languages
Chinese (zh)
Inventor
王明昌
朱纯海
常喜梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongshe Group Co ltd
Wuxi Traffic Planning & Design Research Institute Co.,Ltd.
Original Assignee
Wuxi Traffic Planning & Design Research Institute Co Ltd
JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Traffic Planning & Design Research Institute Co Ltd, JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP Co Ltd filed Critical Wuxi Traffic Planning & Design Research Institute Co Ltd
Priority to CN2011201196285U priority Critical patent/CN202099723U/en
Application granted granted Critical
Publication of CN202099723U publication Critical patent/CN202099723U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an arch bridge suspender structure with a rigid tie bar, comprising a sling, wherein one end of the sling is fixed on an arch rib, another end of the sling is fixed on the tie bar, a steel pipe is sleeved with the sling, steel plates are embedded into the arch rib and the tie bar in advance, the steel pipe is fixedly connected with a steel plate, a squeezing hole is arranged on the steel pipe, an upper guide pipe is arranged in the arch rib, a lower guide pipe is arranged in the tie bar; one end of the lower guide pipe contacting with the steel pipe is higher than the tie bar, the steel pipe is fixedly connected with the steel plate by a suspender sleeve; the outer parts of the upper, lower guide pipes are provided with spiral ribs and the upper, lower guide pipes are reinforced and fixed by an anchor steel rib. The safety margin of the suspender is added by sleeving the strained steel pipe with the flexible sling, the service life of the suspender is prolonged. Because the steel pipe can independently bear the load of the sling segment, the sling exchanging has relative small effect on the adjacent suspender and the sling is conveniently exchanged.

Description

The arch bridge suspender structure of band rigid tie bar
Technical field
The utility model relates to the suspension rod design field of arch bridge, especially relates to a kind of arch bridge suspender structure with rigid tie bar.
Background technology
At present, in the construction of arch bridge and design, the flexible hoist cable of general normal employing is as suspension rod, but its in the application of rigid tie bar arch bridge, suspension rod STRESS VARIATION amplitude is bigger on the one hand, and has caused the life-span of hoist cable often shorter, safety stock is not enough; In the process of suspender replacement hoist cable, the STRESS VARIATION amplitude of contiguous suspension rod is often bigger on the other hand, and structure stress is undesirable, changes difficulty.
Summary of the invention
The utility model technical problem to be solved provides a kind of arch bridge suspender structure with rigid tie bar, and it can reduce suspension rod STRESS VARIATION amplitude, prolongs suspension rod application life, under the prerequisite of not appreciable impact structure stress, makes things convenient for suspender replacement.
The technical scheme that its technical problem of the utility model solution is taked is: a kind of arch bridge suspender structure with rigid tie bar, comprise hoist cable, and hoist cable one end is fixed on the arch rib; The other end is fixed on the tie-rod, is with steel pipe on the described hoist cable, is embedded with steel plate in arch rib and the tie-rod; Steel pipe is fixedly connected with steel plate; Steel pipe is provided with the mud jacking hole, is provided with upper conduit in the arch rib, is provided with downcomer in the tie-rod.
Infiltrate entering downcomer in back in the suspension rod for prevention of water at the interface of steel pipe and tie-rod, the end that described downcomer contacts with steel pipe exceeds tie-rod, and steel pipe is fixedly connected with steel plate through the suspension rod sleeve pipe; Further: described downcomer exceeds 5 centimetres of tie-rods.
For adapting to mud jacking technology, for preventing that infiltration from lost efficacy foamed plastics, be provided with steam vent in the arch rib of described upper conduit upper end simultaneously, be provided with drain hole in the tie-rod of downcomer lower end.
In order to strengthen the bonding strength of arch rib and steel pipe, steel plate and steel pipe junction are fixed with stiffener in the described arch rib.
In order to carry the local pressure in arch rib and the tie-rod, described upper conduit and downcomer outside are provided with spiral bar.
In order to be that upper conduit closely is connected with tie-rod with arch rib with downcomer, described upper conduit and downcomer are provided with welding and paste the angle.
The beneficial effect of the utility model is: through increase the safety stock of suspension rod at the stressed steel pipe of flexible hoist cable overcoat, prolong suspension rod application life; Because steel pipe can independently bear the load of its hoist cable section, thus less to contiguous suspension rod influence when changing hoist cable, change conveniently.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the structural representation of the utility model steel pipe and tie-rod junction A.
Among the figure: 1, steam vent 2, spiral bar 3, steel plate 4, drain hole 5, tie-rod
6, downcomer 7, fillet weld add anchor reinforcing bar 8, hoist cable 9, mud jacking hole 10, steel pipe
11, stiffener 12, arch rib 13, suspension rod sleeve pipe 14, upper conduit.
The specific embodiment
A kind of arch bridge suspender structure with rigid tie bar as shown in Figure 1 comprises hoist cable 8, and hoist cable 8 one ends are fixed on the arch rib 12; The other end is fixed on the tie-rod 5, is with steel pipe 10 on the hoist cable 8, is embedded with steel plate 3 in arch rib 12 and the tie-rod 5; Steel pipe 10 is fixedly connected with steel plate 3; Steel pipe 10 is provided with mud jacking hole 9, is provided with upper conduit 14 in the arch rib 12, is provided with downcomer 6 in the tie-rod 5; Be provided with steam vent 1 in the upper conduit 14 upper end arch ribs 12, be provided with drain hole 4 in the downcomer 6 lower end tie-rods 5; Steel plate 3 is fixed with stiffener 11 with steel pipe 10 junctions in the arch rib 12; Upper conduit 14 is provided with spiral bar 2 with downcomer 6 outsides; Upper conduit 14 is provided with fillet weld with downcomer 6 and adds anchor reinforcing bar 7.
The end that downcomer 6 as shown in Figure 2 contacts with steel pipe 10 exceeds tie-rod 5, and steel pipe 10 is fixedly connected with steel plate 3 through suspension rod sleeve pipe 13; Downcomer 14 exceeds tie-rod 5 end faces has 5 centimetres.
With flexible hoist cable 8 outer steel pipes 10 in generally designing; Through pre-embedded steel slab 3 in concrete arch rib 12 and tie-rod 5; With the weld seam pattern pre-embedded steel slab 3 and steel pipe 10 are welded; Fill RPUF 10 of hoist cable 8 and steel pipes, foamed plastics is through reserving mud jacking hole 9 sprays on steel pipe 10, treats that spray finishes to adopt the shutoff of M16 bolt.Offer steam vent 1 for adapting to mud jacking technology in the upper end of the upper conduit 14 of hoist cable 8,, be provided with drain hole 4 in the lower end of the downcomer 6 of hoist cable 8 simultaneously for preventing that infiltration from making the foamed plastics inefficacy.For prevention of water is infiltrated entering downcomer 6 in back in the suspension rod at the interface of steel pipe 10 and tie-rod 5, with 6 outer tie-rod 5 end faces that stretch out of downcomer in the tie-rod 5.
The concrete steps that this kind hanging rod structure is installed are: 1, pre-buried upper conduit 14 and downcomer 6, spiral bar 2, steel plate 3 etc.; 2, the outer steel pipe 10 of hoist cable is installed, with pre-embedded steel slab 3 firm welding; 3, will be in place with the hoist cable 8 of chill casting anchor head, the RPUF spray is gone in steel pipe 10 and the stretch-draw end protective cover, sealing mud jacking hole 9 through mud jacking hole 9.

Claims (7)

1. the arch bridge suspender structure with rigid tie bar comprises hoist cable (8), and hoist cable (8) one ends are fixed on the arch rib (12); The other end is fixed on the tie-rod (5), it is characterized in that: be with steel pipe (10) on the described hoist cable (8), be embedded with steel plate (3) in arch rib (12) and the tie-rod (5); Steel pipe (10) is fixedly connected with steel plate (3); Steel pipe (10) is provided with mud jacking hole (9), is provided with upper conduit (14) in the arch rib (12), is provided with downcomer (6) in the tie-rod (5).
2. the arch bridge suspender structure of band rigid tie bar according to claim 1 is characterized in that: the end that described downcomer (6) contacts with steel pipe (10) exceeds tie-rod (5), and steel pipe (10) is fixedly connected with steel plate (3) through suspension rod sleeve pipe (13).
3. the arch bridge suspender structure of band rigid tie bar according to claim 2 is characterized in that: described downcomer (6) exceeds 5 centimetres of tie-rod (5) end faces.
4. the arch bridge suspender structure of band rigid tie bar according to claim 1 and 2 is characterized in that: be provided with steam vent (1) in described upper conduit (14) the top arch rib (12), be provided with drain hole (4) in downcomer (6) the bottom tie-rod (5).
5. the arch bridge suspender structure of band rigid tie bar according to claim 1 is characterized in that: the interior steel plate of described arch rib (12) (3) is fixed with stiffener (11) with steel pipe (10) junction.
6. the arch bridge suspender structure of band rigid tie bar according to claim 1 is characterized in that: described upper conduit (14) and downcomer (6) outside are provided with spiral bar (2).
7. the arch bridge suspender structure of band rigid tie bar according to claim 1 is characterized in that: described upper conduit (14) and downcomer (6) are provided with fillet weld and add anchor reinforcing bar (7).
CN2011201196285U 2011-04-21 2011-04-21 Arch bridge suspender structure with a rigid tie bar Expired - Fee Related CN202099723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201196285U CN202099723U (en) 2011-04-21 2011-04-21 Arch bridge suspender structure with a rigid tie bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201196285U CN202099723U (en) 2011-04-21 2011-04-21 Arch bridge suspender structure with a rigid tie bar

Publications (1)

Publication Number Publication Date
CN202099723U true CN202099723U (en) 2012-01-04

Family

ID=45385745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201196285U Expired - Fee Related CN202099723U (en) 2011-04-21 2011-04-21 Arch bridge suspender structure with a rigid tie bar

Country Status (1)

Country Link
CN (1) CN202099723U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046466A (en) * 2012-12-29 2013-04-17 广东省公路勘察规划设计院股份有限公司 Detectable, replaceable and adjustable arch bridge suspender system and method for constructing same
CN104047230A (en) * 2014-06-26 2014-09-17 葛洲坝集团项目管理有限公司 Treatment method for through steel tube concrete simply supported beam tied-arch bridge suspender embedded pipe deviation
CN104631328A (en) * 2014-12-30 2015-05-20 上海市基础工程集团有限公司 Construction technology of horizontal ring cable of arc-shaped bridge
CN113265936A (en) * 2021-04-21 2021-08-17 无锡市市政设施建设工程有限公司 Connecting device for protective steel pipes of suspender of tied arch bridge and using method of connecting device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046466A (en) * 2012-12-29 2013-04-17 广东省公路勘察规划设计院股份有限公司 Detectable, replaceable and adjustable arch bridge suspender system and method for constructing same
CN103046466B (en) * 2012-12-29 2014-12-10 广东省公路勘察规划设计院股份有限公司 Detectable, replaceable and adjustable arch bridge suspender system and method for constructing same
CN104047230A (en) * 2014-06-26 2014-09-17 葛洲坝集团项目管理有限公司 Treatment method for through steel tube concrete simply supported beam tied-arch bridge suspender embedded pipe deviation
CN104047230B (en) * 2014-06-26 2016-08-17 葛洲坝集团项目管理有限公司 The processing method of Through Steel pipeline overhead lifting concrete simply supported beam tied arch bridge hanger rod built-in pipe off normal
CN104631328A (en) * 2014-12-30 2015-05-20 上海市基础工程集团有限公司 Construction technology of horizontal ring cable of arc-shaped bridge
CN113265936A (en) * 2021-04-21 2021-08-17 无锡市市政设施建设工程有限公司 Connecting device for protective steel pipes of suspender of tied arch bridge and using method of connecting device
CN113265936B (en) * 2021-04-21 2022-11-15 无锡市市政设施建设工程有限公司 Connecting device for protective steel pipes of suspender of tied arch bridge and using method of connecting device

Similar Documents

Publication Publication Date Title
CN202099723U (en) Arch bridge suspender structure with a rigid tie bar
CN102926331B (en) Concrete hollow slab bridge strengthened by transverse integral clamping connection
CN203904851U (en) Continuous beam side span straight section hanger support system
CN101570961B (en) Fastening method for fractured girder of bridge
CN104695336B (en) The double-deck first up and then down stand construction method of Cast-in-situ Beam
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
CN106012960A (en) Assembly type long piled wharf upper structure system and construction method thereof
CN101906754A (en) Rigid connection method for steel beam and concrete pier
CN103485333B (en) Waveform hollow steel pipe friction pile and construction method
CN203530851U (en) Basket device for combined basket working vehicle
CN103614974B (en) Prestress sectional steel reinforcing system of reinforced concrete arch shell bridge body
CN102251481B (en) Railway pier layered construction method and construction device
CN106121144B (en) A kind of spacing bearing of concrete staircase damping
CN205207907U (en) Novel pipeline bracket of tape base plinth
CN105088961B (en) The construction method that a kind of end bay closure segment is merged with Cast-in-Situ Segment
CN106567548A (en) Segmented mounting method for square raw coal hopper
CN201125460Y (en) Structure for arranging large capacity tonnage hoisting ring on reinforced concrete beam
CN203700976U (en) Prestressed section steel reinforcement system of ferroconcrete arch shell bridge
CN202187300U (en) Deepwater pier strengthening structure
CN201873949U (en) Bride prestress stretch-draw trolley
CN203393637U (en) Bearing bracket
CN205348005U (en) Construction operation combination platform of basket is hung to cable -stay bridge guy rope
CN103526698B (en) Cast-in-cantilever construction 0# block concrete supporting system and construction method
CN209369177U (en) Reinforcement structure based on H profile steel support column
CN204898530U (en) Pier shaft template is strengthened to steel construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: WUXI TRAFFIC PLANNING + DESIGN RESEARCH INSTITUTE CO., LTD.

Effective date: 20150515

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: JIANGSU ZHONGSHE GROUP CO., LTD.

Free format text: FORMER NAME: JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP CO., LTD.

CP03 Change of name, title or address

Address after: Jinxi road Binhu District 214125 Jiangsu city of Wuxi province No. 100

Patentee after: JIANGSU ZHONGSHE GROUP CO.,LTD.

Patentee after: Wuxi Traffic Planning & Design Research Institute Co.,Ltd.

Address before: 214072 No. 2188, West Avenue, Wuxi, Jiangsu, Taihu

Patentee before: JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP Co.,Ltd.

Patentee before: Wuxi Traffic Planning & Design Research Institute Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20150515

Address after: Jinxi road Binhu District 214125 Jiangsu city of Wuxi province No. 100

Patentee after: JIANGSU ZHONGSHE GROUP CO.,LTD.

Address before: Jinxi road Binhu District 214125 Jiangsu city of Wuxi province No. 100

Patentee before: JIANGSU ZHONGSHE GROUP CO.,LTD.

Patentee before: Wuxi Traffic Planning & Design Research Institute Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120104

Termination date: 20170421

CF01 Termination of patent right due to non-payment of annual fee