CN202085468U - 抬田工程土层结构 - Google Patents

抬田工程土层结构 Download PDF

Info

Publication number
CN202085468U
CN202085468U CN2011201587842U CN201120158784U CN202085468U CN 202085468 U CN202085468 U CN 202085468U CN 2011201587842 U CN2011201587842 U CN 2011201587842U CN 201120158784 U CN201120158784 U CN 201120158784U CN 202085468 U CN202085468 U CN 202085468U
Authority
CN
China
Prior art keywords
layer
field
soil layer
engineering
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201587842U
Other languages
English (en)
Inventor
吴艳频
李春华
孔俐丽
张建华
柯劲松
黄明新
蔡方昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi water conservancy planning and Design Institute
Original Assignee
Jiangxi Provincial Water Conservancy Planning And Designing Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Provincial Water Conservancy Planning And Designing Institute filed Critical Jiangxi Provincial Water Conservancy Planning And Designing Institute
Priority to CN2011201587842U priority Critical patent/CN202085468U/zh
Application granted granted Critical
Publication of CN202085468U publication Critical patent/CN202085468U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

本实用新型公开了一种抬田工程土层结构,涉及在抬田工程中对土层结构的改进技术。由耕作土层(1)、保水层(2)、垫高层(3)构成,底部垫高层(3)位于抬田区地面之上,保水层(2)位于底部垫高层(3)上面,耕作土层(1)位于保水层(2)上面。所述耕作土层(1)厚度为25cm~30cm;保水层(2)厚度30cm。本实用新型解决了现有技术没有对抬田工程的结构组成、控制参数进行科学的研究与试验,缺乏准确数据依据的问题。

Description

抬田工程土层结构
技术领域
本实用新型涉及在抬田工程中对土层结构的改进技术。 
背景技术
抬田工程是修建蓄水工程时,为减少耕地淹没,对耕地进行抬高,抬高至不被水淹没,而采取的一项工程措施。随着国家对耕地资源保护的重视,该工程措施在水利水电工程中的运用越来越广泛。在以往的运用中,没有对抬田工程的结构组成、控制参数进行科学的研究与试验,缺乏准确的数据依据。 
发明内容
本实用新型提供一种抬田工程土层结构,本实用新型解决了现有技术没有对抬田工程的结构组成、控制参数进行科学的研究与试验,缺乏准确数据依据的问题。 
为解决上述问题,本实用新型采用如下技术方案:由耕作土层1、保水层2、垫高层3构成,底部垫高层3位于抬田区地面之上,保水层2位于底部垫高层3上面,耕作土层1位于保水层2上面。 
所述耕作土层1厚度为25 cm~30cm;保水层2厚度30cm。 
本实用新型对耕地满足作物生长要求、抬田土料的分析研究,提出抬田工程结构由耕作层、保水层、垫高层三层组成,通过野外调查分析、室内试验、室外耕作对比,提出了抬田工程结构的组成及主要控制参数。 
本实用新型技术提出了抬田工程结构组成和关键控制参数,可用于指导水利水电工程的抬田工程,亦可用于造地工程、土地整理工程。 
附图说明
图1是本实用新型结构示意图。 
图中符号说明:耕作土层1、保水层2、底部垫高层3。 
具体实施方式
如图1所示,抬田工程土层结构,抬田工程土层结构,由抬田区剥离的表层耕作土底部土构成的耕作土层1、粘性土构成的保水层2、粘土、壤土、风化料和砂卵石料构成的垫高层3构成,底部垫高层3位于抬田区地面之上,保水层2位于底部垫高层3上面,耕作土层1位于保水层2上面。 
主要控制参数为,水稻田耕作土层厚度25~30cm;保水层厚度30cm,压实度0.90;垫高层厚度根据抬田高度确定,压实度0.88。 
在峡江水利枢纽库区抬田区选择实验田块进行种植实验,在相同耕作条件下,抬田后的第一季水稻产量为600~700斤/亩,略低于当地平均水平,第二季产量达到抬田前的水平,达到了抬田效果。选择的保水层厚度较薄,较少了工程征地,相应节省工程投资。提出的控制参数,为工程设计、施工、质量控制提供了科学依据。 
最后应说明的是:显然,上述实施例仅仅是为清楚地说明本实用新型所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引申出的显而易见的变化或变动仍处于本实用新型的保护范围之中。 

Claims (2)

1.抬田工程土层结构,其特征在于,由耕作土层(1)、保水层(2)、垫高层(3)构成,底部垫高层(3)位于抬田区地面之上,保水层(2)位于底部垫高层(3)上面,耕作土层(1)位于保水层(2)上面。
2.如权利要求1所述抬田工程土层结构,其特征在于,所述耕作土层(1)厚度为25 cm~30cm;保水层(2)厚度30cm。
CN2011201587842U 2011-05-18 2011-05-18 抬田工程土层结构 Expired - Fee Related CN202085468U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201587842U CN202085468U (zh) 2011-05-18 2011-05-18 抬田工程土层结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201587842U CN202085468U (zh) 2011-05-18 2011-05-18 抬田工程土层结构

Publications (1)

Publication Number Publication Date
CN202085468U true CN202085468U (zh) 2011-12-28

Family

ID=45360576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201587842U Expired - Fee Related CN202085468U (zh) 2011-05-18 2011-05-18 抬田工程土层结构

Country Status (1)

Country Link
CN (1) CN202085468U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102792800A (zh) * 2012-08-23 2012-11-28 徐良骥 一种基于煤矸石与土层结合的多层结构充填复垦方法
CN105672198A (zh) * 2016-03-25 2016-06-15 中国电建集团贵阳勘测设计研究院有限公司 一种水库淹没浸没区造地还耕结构及其施工方法
CN109669025A (zh) * 2019-01-29 2019-04-23 南昌工程学院 一种生物质炭改良红壤抬田的模拟实验装置及其实验方法
CN114660268A (zh) * 2022-03-22 2022-06-24 中铁水利水电规划设计集团有限公司 水库淹没区的抬田区耕地保水层渗流监测系统

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102792800A (zh) * 2012-08-23 2012-11-28 徐良骥 一种基于煤矸石与土层结合的多层结构充填复垦方法
CN102792800B (zh) * 2012-08-23 2016-04-20 安徽理工大学 一种基于煤矸石与土层结合的多层结构充填复垦方法
CN105672198A (zh) * 2016-03-25 2016-06-15 中国电建集团贵阳勘测设计研究院有限公司 一种水库淹没浸没区造地还耕结构及其施工方法
CN109669025A (zh) * 2019-01-29 2019-04-23 南昌工程学院 一种生物质炭改良红壤抬田的模拟实验装置及其实验方法
CN109669025B (zh) * 2019-01-29 2024-01-12 南昌工程学院 一种生物质炭改良红壤抬田的模拟实验装置及其实验方法
CN114660268A (zh) * 2022-03-22 2022-06-24 中铁水利水电规划设计集团有限公司 水库淹没区的抬田区耕地保水层渗流监测系统

Similar Documents

Publication Publication Date Title
Humphreys et al. Halting the groundwater decline in north-west India—which crop technologies will be winners?
CN101779537B (zh) 旱地作物粉垄栽培方法
CN104012361B (zh) 一种防止在砂砾土地上栽培葡萄时土壤水肥流失的方法
CN104472293B (zh) 高产优质猕猴桃园建立的高垄栽培法
CN103918521B (zh) 三峡库区新建柑橘园土壤快速熟化的定植穴改土方法
CN101401513A (zh) 竹篾栅生态恢复技术
CN103039147A (zh) 一种山地采煤沉陷水田复垦方法
CN103843559A (zh) 一种滨海吹填土盐碱地园林绿化种植的方法
CN102239760B (zh) 一种紫色土坡耕地横沟顺垄熟土防蚀耕作方法
CN202085468U (zh) 抬田工程土层结构
CN103039233B (zh) 一种用于屋顶绿化用的乔木树种的导根育苗方法
CN103053316A (zh) 澳洲坚果种植方法
CN101731087B (zh) 一种稻田氮磷流失减控方法
CN104303753B (zh) 一种悬空式长山药栽培方法
CN106358495A (zh) 提高新增耕地土壤持水能力的土体营造方法及种植方法
CN101496477A (zh) 一种大葱栽培方法
CN1860843A (zh) 城市地毯草皮基质及其制备方法
CN102498758B (zh) 一种节水栽培方法及栽培结构
CN203233657U (zh) 一种滨海盐碱地梯田式吹填土的局部造型
CN209234523U (zh) 一种冲积平原的种植水田土壤结构
CN105393893A (zh) 一种非宜林新围垦滩涂沿海防护林基干林带的构建和营造方法
CN108513855A (zh) 一种猕猴桃-芋艿-茭白的立体种植方法
CN103190272A (zh) 一种盐碱土地区速生杨树扩繁膜上扦插育苗方法
CN114303848A (zh) 一种红薯育种水旱轮耕轮种田地改造方法及所用浆料
CN204031730U (zh) 秸秆深埋犁

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Chunhua

Inventor after: Kong Lili

Inventor after: Zhang Jianhua

Inventor after: Ke Jinsong

Inventor after: Huang Mingxin

Inventor after: Cai Fangcuan

Inventor before: Wu Yanpin

Inventor before: Li Chunhua

Inventor before: Kong Lili

Inventor before: Zhang Jianhua

Inventor before: Ke Jinsong

Inventor before: Huang Mingxin

Inventor before: Cai Fangcuan

C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 330200 Jiangxi province Nanchang County Jiangxi billion building science and Technology Industrial Park Dong Lian Road No. 88

Patentee after: Jiangxi water conservancy planning and Design Institute

Address before: 330006, 1038, Qingshan Lake District, Jiangxi, Beijing East Road, Nanchang

Patentee before: Jiangxi Provincial Water Conservancy Planning and Designing Institute

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20190518