CN202076119U - Inductance component semi-automatic production line - Google Patents
Inductance component semi-automatic production line Download PDFInfo
- Publication number
- CN202076119U CN202076119U CN2011201427839U CN201120142783U CN202076119U CN 202076119 U CN202076119 U CN 202076119U CN 2011201427839 U CN2011201427839 U CN 2011201427839U CN 201120142783 U CN201120142783 U CN 201120142783U CN 202076119 U CN202076119 U CN 202076119U
- Authority
- CN
- China
- Prior art keywords
- workbench
- conveyer belt
- conveyor belt
- region
- production line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Branching, Merging, And Special Transfer Between Conveyors (AREA)
Abstract
An inductance component semi-automatic production line comprises a left workbench and a right workbench; also comprises a first conveyor belt and a second conveyor belt; the first conveyor belt and the second conveyor belt are disposed between the left workbench and the right workbench, by the order: the left workbench, the first conveyor belt, the second conveyor belt and the right workbench; a first installing region, an adhesive depositing region, a baking region, a composing and tin soldering region and a first post processing region are disposed successively on the left workbench; a second mounting region and a second post processing region are disposed successively on the right workbench. The utility model concentrates production processes, can save manpower resource, simplify operation flow and shorten production line, thereby is beneficial to reducing equipment occupation space; The semi-automatic transmission makes the production flow smoother, avoids some quality problems caused in manual carrying process; reduces the waste on manpower and material resources, reduces production cost, increases the production efficiency of workers, thereby improves product quality.
Description
Technical field
The utility model relates to a kind of production line, is specifically related to the semi-automatic production line of a kind of inductance element.
Background technology
Inductance element be a kind of be with insulated conductor (enamelled wire for example, sand hill line etc.) energy-storage travelling wave tube of the electromagnetic induction that forms of coiling, the archetype of inductance element is a lead coiled cylindrical coil, in coil, pass to current i, in coil, will produce magnetic flux phi, and storage power, belong to common component, development along with high-tech product, the use of inductance element also more and more widely, be deep into every field, what generally use in process of production at present is manual working in dispersion line, operating area is followed successively by winding region, the separated time district, glue application region, combination region, a baking zone, twine and cut the pin district, the secondary glue application region, the secondary baking district, composing scolding tin district, cleaning area and outward appearance district, transmission between each zone simultaneously all is to rely on a dead lift, disperses production line meeting cable body numerous and jumbled, manually more, use the production space big, product quality is found untimely, the shortcoming that scrappage is high.
The utility model content
The purpose of this utility model is to provide a kind of inductance element semi-automatic production line, can reduce to take up an area of space, centralized operation operation, save artificial and improve the product yield.
In order to realize this purpose, the utility model has adopted following technical scheme:
The semi-automatic production line of a kind of inductance element, comprise Zuo Zuotai and right workbench, also comprise first conveyer belt and second conveyer belt, described first conveyer belt and second conveyer belt are located between left workbench and the right workbench, described being arranged in order is left workbench, first conveyer belt, second conveyer belt and right workbench, described left workbench is provided with first installing zone, glue application region, baking zone, composing scolding tin district and the first post-processed district successively, and described right workbench is provided with second installing zone and the second post-processed district successively.
Wherein, described left workbench is than right work director, all integral manufacturing operations that left workbench is set, right workbench then is to reprocess product, the defective item of inspection can be reprocessed then return before operation repair.
Wherein, described first conveyer belt is parallel with left workbench, and, described second conveyer belt is parallel with right workbench, and workbench is parallel with conveyer belt, and the whole operation table top is in level, make things convenient for staff's operation, be convenient to the coordination configuration and the uniformity of equipment simultaneously.
Wherein, described first conveyer belt is parallel with second driving-belt.
Wherein, described first installing zone and described second installing zone are symmetrical arranged, and described first post-processed district and the described second post-processed district are symmetrical arranged.
The utility model contrast prior art has following advantage: the centralized production operation, can save human resources, the flow process that simplifies the operation has shortened the production line length, help minimizing equipment and take up an area of the space, adopt semi-automatic the transmission, production procedure is more smooth, has avoided some quality problem that produced in a dead lift process, also reduce simultaneously man power and material's waste, reduce production costs, improve personnel's production efficiency, thereby improve the quality of products.
Description of drawings
Accompanying drawing 1 is the utility model structure chart.
Embodiment
Referring now to accompanying drawing, further describe the utility model.
As shown in Figure 1, the semi-automatic production line of a kind of inductance element, comprise left workbench 1 and right workbench 2, also comprise first conveyer belt 3 and second conveyer belt 4, first conveyer belt 3 and second conveyer belt 4 are located between left workbench 1 and the right workbench 2, be arranged in order and be left workbench 1, first conveyer belt 3, second conveyer belt 4 and right workbench 2, left side workbench 1 is provided with first installing zone 10, glue application region 20, baking zone 30, composing scolding tin district 40 and the first post-processed district 50 successively, and right workbench 2 is provided with second installing zone 11 and the second post-processed district 51 successively.
Wherein, left workbench 1 is grown than right workbench 2, all integral manufacturing operations that left workbench 1 is set, and 2 of right workbench are to reprocess product, the preceding operation of then returning that the defective item of inspection can be reprocessed is repaired.
Wherein, first conveyer belt 3 is parallel with left workbench 1, and, described second conveyer belt 4 is parallel with right workbench 2, first conveyer belt 3 is parallel with second driving-belt 4, and workbench is parallel with conveyer belt, makes the whole operation table top be in level, make things convenient for staff's operation, be convenient to the coordination configuration and the uniformity of equipment simultaneously.
Wherein, first installing zone 10 is symmetrical arranged with described second installing zone 11, and the described first post-processed district 50 is symmetrical arranged with the described second post-processed district 51.
The utility model is when work, inductance element is circulated according to production process successively by left workbench 1, pass through installing zone, the operator can wind the line by disposable centralized operation, separated time, make up and twine and cut the pin operation, the product of making is positioned over first conveyer belt 3, be sent to glue application region 20 by first conveyer belt 3, the operator will need the product of a glue to take out on the workbench of glue application region 20 from first conveyer belt 3, after finishing a glue all products are put back at first conveyer belt 3, by that analogy, first conveyer belt 3 is sent to baking zone 30 with product, the composing scolding tin district 40 and the first post-processed district 50, do-over then is placed on second conveyer belt 4 if necessary, and second conveyer belt 4 will need do-over to be sent to installing zone, right workbench 2 personnel check do-over and do over again, and do over again and carry out successively according to operation sequence after finishing.
Above-described the utility model execution mode does not constitute the qualification to the utility model protection range.Any modification of within spirit of the present utility model and principle, being done, be equal to and replace and improvement etc., all should be included within the claim protection range of the present utility model.
Claims (5)
1. semi-automatic production line of inductance element, comprise Zuo Zuotai and right workbench, it is characterized in that, also comprise first conveyer belt and second conveyer belt, described first conveyer belt and second conveyer belt are located between left workbench and the right workbench, described being arranged in order is left workbench, first conveyer belt, second conveyer belt and right workbench, described left workbench is provided with first installing zone, glue application region, baking zone, composing scolding tin district and the first post-processed district successively, and described right workbench is provided with second installing zone and the second post-processed district successively.
2. the semi-automatic production line of a kind of inductance element according to claim 1 is characterized in that, described left workbench is than right work director.
3. the semi-automatic production line of a kind of inductance element according to claim 1 is characterized in that described first conveyer belt is parallel with left workbench, and described second conveyer belt is parallel with right workbench.
4. according to claim 1 or the semi-automatic production line of 3 described a kind of inductance elements, it is characterized in that described first conveyer belt is parallel with second driving-belt.
5. the semi-automatic production line of a kind of inductance element according to claim 1 is characterized in that, described first installing zone and described second installing zone are symmetrical arranged, and described first post-processed district and the described second post-processed district are symmetrical arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201427839U CN202076119U (en) | 2011-05-07 | 2011-05-07 | Inductance component semi-automatic production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201427839U CN202076119U (en) | 2011-05-07 | 2011-05-07 | Inductance component semi-automatic production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202076119U true CN202076119U (en) | 2011-12-14 |
Family
ID=45114210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201427839U Expired - Fee Related CN202076119U (en) | 2011-05-07 | 2011-05-07 | Inductance component semi-automatic production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202076119U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104386441A (en) * | 2014-11-17 | 2015-03-04 | 苏州互强工业设备有限公司 | Production and repair integrated assembly line |
CN104444189A (en) * | 2014-12-05 | 2015-03-25 | 苏州互强工业设备有限公司 | Automatic feed-back conveying line |
CN105881005A (en) * | 2016-02-04 | 2016-08-24 | 深圳市海目星激光科技有限公司 | Automatic assembly line for transformer production |
CN106816308A (en) * | 2017-03-31 | 2017-06-09 | 龙口市埃迪克自动化设备有限公司 | Induction coil full-automatic integral machine production equipment |
CN110695640A (en) * | 2019-10-16 | 2020-01-17 | 深圳雷柏科技股份有限公司 | Intelligent flexible assembly line |
-
2011
- 2011-05-07 CN CN2011201427839U patent/CN202076119U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104386441A (en) * | 2014-11-17 | 2015-03-04 | 苏州互强工业设备有限公司 | Production and repair integrated assembly line |
CN104444189A (en) * | 2014-12-05 | 2015-03-25 | 苏州互强工业设备有限公司 | Automatic feed-back conveying line |
CN105881005A (en) * | 2016-02-04 | 2016-08-24 | 深圳市海目星激光科技有限公司 | Automatic assembly line for transformer production |
CN106816308A (en) * | 2017-03-31 | 2017-06-09 | 龙口市埃迪克自动化设备有限公司 | Induction coil full-automatic integral machine production equipment |
CN106816308B (en) * | 2017-03-31 | 2018-03-13 | 龙口市埃迪克自动化设备有限公司 | Induction coil automatic one machine production equipment |
CN110695640A (en) * | 2019-10-16 | 2020-01-17 | 深圳雷柏科技股份有限公司 | Intelligent flexible assembly line |
CN110695640B (en) * | 2019-10-16 | 2021-06-15 | 深圳雷柏科技股份有限公司 | Intelligent flexible assembly line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202076119U (en) | Inductance component semi-automatic production line | |
CN202668050U (en) | Automatic assembly production line for mobile phones | |
CN103008877A (en) | Automatic welding equipment for magnetic coils | |
CN207338118U (en) | A kind of reactor coiling clamping fixture | |
CN202985723U (en) | Intelligent four-end banding system | |
CN104708325A (en) | Automatic production line for net communication products | |
CN204470894U (en) | A kind of electric pole Making of reinforcement cage machine | |
CN204424663U (en) | A kind of network line crystal head automatic assembling machine | |
CN204565421U (en) | Battery core block and cylindrical electrical core shell automatic welding machine | |
CN203858964U (en) | Shielding winding coiling structure of transformer | |
CN207868060U (en) | A kind of inductance automatic charging coil winding machine | |
CN203607241U (en) | Dry type transformer low-voltage foil coil production line | |
CN206122438U (en) | Shield cover mechanism of bending | |
CN204332600U (en) | A kind of network transformer | |
CN205318980U (en) | Modular magnetic core inductance | |
CN204857390U (en) | Inductor with novel arc magnetic core, flat line wind immediately | |
CN207068619U (en) | A kind of pcb board inductance | |
CN204220514U (en) | Coil winding machine soldering tip debris removal mechanism | |
CN205122350U (en) | Special wave filter magnetic core plastic anchor clamps of elevator | |
CN203568586U (en) | Winding machine alignment structure | |
CN203197457U (en) | Automatic welding apparatus for magnetic coils | |
CN210024020U (en) | Automatic soldering tin equipment of robot | |
CN202711929U (en) | Transformer skeleton | |
CN205069372U (en) | Be applied to vehicle -mounted transformer automation line's spiral mechanism | |
CN204223942U (en) | Wire coiling machine discharging feed arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111214 Termination date: 20120507 |