CN202073071U - Remote automatic measurement and control equipment for small and medium sized reservoirs and hydropower stations - Google Patents

Remote automatic measurement and control equipment for small and medium sized reservoirs and hydropower stations Download PDF

Info

Publication number
CN202073071U
CN202073071U CN2011200749483U CN201120074948U CN202073071U CN 202073071 U CN202073071 U CN 202073071U CN 2011200749483 U CN2011200749483 U CN 2011200749483U CN 201120074948 U CN201120074948 U CN 201120074948U CN 202073071 U CN202073071 U CN 202073071U
Authority
CN
China
Prior art keywords
control circuit
gate
input
plc
relay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200749483U
Other languages
Chinese (zh)
Inventor
王超
徐立中
李臣明
樊棠怀
严锡君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN2011200749483U priority Critical patent/CN202073071U/en
Application granted granted Critical
Publication of CN202073071U publication Critical patent/CN202073071U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

The utility model discloses remote automatic measurement and control equipment for small and medium sized reservoirs and hydropower stations, which comprises a gate subsystem and N field wireless access devices. The gate subsystem is composed of N wireless APs (access points) and an industrial integrated monitoring host, and each field wireless access device comprises a wireless client module ST (system test), a communication processor module and an in-situ measurement and control unit. The remote automatic measurement and control equipment is easy in wiring, low in cost, simple in maintenance and high in reliability.

Description

Medium and small reservoir, power station remote automation measuring and controlling equipment
Technical field
The utility model relates to a kind of medium and small reservoir, power station remote automation measuring and controlling equipment, especially a kind of reservoir, gate of hydropower station control working method able to programme and control system based on 5GHz FHSS wireless industrial technology.Belong to the industrial automation technical field.
Background technology
At present, reservoir, gate of hydropower station industry measurement and control system mainly adopt terrain control and the mutually redundant control mode of Long-distance Control, as the gate of intake of hydropower station, hydraulic turbine delivery port, water inlet trashrack.Equipment mainly is core with the industrial control computer, and the terrain electrical control equipment adopts relay logic control to combine with PLC control.Be mainly the fieldbus mode between control centre and the terrain observing and controlling screen or based on the wire communication mode of Industrial Ethernet network, support multiple cables such as coaxial cable, twisted-pair feeder and optical fiber as transmission medium, though it is strong to have stability, speed is fast, advantages such as safety height, it is complicated also to exist wiring, and construction is difficult for, cost is higher, safeguards defectives such as inconvenience.
Especially in water power automatic industrial field, since a lot of territorial environment complexity, inclement condition, wire communication cable distribution difficulty, the maintenance cost height, the stability of wire communication and safety can't effectively be guaranteed.
In addition, when reservoir, gate of hydropower station industry measurement and control system change control mode at needs, mainly assign instruction, by the change-over switch realization of terrain staff manual operation site plant by the dispatcher of control centre.But when terrain staff night's rest or of short duration going out not at the scene, when needing promptly gate to be carried out Long-distance Control again, control centre's computer can't be forced the switching controls mode conversion switch, realizes Long-distance Control, and the safe flood discharge in reservoir, power station has been caused certain potential safety hazard.
The utility model content
The utility model purpose be between gate control centre and terrain observing and controlling screen geographically by the river, the valley cuts off, when be difficult to realizing wire communication, utility model able to programme control working method and the automated system of one cover based on the wireless industrial frequency hop spread spectrum.The utility model provides a kind of medium and small reservoir, power station remote automation measuring and controlling equipment, the industry wireless network technology is applied to the Long-distance Control of control able to programme (PLC) and relay logic control appliance, the solution of long-range pressure switching controls mode is provided simultaneously, has realized the Redundant Control structure that remote wireless control, terrain PLC control automatically and three kinds of control modes of the manual control of conventional relay are formed gate.When system normally moved, the switching of three kinds of control modes was operated the control mode change-over switch by the terrain staff and is realized.But when terrain staff post away from keyboard or night's rest, control mode is in the terrain relay again manually or during terrain PLC automatic control mode, Surveillance center's host computer can long-range pressure switch operating mode be a distant place automatic control mode, is directly controlled the operation of terrain equipment by Surveillance center's host computer.
The utility model adopts following technical scheme for achieving the above object:
The medium and small reservoir of the utility model, power station remote automation measuring and controlling equipment, comprise gate subsystem and N on-site wireless access device, wherein the gate subsystem is made up of N wireless access point AP and integration of industry monitoring host computer, the on-site wireless access device all comprises wireless client module ST, communication processor module and terrain measurement and control unit, and WAP is interconnected interconnected with integration of industry monitoring host computer by hybrid junctioin (IP65) access industrial Ethernet; Wireless client module ST passes through hybrid junctioin (IP65) access industrial Ethernet respectively, and connects pairing communication processor module, and then realizes interconnected communication with the terrain measurement and control unit.
Described terrain measurement and control unit comprises PLC control circuit, LCD touch display screen, Motor Control loop, hydraulic hoist, relay logic control circuit, gatage sensor, gate load sensor, wireless client ST and 24VDC dc source; The output of hydraulic hoist connects an input of PLC control circuit and relay logic control circuit respectively, one of PLC control circuit input output respectively with an output of relay logic control circuit input be connected, the output of gatage sensor and gate load sensor connects an input of PLC control circuit respectively, the input of the output termination hydraulic hoist in Motor Control loop, an output of PLC control circuit and relay logic control circuit connects the input in Motor Control loop respectively, the input that PLC another one output/input connects the LCD touch display screen respectively fail/goes out end, the PLC control circuit is connected with wireless client module ST by communication processor module CP341-1 access industrial Ethernet, and the 24VDC dc source connects the PLC control circuit respectively, the LCD touch display screen, the Motor Control loop, the relay logic control loop and, the input of wireless client module ST.
The beneficial effects of the utility model comprise following aspect:
1, utility model provides a kind of based on 5GHz FHSS industry wireless communication network platform, break through geological restraint, the industry wireless network technology is applied to the Long-distance Control of gate monitoring system, for gate is controlled on-the-spot because the territorial environment complexity, inclement condition, wire communication difficult wiring even solution effectively is provided can't connect up the time, and wiring is easily, with low cost, safeguard simple.
2, the utility model has defined the application layer communications protocol that a cover is specifically designed to Long-distance Control, when the Long-distance Control gate moves, just finally confirm and execution after twice checking of control instruction process terrain measurement and control unit that host computer sends is errorless, guaranteed to pass through in the utility model the reliability of the Long-distance Control of wireless industrial network realization.
3, provide remote wireless control, terrain PLC to control automatically and the manual Redundant Control structure of controlling three kinds of control modes compositions of conventional relay in the utility model to gate.Generally, the switching of control mode is finished by terrain staff manual operation, but is running into emergency or night during on-the-spot unmanned, and host computer can long-range pressure switching controls mode, realizes the Remote at any time to terrain equipment.
Description of drawings
Fig. 1 forms schematic diagram for the utility model equipment.
Fig. 2 is a terrain measurement and control unit block diagram.
Fig. 3 is a Motor Control loop block diagram.
Fig. 4,5 is the schematic diagram of conventional relay logic control circuit.
Fig. 6 is the schematic diagram that concerns of CPU in the Controlled by Programmable Controller circuit and industrial touch screen (LCD) input, output.
Fig. 7 is a gatage sensor input circuit schematic diagram in the Controlled by Programmable Controller circuit.
Fig. 8 is operating gate and the status signal input circuit schematic diagram in the Controlled by Programmable Controller circuit.
Fig. 9 shows the output circuit schematic diagram for driving electromagnetic valve input circuit and state light in the Controlled by Programmable Controller circuit.
Figure 10 is a host computer Long-distance Control gate operational flow diagram.
Figure 11 is that gate control mode flow chart is switched in the long-range pressure of host computer.
The specific embodiment
Contrast accompanying drawing 1, the utility model is made up of gate Centralized Monitoring center, a N terrain measurement and control unit and wireless communication network system.Gate Centralized Monitoring center mainly comprises integration of industry monitoring host computer and monitoring software system, is responsible for the global monitoring and the scheduling of gate monitoring system.Each gate terrain measurement and control unit (LCU) mainly comprises equipment such as programmable logic controller (PLC) control circuit, conventional relay logic control circuit, industrial touch screen (LCD), Motor Control loop, hydraulic hoist, 24V dc source and gatage sensor, gate load sensor, each terrain measurement and control unit is by Siemens Communications processor module CP341-1 access industrial Ethernet, at last by Siemens wireless client module ST access industrial Radio Network System.The industry wireless network system mainly is made up of N wireless access point AP (model is Siemens wireless communication module W-788) and N wireless client module ST (model is Siemens wireless communication module W744-1PRO).Meet the IEEE802.11 standard, operating frequency is 5.15GHz-5.25GHz, and transmission means adopts OFDM (OFDM), and power is 1W, and bandwidth is 54 MBit/sec, and transmission range is 1km.
Contrast accompanying drawing 2,1 among the figure " being PLC control circuit, 2 " are that LCD touch display screen, 3 " being Motor Control loop, 4 " is that hydraulic hoist, 5 " being relay logic control circuit, 6 " is that gatage sensor, 7 " being gate load sensor, 8 " is that wireless client ST, 9 " and 10 " is the 24VDC dc source.
" oil circuit electromagnetic valve, contact point signals such as master controller input to control relay circuit and PLC control circuit respectively to 4 " output of hydraulic hoist connects 1 respectively " PLC control circuit and 5 for an input of relay logic control circuit, oil level signal meter.An output of 1 " one of PLC control circuit input output respectively with 5 " relay logic control circuit input is connected, PLC is to the control output of conventional relay circuit and the input of routine and appliance circuit working state signal in realization.The output of 6 " gatage sensor and 7 " gate load sensor connects 1 a respectively " input of PLC control circuit.3 " input of the output termination hydraulic hoist in Motor Control loop, an output of 1 " PLC control circuit and 5 " relay logic control circuit connects 3 respectively, and " input in Motor Control loop is used to control the start and stop of oil pump motor.The input of 1 " PLC another one output/input connects 2 respectively " LCD touch display screen fail/goes out end, and LCD can show that the status informations such as gatage of PLC output also can preset parameter confession PLC execution such as gatage.1 " the PLC control circuit is by communication processor module CP341-1 access industrial Ethernet and 8 " wireless client module ST is connected.The 24VDC dc source connects 1 respectively " PLC control circuit, 2 " LCD touch display screen, 3 " Motor Control loop, the input of 5 " relay logic control loop and 8 " wireless client module ST.
The utensil of installing on the hydraulic hoist comprises: oil pump motor, oil level signal meter, oil circuit electromagnetic valve, master controller etc.Gatage sensor and load sensor are installed on the gate, to measure gatage and loading.PLC control circuit output gatage and loading information realize that by the LCD touch display screen numeral and figure show.
Carry out radio communication by what wireless client module ST and wireless access point AP were formed based on wireless industrial fhss network platform between terrain measurement and control unit and the gate Surveillance center, realize the terrain equipment working state, the up and host computer of the data of gatage, loading signal sends the descending of control signal.
Contrast accompanying drawing 3, line breaker DL1, DL3 connect the 380VAC power supply, and line breaker DL2 connects the 220VAC power supply.Relay tip JJ1 connects motor E1 by thermal relay RJ1, and relay tip JJ2 connects motor E2 by thermal relay RJ3.A wherein phase W of 380VAC power supply is connected with relay tip JD1 is corresponding with JD2 through fuse Fuse1.Relay tip JD1, the other end of JD2 is connected with relay line bag DCF1 through thermal relay RJ2.Mutual inductor H1, H2, H3 and ammeter A1, A2, the corresponding connection of A3.Triple line U, V, W be the indirect voltmeter of phase line U, V wherein.A wherein phase W of 380VAC power supply is connected with relay tip JD3 is corresponding with JD4 through fuse Fuse6.
Contrast accompanying drawing 4, line breaker DL4 connects the 220VAC power supply through fuse Fuse7, dc source SITOP becomes AC power 220VAC into direct current 24VDC power supply, and the L+ end of dc source SITOP is weighed selector switch KG1, working barrel selector switch KG2 and the corresponding connection of accumulator change-over switch KG3 with operation respectively.L-end and the relay line bag DCF0 of dc source SITOP, DCF2, DCF3, DCF4, DCF6, DCF7, DCT1, DCT2 and relay tip JDQ1, JDQ2, JDQ3, JDQ4 is corresponding to be connected.Operation power selector switch KG1, working barrel selector switch KG2, accumulator change-over switch KG3 respectively with relay tip JDQ5, JDQ6 is corresponding to be connected.Stop button AN3, rise door button AN1 and relay line bag DCF4, DCF9, DCF8 is corresponding to be connected, rise a button KG1 again with the corresponding connection of relay line bag DCF3.A button KG2 and relay line bag DCF3 fall, DCF5, and DCF7 is corresponding to be connected.
Contrast accompanying drawing 5, relay line bag DCF8, DCF7 and electromagnetic valve YV1, YV2, YV3, the end of YV4 is corresponding short circuit respectively, relay line bag DCF8, the other end of DCF7 respectively with relay tip JDQ8, JDQ7 is corresponding to be connected, and corresponding with the relay tip JDQ9 respectively connection of the other end of overflow valve YV1 is connected in series with relay line bag DCF2 simultaneously.Rise the corresponding connection of the other end of door electromagnetic valve YV2, be connected in series with relay line bag DCF6 simultaneously with relay tip JDQ11.Fall an electromagnetic valve YV3, corresponding with the relay tip JDQ13 respectively connection of the other end of YV4 is connected in series with relay line bag DCF7 simultaneously.The end of indicator lamp ZS1 ~ ZS8 is corresponding short circuit respectively, the other end of indicator lamp ZS1 ~ ZS8 respectively with relay line bag DCF0, DCF10, DCF3, DCF4, DCF8, DCF7, DCF11 are corresponding respectively to be connected.
Contrast Fig. 6, the PLC control circuit is mainly by power module PS307, central processor unit module CPU315, communication processor module CP341-1, input module SM321/ output module SM322 (D1~D6) form.The aperture of gate and demonstration and parameter setting are realized that by the LCD touch display screen display screen adopts the DM-121GS industrial touch screen.The PLC control circuit is by communication processor module CP341-1 access industrial Ethernet Ethernet.
Contrast Fig. 7, the outputting data signals of gatage sensor is SM321 through the corresponding input interface module D1(model that inserts the PLC control circuit of transmitter DL-150) 2~19 ends.The 1st end of D1 is connected with power supply 24VDC anode, and the 20th end is connected with power supply 24VDC negative terminal.
The contrast Fig. 8, input interface module D3(model is SM321) the 1st end be connected with power supply 24VDC anode, the 20th end is connected with power supply 24VDC negative terminal.The 2nd~8 end of input interface module D3 is connected with power supply 24DC anode through mode of operation change-over switch KG1, oil pump selector switch KG2, accumulator change-over switch KG3.The 16th~19 end of input interface module D3 through rise door button AN1, fall a button AN2, stop button AN3, fault reset button AN4 is connected with power supply 24VDC anode.The 8th~9 end of input interface module D3 is connected with power supply 24VDC anode through having or not PLC cut-in relay contact JDQ14 and inserting standby control power supply relay contact JDQ15 respectively.11~15 standby ports of input interface module D3.
The 1st end and the 11st end of output interface module D4 (model is SM322) are connected with power supply 24VDC anode, and the 10th end and the 20th end are connected with power supply 24VDC negative terminal.The 2nd~9 end of output interface module D4 is respectively by relay pack DCF12~DCF19 and the corresponding connection of power supply 24VDC negative terminal.The 12nd~15 end of output interface module D4 is respectively by relay pack DCF20~DCF23 and the corresponding connection of power supply 24VDC negative terminal.The 16th, 17,18,19 ends of input interface module D4 are standby end.
The contrast Fig. 9, input interface module D5(model is SM321) the 1st end be connected with power supply 24VDC anode, the 20th end is connected with power supply 24VDC negative terminal.The 2nd end of input interface module D5 is connected with power supply 24VDC anode through headstock gear oil circuit superpressure contact JDQ16, JDQ17 respectively with the 3rd end.The 4th end of input interface module D5 is respectively 1# FP Fuel Pump Relay contact JDQ18 with the 5th end, 2# FP Fuel Pump Relay contact JDQ19 is connected with power supply 24VDC anode.The 7th~12 end of input interface module D5 contact JDQ23, gate fully open position contact JDQ24, the gate complete shut-down position contact JDQ25 of contact JDQ22, the gate downslide G2 of process gate full open contact JDQ20, gate complete shut-down contact JDQ21, gate downslide G1 respectively is connected with power supply 24VDC anode.The 14th, 16 ends of input interface module D5 pass through gate lubricating oil pump electromotor overload contact JDQ26 respectively, and accumulator electromotor overload contact JDQ27 is connected with power supply 24VDC anode.The 6th end of input interface module D5, the 13rd end and the 16th~19 end are standby end.
The 1st end and the 11st end of output interface module D6 (model is SM322) are connected with power supply 24VDC anode, and the 10th end and the 20th end are connected with power supply 24VDC negative terminal.The 2nd~9 end of output interface module D6 is connected with power supply 24VDC anode through indicator lamp ZS9~ZS16.The 17th, 18 ends of output interface module D6 pass through resistance R 1(400 Ω respectively), R2 (400 Ω) is by relay tip JDQ28 and the corresponding connection of power supply 24VDC anode.15,16 and 19 ports of output interface module D6 are standby end.
The gate control mode has three kinds in the utility model, is respectively: the conventional relay manual work of terrain mode, terrain PLC automated manner, the automatic working method in a distant place.The switching of three kinds of control modes is mainly operated control change-over switch KG1 (representing) realization by the staff of terrain measurement and control unit in Fig. 8.Gate Surveillance center host computer can be by the long-range pressure change-over switch KG1 of instruction to distant place automatic mode, need not to operate manually, when guaranteeing the terrain staff away from keyboard or night's rest, gate Centralized Monitoring center can be realized the Long-distance Control to terrain equipment at any time.
Terrain manual work mode:
Terrain manual work mode does not have the PLC control circuit to participate in, and realizes control by the conventional relay circuit of terrain staff manually-operated fully.
(1-1) preparation.The terrain staff will control change-over switch KG1 (representing) and place " terrain is manual " position in Fig. 8, KG2(represents in Fig. 8 with the oil pump selector switch) place " 1# oil pump position ", KG3(represents in Fig. 8 with the accumulator change-over switch) place " automatically " position.
(1-2) rise door operation.The terrain staff presses and rises door button AN1 in the relay logic control circuit, auxiliary reclay line bag (DCF3), relay tip (JDQ1) and time relay line bag (the DCT2) (AN1 that powers on, DCF3, JDQ1, DCT2 represents in Fig. 4), A.C. contactor (JJ2, JJ1 represents in Fig. 3) and relay (DCF2, in Fig. 4, represent) connect, accumulator motor (E2) and 1# oil pump motor (E1) operation (E1, E2 represents in Fig. 3), overflow valve (YV1, represent among Fig. 5 again) energising, the time-delay of DCT2 time-delay break contact is after ten seconds, and DCF2 disconnects, overflow valve (YV1) dead electricity, this moment relay (DCF6, in Fig. 4, represent) must be electric, rise a door electromagnetic valve (YV2) and power on, gate begins to promote, indicator lamp (ZS4 represents in Fig. 5) is lighted.
When if gate arrives fully open position; gate upper limit relay tip (JDQ8; in Fig. 5, represent) connect, rise thresholding position relay (DCF8 represents) and get in Fig. 4; rise door relay (DCF6; in Fig. 4, represent) dead electricity, A.C. contactor JJ1, JJ2 disconnect, and oil pump motor and accumulator motor are shut down; indicator lamp (ZS3 represents in Fig. 5) is lighted.
(1-3) door operation falls.The terrain staff presses the button AN2 that falls in the relay logic control circuit, auxiliary reclay line bag (DCF2, DCF4 represents in Fig. 4), relay tip (the JDQ1) (AN2 that powers on, DCF2, DCF4, JDQ1 represents in Fig. 4), A.C. contactor (JJ1 represents in Fig. 3) and relay (DCF2, in Fig. 4, represent) connect, oil pump motor E1 operation, overflow valve (YV1, represent among Fig. 5 again) energising, the time-delay of DCT2 time-delay break contact is after ten seconds, DCF2 disconnects, overflow valve (YV1) dead electricity is fallen a relay (DCF7 represents) and get this moment in Fig. 4, an electromagnetic valve (YV3 falls, YV4) power on, gate begins to descend, and indicator lamp (ZS5 represents in Fig. 5) is lighted.
If during in fully open position, connect by gate lower limit relay tip (JDQ7 represents in Fig. 5) in the decline anteposition for gate, spacing auxiliary reclay (DCF7 represents in Fig. 5) electric, auxiliary contact reaches long closing by long, preparation is finished.The terrain staff presses the button AN2 that falls in the relay logic control circuit, and gate descends (process is the same), and indicator lamp (ZS5 represents in Fig. 5) is lighted.
After gate dropped to full close position, gate lower limit relay tip (JDQ7 represents in Fig. 5) was connected, fall a relay (DCF7 represents in Fig. 4) dead electricity, A.C. contactor JJ1 disconnects, oil pump motor E1 dead electricity, indicator lamp (ZS3 represents in Fig. 5) is lighted.
(1-4) shutdown operation.The terrain staff presses the stop button AN3 in the relay logic control circuit, can force gate any time shutdown at an arbitrary position, manipulates when emergency and maintenance repair usually.
The automatic working method of terrain:
(2-1) connect PLC dc source and control circuit power supply.To operate power selector switch (KG1 represents) and put " terrain is automatic " position in Fig. 8, working barrel selector switch (SA2) will be put 1# oil pump position, the accumulator change-over switch will be put " automatically " position.
(2-2) open door operation.The terrain staff at first is provided with the particular location that gate will rise to by industrial touch screen (LCD represents) in Fig. 6, press and rise door button (AN1 represents) in Fig. 8.PLC is according to program work, and auxiliary reclay (DCF14, DCF18 represent in Fig. 8) gets, Oil pump electrical machinery (E1 represents in Fig. 3), accumulator motor (E2, in Fig. 3, represent) operation, overflow valve (YV1 represents in Fig. 5) energising, delay time after ten seconds DCF14, YV1 outage, relay (DCF12 at this moment, in Fig. 8, represent) must be electric, rise a door electromagnetic valve (YV5 represents) and power in Fig. 5, gate begins to promote, and indicator lamp (ZS10 represents in Fig. 9) is lighted.When gate rose to assigned address, A.C. contactor (JJ1, JJ2 represents in Fig. 3), DCF12, YV2 outage stopped.
(2-3) door operation falls.The assigned address of door at first falls in the terrain staff by the industrial touch screen setting, by the door button (AN2 represents in Fig. 8) that descends, PLC is according to program work.Auxiliary reclay (DCF14, DCF18), A.C. contactor (JJ1) gets electric, and Oil pump electrical machinery (E1) brings into operation, overflow valve (YV1, in Fig. 5, represent) energising, delay time after ten seconds, DCF14, YV1 outage, (DCF13 represents in Fig. 8 relay, DCF7 represents in Fig. 4), falling an electromagnetic valve (YV3, YV4) must be electric, and gate descends, and indicator lamp (ZS10 represents in Fig. 9) is lighted.After gate drops to assigned address, DCF13, JJ1, YV3, YV4 outage stop.
(2-4) shutdown operation.Press stop button (AN3 represents in Fig. 8), gate is shut down.
(2-5) reset operation.As system's generation emergency or when running into fault, can press fault reset button (AN4 represents) in Fig. 8, system's hard stop also resets.
The automatic working method in a distant place:
Under the automatic in the distance working method; the monitoring software of dispatcher by installing on the Industrial Personal Computer (IPC) at gate Centralized Monitoring center; send and rise door, fall door, shutdown, reseting controling signal, control signal is received by the communication processor module of terrain measurement and control unit PLC by 5GHz FHSS industry wireless network and Industrial Ethernet.PLC is when concrete the execution, and control flow is with (2-1) ~ (2-5) identical, but without any need for operation manually, is finished automatically by PLC, thereby realizes the remote wireless control to the operation of terrain gate to gate Surveillance center.
Communicating by letter in the utility model between the wireless client module of wireless access point AP and terrain measurement and control unit adopted the TCP/IP transmission control protocol, adopts three-way handshake to connect.The IP address that can set the pairing wireless access point AP of host computer is 192.168.0.1, and the wireless client module I P address of one of them terrain measurement and control unit correspondence is 192.168.0.2.
As follows in the process of connecting:
IP?192.168.0.1.3337?>?192.168.0.2.7788:?S?8445216321:8445216321
IP?192.168.0.2.7788?>?192.168.0.1.3337:?S?2563521458:2563521458?ack?3626544837
IP?192.168.0.1.3337?>?192.168.0.2.7788:?ack?1739326487,ack?1
192.168.0.1 send bit code syn=1, the packet that produces seq number=8445216321 at random is to 192.168.0.2.192.168.0.2 know that by SYN=1 192.168.0.1 requires to connect.
192.168.0.2 will confirm on-line information after receiving request, send ack number=844521632 to 192.168.0.1, syn=1, ack=1 produces the bag of seq=2563521458 at random.
Check whether ack number is correct 192.168.0.1 receive the back, the i.e. seq number+1 that sends for the first time, and bit code ack is not 1, if it is correct, 192.168.0.1 can send ack number=2563521458 again, ack=1,192.168.0.2 receive that the back confirms that seq=seq+1, ack=1 then connect and set up successfully.After connection is set up successfully, begin to transmit data.
When carrying out the data transmission, in order to guarantee between host computer and the terrain measurement and control unit after the radio communication of having passed through distance about a km, still can realize quick, accurate, reliable, safe transfer of data, the utility model in application layer according to the actual requirements, a self-defined cover is specifically designed to the application layer protocol of Long-distance Control, be data communication protocol (double byte data low eight preceding, high eight-bit is in the back), form is: packet header, according to length, data user, short address, effect sign indicating number.
1, gather gate start-stop information:
Send: 01 02 LSB MSB FF session address, 01 CRC
Receive: 01 02 LSB MSB FF session address, 01 LSB CRC
For example:
Send: 01 02 01 00 FF 01 00 01 25
Receive: 01 02 02 00 FF, 00 00 01 LSB 25
Send: 01 02 01 00 FF 01 00 01 25
Receive: 01 02 02 00 FF, 01 00 01 0F, 25 on off states are for opening
Receive: 01 02 02 00 FF, 01 00 01 F0,25 on off states are for closing
It is the logical zero state that remarks: 0x0F represents low level, and it is the logical one state that 0xF0 represents high level.
2, gather the aperture analog quantity information:
Send: 01 02 LSB MSB FF session address, 02 CRC
Receive: 01 02 LSB MSB FF session address, 02 LSB MSB CRC
For example:
Send: 01 02 03 00 FF 02 00 02 36
Receive: 01 02 04 00 FF, 00 00 02 LSB MSB CRC
Send: 01 02 03 00 FF 02 00 02 36
Receive: 01 02 04 00 FF, 03 00 02 F0 0F 36 (test is used)
Receive: 01 02 04 00 FF 03 00 02 14 37 (0x3714)
3, regulating gate lifting:
Send: 01 02 LSB MSB FF session address, 03 CRC
Receive: 01 02 LSB MSB FF session address, 03 LSB CRC
Send: 01 02 LSB MSB FF session address, 03 LSB MSB CRC
Receive: 01 02 LSB MSB FF session address, 03 LSB MSB LSB CRC
Send: 01 02 LSB MSB FF session address, 03 LSB MSB LSB MSB CRC
Receive: 01 02 LSB MSB FF session address, 03 LSB MSB CRC
For example:
Send: 01 02 05 00 FF 00 00 03 23
Receive: 01 02 06 00 FF 01 00 03 17 23
Send: 01 02 05 00 FF, 00 00 03 17 FF/00 23 // rising/declines
Receive: 01 02 06 00 FF, 01 00 03 17 FF/00 16 23
Send: 01 02 05 00 FF, 00 00 03 17 FF/00,16 xx 23 // rising/decline X
Receive: 01 02 06 00 FF 01 00 03 17 16 23
Remarks: rise (0XFF), descend (0x00)
4, forcing the switching controls switch is that a distant place is automatic
Send: 01 02 LSB MSB FF session address, 04 CRC
Receive: 01 02 LSB MSB FF session address, 04 LSB CRC
Send: 01 02 LSB MSB FF session address, 04 LSB MSB CRC
Receive: 01 02 LSB MSB FF session address, 04 LSB CRC
For example:
Send: 01 02 07 00 FF, 02 00 04 FB
Receive: 01 02 08 00 FF 01 00 04 00 18
Send: 01 02 07 00 FF, 02 00 04 00 FF 18 (sending switching command, unique)
Receive: 01 02 08 00 FF, 01 00 04 FF 18
According to above communication protocol, as shown in figure 10, under the automatic in the distance working method, realize that the flow process of Long-distance Control is:
Step1: the host computer at gate Centralized Monitoring center sends the control request to the terrain measurement and control unit.
Step2: the terrain measurement and control unit sends the request of receiving to host computer and notifies after the control request of receiving host computer, and subsidiary effect sign indicating number A1.
Step3: host computer sends to the terrain measurement and control unit with order of gate lifting/lowering and the identifying code A1 that receives after the notice of receiving the terrain measurement and control unit.
Step4: the terrain measurement and control unit judges whether effect sign indicating number A1 changes after receiving the order of gate lifting/lowering, confirms notice if no change sends to host computer, and notice comprises order of gate lifting/lowering and the effect sign indicating number A1 that receives, and newly additional effect sign indicating number A2.If effect sign indicating number A1 changes, then re-execute Step2.
Step5: host computer is after receiving the affirmation notice of terrain measurement and control unit, whether check A1 changes, if no change then sends gate lifting/lowering value B to the terrain measurement and control unit, comprise the order of gate lifting/lowering, gate lifting/lowering occurrence B, effect sign indicating number A1 and A2 in the transmission packet.If A1 changes, re-execute Step3.
Step6: the terrain measurement and control unit is behind the bag that receives orders, and whether check effect sign indicating number A2 changes, if no change, then carry out the lifting/lowering of gate by the PLC control circuit according to instruction, the height of lifting/lowering is B, complete after, send the notice that runs succeeded to gate Surveillance center host computer.If A1, A2 change, then re-execute Step4.
As shown in figure 11, the control flow of executing the automatic working method in a distant place by host computer is:
Step1: the host computer at gate Centralized Monitoring center sends the control mode query requests to the terrain measurement and control unit.
Step2: the terrain measurement and control unit sends current control mode notice to host computer after receiving the query requests of host computer, if current be " terrain is manual " or " terrain is automatic " working method, then send field 0x00, and subsidiary effect sign indicating number C.
Step3: host computer if receive that field is 0x00, is then assigned the order of switching controls mode and is sent field 0x00FF after receiving the current control mode notice of terrain measurement and control unit, and subsidiary effect sign indicating number C, otherwise, send 0xFF00 and subsidiary effect sign indicating number C.
Step4: the terrain measurement and control unit is after receiving orders, judge whether effect sign indicating number C changes, during the C no change, if receive that field is 0x00FF, then the PLC control circuit automatic transfer switch KG1 (representing in Fig. 8) by the terrain measurement and control unit places " distant place is automatic " position, otherwise the PLC control circuit is not done any response.If C changes, then re-execute Step2.
Step5: after terrain measurement and control unit PLC is complete, send the affirmation notice to gate Centralized Monitoring center.

Claims (2)

1. a medium and small reservoir, power station remote automation measuring and controlling equipment, it is characterized in that comprising gate subsystem and N on-site wireless access device, wherein the gate subsystem is made up of N wireless access point AP and integration of industry monitoring host computer, the on-site wireless access device all comprises wireless client module ST, communication processor module and terrain measurement and control unit, and WAP is interconnected interconnected with integration of industry monitoring host computer by hybrid junctioin (IP65) access industrial Ethernet; Wireless client module ST passes through hybrid junctioin (IP65) access industrial Ethernet respectively, and connects pairing communication processor module, and then realizes interconnected communication with the terrain measurement and control unit.
2. medium and small reservoir according to claim 1, power station remote automation measuring and controlling equipment is characterized in that described terrain measurement and control unit comprises PLC control circuit, LCD touch display screen, Motor Control loop, hydraulic hoist, relay logic control circuit, gatage sensor, gate load sensor, wireless client ST and 24VDC dc source; The output of hydraulic hoist connects an input of PLC control circuit and relay logic control circuit respectively, one of PLC control circuit input output respectively with an output of relay logic control circuit input be connected, the output of gatage sensor and gate load sensor connects an input of PLC control circuit respectively, the input of the output termination hydraulic hoist in Motor Control loop, an output of PLC control circuit and relay logic control circuit connects the input in Motor Control loop respectively, PLC another one output/input connects the I/O end of LCD touch display screen respectively, the PLC control circuit is connected with wireless client module ST by communication processor module CP341-1 access industrial Ethernet, and the 24VDC dc source connects the PLC control circuit respectively, the LCD touch display screen, the Motor Control loop, the input of relay logic control loop and wireless client module ST.
CN2011200749483U 2011-03-21 2011-03-21 Remote automatic measurement and control equipment for small and medium sized reservoirs and hydropower stations Expired - Fee Related CN202073071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200749483U CN202073071U (en) 2011-03-21 2011-03-21 Remote automatic measurement and control equipment for small and medium sized reservoirs and hydropower stations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200749483U CN202073071U (en) 2011-03-21 2011-03-21 Remote automatic measurement and control equipment for small and medium sized reservoirs and hydropower stations

Publications (1)

Publication Number Publication Date
CN202073071U true CN202073071U (en) 2011-12-14

Family

ID=45111174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200749483U Expired - Fee Related CN202073071U (en) 2011-03-21 2011-03-21 Remote automatic measurement and control equipment for small and medium sized reservoirs and hydropower stations

Country Status (1)

Country Link
CN (1) CN202073071U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103374902A (en) * 2012-04-13 2013-10-30 江苏武进液压启闭机有限公司 Remote-sensible high-precision ceramic-piston-rod hydraulic open-close machine system
CN105703323A (en) * 2015-12-15 2016-06-22 昆明七五零高新技术公司 Water gate overload protection method and water gate overload protection device
CN106707997A (en) * 2016-12-30 2017-05-24 福建工程学院 Hydropower station remote monitoring system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103374902A (en) * 2012-04-13 2013-10-30 江苏武进液压启闭机有限公司 Remote-sensible high-precision ceramic-piston-rod hydraulic open-close machine system
CN105703323A (en) * 2015-12-15 2016-06-22 昆明七五零高新技术公司 Water gate overload protection method and water gate overload protection device
CN106707997A (en) * 2016-12-30 2017-05-24 福建工程学院 Hydropower station remote monitoring system

Similar Documents

Publication Publication Date Title
CN103812219B (en) A kind of many energy-accumulating power station associating long distance control systems
CN201608541U (en) Solar-energy photovoltaic intelligent power station based on Ethernet
CN202435131U (en) Power distribution automation terminal
CN201156681Y (en) Intelligent power distribution system
CN105471109A (en) Intelligent power consumption management system facing household wind and solar energy mutual-complementing power station and management method thereof
AU2010285341A1 (en) Power regulating system for solar power station
CN104270413A (en) Communication system and method for dispatching of distributed micro power grid
CN114285159B (en) Energy control system for transformer area
CN202073071U (en) Remote automatic measurement and control equipment for small and medium sized reservoirs and hydropower stations
CN110341530A (en) New-energy automobile alternating-current charging pile cluster and Poewr control method based on cloud platform
CN102176155B (en) Programmable system as well as deployment and control methods based on industrial wireless frequency-hopping spectrum-spread
CN103595044A (en) Diesel power generation system applied to isolated sea island micro-grid
CN103236707A (en) Large-scale energy storage system and monitoring platform thereof
CN202651899U (en) Automatic voltage control system for wind power plant
CN112114554A (en) Wireless control system and method for power supply on-off of power equipment
CN103603768B (en) Variable pitch control system and charging management control method of high-power wind generating set
CN201430709Y (en) Special remote wireless control multiplex protection power-saving system for street lamp
CN202275317U (en) Remote monitoring maintenance system based on third generation (3G) and wind-light complementary power supply technology
CN104539050B (en) It can believe router and the application system for managing electric energy network and information network
CN105703482A (en) Implementation method for telecontrol channel of power quick adjustment system in hydropower station
CN203278254U (en) Large-scale energy storage system and monitoring platform thereof
CN109299874A (en) A kind of PMS power management system and method, information data processing terminal
CN207261178U (en) A kind of wind-driven generator controls simulator
CN206812816U (en) Electric charging station and charging and conversion electric control system
CN201945875U (en) Remote control device for monitor terminal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111214

Termination date: 20140321