CN202062165U - Welding joint structure of precast steel ring sleeve at position of concrete pipe pile floorslab in top down construction - Google Patents

Welding joint structure of precast steel ring sleeve at position of concrete pipe pile floorslab in top down construction Download PDF

Info

Publication number
CN202062165U
CN202062165U CN2011200883001U CN201120088300U CN202062165U CN 202062165 U CN202062165 U CN 202062165U CN 2011200883001 U CN2011200883001 U CN 2011200883001U CN 201120088300 U CN201120088300 U CN 201120088300U CN 202062165 U CN202062165 U CN 202062165U
Authority
CN
China
Prior art keywords
welding
pile tube
concrete pile
pipe pile
steel ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200883001U
Other languages
Chinese (zh)
Inventor
许文冲
谭志斌
张志敏
王湫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN2011200883001U priority Critical patent/CN202062165U/en
Application granted granted Critical
Publication of CN202062165U publication Critical patent/CN202062165U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a top down construction, in particular to a welding joint structure of a precast steel ring sleeve at the position of a concrete pipe pile floorslab in top down construction, which comprises an upper steel ring sleeve welded to a main bar of the concrete pipe pile and spiral hoops welded to the upper portion and the lower portion of the steel ring sleeve in surrounding mode. Z-shaped bars are welded to two ends of the main bar of the concrete pipe pile respectively. The welding joint structure of the precast steel ring sleeve at the position of the concrete pipe pile floorslab in the top down construction meets the design requirement that the precast steel ring must be formed into an integrated bearing body with a main bearing bar of the concrete pipe pile, in addition, processing and material preparation is convenient, and the welding operation is finished on the condition that the quality can be monitored.

Description

Concrete pile tube floor place pre-buried steel eyelet thimble welding node structure in the reverse construction
Technical field
The utility model relates to reverse construction, relates in particular to concrete pile tube floor place construction in the reverse construction.
Background technology
In reverse construction, earlier the engineering load-bearing pillar of structure is squeezed into soil layer with the form of stake earlier often, constructing structure top board again, recover original road surface, be that boundary is just being done the combination of top, road surface and contraryly made the following structure of road surface top board and construct simultaneously with the structure roof, in the following structure construction, interim friction carrying effect is played in the engineering stake of squeezing in lower part box earth excavation process.But the concrete pile tube of squeezing into has just become difficult point with lower part box structure intermediate layer floor and back plate connections, the minimizing that should try one's best broken (cutter) removes the structure influence to the later stage load-bearing pillar, whole Zone Fulls that rely on stake that also should not be too much are implanted the way of floor and base plate reinforcing bar, possibly can't satisfy the design load of design carrying effect.
Therefore; relevant atlas provides a solution; it has been set up one steel loop connecting plate and has connected as node; but do not have very good construction method with the operability that is connected technology and scene of main muscle for similar steel loop sleeve pipe; must satisfy steel loop and become an integral body with main muscle; requirement is all welded concrete pile tube master muscle with steel loop; concrete pile tube inwall headroom (stake footpath-protective layer-steel plate thickness-main muscle diameter) is little; can't pierce operating personnel's welding; and this process designs main muscle according to more; diameter is bigger; main muscle clear distance is little; the operation length that operating personnel can weld is extremely limited, only may finish 10cm left and right sides length weld job, and is equivalent to operation under the situation of " blind weldering "; can't guarantee welding quality and the welding code requirement that staggers, and hand can't be stretched into the steel loop inwall and effectively weld operation.
Summary of the invention
The utility model is intended to address the above problem, and concrete pile tube floor place pre-buried steel eyelet thimble welding node structure in a kind of reverse construction is provided.The pre-buried steel loop that the utility model has satisfied designing requirement must become outside the whole main body of carrying with the pile tube muscle of being advocated, and processing is got the raw materials ready conveniently, and weld job is can finish under the supervision situation in quality.
For addressing the above problem, concrete pile tube floor place pre-buried steel eyelet thimble welding node structure in a kind of reverse construction, it comprises that is welded on a steel loop sleeve pipe on concrete pile tube master muscle, it also comprises steel loop sleeve pipe upper and lower around the spiral hoop that is welding, and the two ends of concrete pile tube master muscle have been welded to connect Z word muscle separately.
Concrete pile tube floor place pre-buried steel eyelet thimble welding node structure in the described reverse construction, described spiral hoop and steel loop integral solder, and the spot welding that links to each other with main muscle.
Concrete pile tube floor place pre-buried steel eyelet thimble welding node structure in the described reverse construction, two-sided welding is adopted at described Z word muscle and steel loop position; Adopt single-sided welding with concrete pile tube master muscle position.
The utility model manufacture craft is simple; Weld job is convenient, and is quick; The welding fabrication quality can be supervised, effect is good; The steel loop sleeve pipe is connected with concrete pile tube master muscle and satisfies the integrated carrying effect; The utility model promptly satisfied designing requirement pre-buried steel loop must with pile tube advocated muscle become one the carrying whole main body outside, processing is got the raw materials ready conveniently, weld job is can finish under the supervision situation in quality, need not other hand inferior goes to weld with steel loop in main muscle inside, quality can not get ensureing fully, speed reduces greatly, the operability extreme difference.Be fit to the reference construction under the similar technology way situation.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and embodiments:
Fig. 1 is the utility model schematic diagram.
The specific embodiment
As shown in Figure 1, plant concrete pile tube floor place pre-buried steel eyelet thimble welding node structure in the reverse construction, it comprises that is welded on a steel loop sleeve pipe 1 on concrete pile tube master muscle 2, it also comprises steel loop sleeve pipe 1 upper and lower around the spiral hoop 3 that is welding, and the two ends of concrete pile tube master muscle 2 have been welded to connect Z word muscle 4 separately.
During enforcement, carry out according to the following step
1, the processing of steel loop material: because of the requirement of welding conditions, the suitable corresponding lengthening of the length of steel loop sleeve pipe, to avoid later stage floor 5(base plate) the connecting plate invar muscle length of structure and later stage and 1 welding of steel loop sleeve pipe collides with it, destroys the sleeve pipe of steel loop up and down 1 of connecting plate in the atlas.
2, about in the of 1 the position for the steel loop sleeve pipe, should be with the spiral hoop and steel loop sleeve pipe 1 integral solder one time of design, and the spot welding that links to each other with main muscle.But should not hinder " Z " word muscle crooked position.
3, according to additional " Z " word muscle of the radical of concrete pile tube master muscle processing, length should be according to the reinforcing bar grating, and stagger welding requirements and extension value of welding multiple, code requirement rationally determined.
4, two-sided welding should be adopted in " Z " word muscle and steel loop sleeve pipe 1 position, reduces weld length on the basis that guarantees welding quality as far as possible, and less welding to former material destroys.And the length code requirement reasonable distance that should stagger between every.
5, single-sided welding should be adopted in " Z " word muscle and concrete pile tube master muscle position, selects rational material welding rod for use, once welds moulding, reduces the destruction that main muscle raw material Yin Gaowen is caused as far as possible.And the length code requirement reasonable distance that should stagger between every.
6, the additional welding muscle of steel loop sleeve pipe 1 sleeve pipe two correspondence also should length stagger.
7, remove the iron oxide of welding position, conscientious double check welding quality.

Claims (3)

1. concrete pile tube floor place pre-buried steel eyelet thimble welding node structure in the reverse construction, it comprises that is welded on a steel loop sleeve pipe on concrete pile tube master muscle, it is characterized in that, it also comprises steel loop sleeve pipe upper and lower around the spiral hoop that is welding, and the two ends of concrete pile tube master muscle have been welded to connect Z word muscle separately.
2. concrete pile tube floor place pre-buried steel eyelet thimble welding node structure is characterized in that in the reverse construction according to claim 1, described spiral hoop and steel loop integral solder, and the spot welding that links to each other with main muscle.
3. concrete pile tube floor place pre-buried steel eyelet thimble welding node structure is characterized in that two-sided welding is adopted at described Z word muscle and steel loop position in the reverse construction according to claim 1; Adopt single-sided welding with concrete pile tube master muscle position.
CN2011200883001U 2011-03-30 2011-03-30 Welding joint structure of precast steel ring sleeve at position of concrete pipe pile floorslab in top down construction Expired - Lifetime CN202062165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200883001U CN202062165U (en) 2011-03-30 2011-03-30 Welding joint structure of precast steel ring sleeve at position of concrete pipe pile floorslab in top down construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200883001U CN202062165U (en) 2011-03-30 2011-03-30 Welding joint structure of precast steel ring sleeve at position of concrete pipe pile floorslab in top down construction

Publications (1)

Publication Number Publication Date
CN202062165U true CN202062165U (en) 2011-12-07

Family

ID=45056043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200883001U Expired - Lifetime CN202062165U (en) 2011-03-30 2011-03-30 Welding joint structure of precast steel ring sleeve at position of concrete pipe pile floorslab in top down construction

Country Status (1)

Country Link
CN (1) CN202062165U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908976A (en) * 2016-05-05 2016-08-31 上海建工二建集团有限公司 Vertical structure column reinforced steel bar preferentially constructed method for reverse building method
CN107989187A (en) * 2018-01-05 2018-05-04 上海欧本钢结构有限公司 A kind of prefabricated reinforced concrete column mechanically connects node and its construction method
CN109024244A (en) * 2018-08-31 2018-12-18 中交路桥华南工程有限公司 The welding structure and welding method of metal plate and main reinforcement

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908976A (en) * 2016-05-05 2016-08-31 上海建工二建集团有限公司 Vertical structure column reinforced steel bar preferentially constructed method for reverse building method
CN107989187A (en) * 2018-01-05 2018-05-04 上海欧本钢结构有限公司 A kind of prefabricated reinforced concrete column mechanically connects node and its construction method
CN107989187B (en) * 2018-01-05 2024-01-09 上海欧本钢结构有限公司 Mechanical connecting node of prefabricated reinforced concrete column and construction method of mechanical connecting node
CN109024244A (en) * 2018-08-31 2018-12-18 中交路桥华南工程有限公司 The welding structure and welding method of metal plate and main reinforcement
CN114457671A (en) * 2018-08-31 2022-05-10 中交路桥华南工程有限公司 Welding part

Similar Documents

Publication Publication Date Title
CN102535648B (en) Steel pipe column ring beam column node structure and construction method thereof
CN105888080A (en) Assembly type steel pipe casing reinforced concrete combined joint and mounting method
CN202062165U (en) Welding joint structure of precast steel ring sleeve at position of concrete pipe pile floorslab in top down construction
CN209958499U (en) Connecting joint for steel pipe concrete column and multi-layer reinforced concrete beam
CN102071747A (en) Joint of square steel tube concrete column and reinforced concrete floor and production method thereof
CN201539106U (en) Beam-column joint reinforced structure adopting enlarging section method
CN106759858A (en) The connecting node and preparation method of a kind of H profile steel beam and rectangular steel-tube concrete column
CN202466845U (en) Middle-layer node connecting structure for steel tube concrete column and steel reinforced concrete beam
CN106869326B (en) The frame system and construction method that hollow steel tube concrete integral node is constituted
CN202466844U (en) Top layer node connecting structure for concrete-filled steel tube column and steel reinforced concrete beam
CN208236000U (en) New increasing steel beam and concrete column hinged joint
CN202672353U (en) Panel constraint type concrete filled steel tube composite column-steel beam joint
CN210597882U (en) Lattice type steel reinforced concrete combined column beam column node
CN206706999U (en) Steel core concrete column is connected with girder steel with connections with stiffening ring structure in the segmentation that punches
CN206956754U (en) A kind of easy device for foundation ditch local dewatering
CN102031832A (en) Reinforcement steel-tube concrete column node
CN101525918A (en) Method for making winged steel tube-concrete composite beam
CN205259359U (en) Ring beam steel bar connection structure
CN209669855U (en) It is a kind of to lengthen steel reinforcement cage for the construction of low headroom pile foundation
CN105040828B (en) A kind of round steel pipe binding type steel concrete column and steel beam joint structure
CN206591644U (en) A kind of steel corbel connecting node of round steel tubing string and beams of concrete
CN102644327A (en) Panel binding type connection node of concrete filled steel tube laminated column and steel beam and construction method
CN207892029U (en) A kind of concrete-filled steel square tubular column with not contour girder steel haunch type
CN206667467U (en) A kind of frame structure system joint strengthening structure
CN207331682U (en) A kind of concrete ground foundation pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20111207