CN202059096U - Tool component capable of replacing insulator string electrically - Google Patents
Tool component capable of replacing insulator string electrically Download PDFInfo
- Publication number
- CN202059096U CN202059096U CN2011200574915U CN201120057491U CN202059096U CN 202059096 U CN202059096 U CN 202059096U CN 2011200574915 U CN2011200574915 U CN 2011200574915U CN 201120057491 U CN201120057491 U CN 201120057491U CN 202059096 U CN202059096 U CN 202059096U
- Authority
- CN
- China
- Prior art keywords
- tool assembly
- lead screw
- fixture
- insulator strings
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000012212 insulator Substances 0.000 title claims abstract description 35
- 238000009434 installation Methods 0.000 claims description 18
- 229910000746 Structural steel Inorganic materials 0.000 claims description 8
- 238000009413 insulation Methods 0.000 abstract description 10
- 230000005611 electricity Effects 0.000 description 8
- 230000005540 biological transmission Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000010292 electrical insulation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 235000000396 iron Nutrition 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种带电更换绝缘子串的工具组件。The utility model relates to a tool assembly for replacing insulator strings with electricity.
背景技术 Background technique
架空输电线路通过杆塔、连接金具和绝缘子串使金属导线与大地保持绝缘和距离,从而使源源不断的电力按我们规定的路径从电厂送到用户。输电线路的绝缘子、金具及导线在运行中不可避免地会出现各种损伤,这些损伤必须在适当的时间内被修复。修复可以在停电或不停电的条件下完成。在不停电的条件下完成输电线路的检修,我们称之为带电作业。Overhead transmission lines keep metal wires insulated and distanced from the ground through towers, connecting fittings and insulator strings, so that a steady stream of electricity is sent from the power plant to the user according to the path we stipulate. Insulators, fittings and wires of transmission lines will inevitably suffer from various damages during operation, and these damages must be repaired within an appropriate time. Repairs can be done with or without power outages. To complete the maintenance of transmission lines without power outage, we call it live work.
带电更换绝缘子串,需要将原来由绝缘子串承担的导线重量载荷及电气绝缘功能转移到一套绝缘工具上来,根据线路电压等级和导线规格型号及结构,我们可以选用相应长度、承载能力的绝缘拉杆、起重丝杠和吊钩,而最关键的是根据不同的塔型横担结构配备或设计固定卡具。To replace the insulator string with electricity, it is necessary to transfer the weight load and electrical insulation function of the wire originally borne by the insulator string to a set of insulation tools. According to the line voltage level, wire specification, model and structure, we can choose the insulation pull rod with the corresponding length and load capacity. , lifting screw and hook, and the most critical thing is to equip or design fixing fixtures according to different tower cross-arm structures.
目前还没有针对Sn1、Sn2塔型设计的带有专用杆塔横担卡具的带电更换绝缘子串的工具组件,常用的方法是采用绝缘滑车组,通过绳套,将滑车组捆绑固定到横担上,这样的结构稳定性和承重能力差,最大20kN,绝缘水平易受湿度、表面脏污等外部环境影响。At present, there is no tool assembly designed for Sn1 and Sn2 towers with special cross-arm clamps for live replacement of insulator strings. The common method is to use insulated tackle groups and bind the tackle groups to the cross-arms through rope sleeves. , Such a structure has poor stability and load-bearing capacity, the maximum is 20kN, and the insulation level is easily affected by external environments such as humidity and surface dirt.
实用新型内容 Utility model content
本实用新型旨在提供一种带电更换绝缘子串的工具组件,以解决现有技术中的带电更换绝缘子串的工具组件稳定性和承重能力差的技术问题。The utility model aims to provide a tool assembly for replacing insulator strings with electricity, so as to solve the technical problem of poor stability and load-bearing capacity of the tool assembly for replacing insulator strings with electricity in the prior art.
为实现上述目的,根据本实用新型提供了一种带电更换绝缘子串的工具组件,包括:杆塔横担卡具,包括:两个卡具本体,分别具有沿水平延伸的横担卡接槽和沿纵向延伸的丝杠安装槽;水平连杆,连接并拉紧两个卡具本体;丝杠起重装置,包括:丝杠,设置在丝杠安装槽内;丝母,安装在丝杠的上端并支撑在卡具本体上;以及吊钩,连接至丝杠的下端。In order to achieve the above purpose, the utility model provides a tool assembly for live replacement of insulator strings, including: pole and tower cross-arm clamps, including: two clamp bodies, respectively having cross-arm clamping slots extending horizontally and along the The longitudinally extending lead screw installation groove; the horizontal connecting rod, which connects and tightens the two jig bodies; the lead screw lifting device, including: the lead screw, which is set in the lead screw installation groove; the screw nut, which is installed on the upper end of the lead screw and supported on the jig body; and a hook connected to the lower end of the lead screw.
进一步地,丝母上安装有调节手柄。Further, an adjustment handle is installed on the screw nut.
进一步地,调节手柄沿丝母的径向水平延伸。Further, the adjusting handle extends horizontally along the radial direction of the nut.
进一步地,丝杠起重装置还包括绝缘拉杆,吊钩通过绝缘拉杆连接至丝杠的下端。Further, the screw lifting device further includes an insulating pull rod, and the hook is connected to the lower end of the lead screw through the insulating pull rod.
进一步地,水平连杆包括分别与两个卡具本体的相连接的两个端部连接段和两端分别与两个端部连接段相螺接的中间调节连杆。Further, the horizontal connecting rod includes two end connecting sections respectively connected to the two clamp bodies and an intermediate adjusting connecting rod whose two ends are respectively screwed to the two end connecting sections.
进一步地,水平连杆分别与两个卡具本体铰接。Further, the horizontal connecting rod is respectively hinged with the two fixture bodies.
进一步地,丝母与卡具本体的接触端为球冠体,卡具本体的上端面设置有与球冠体相配合的球面凹槽。Further, the contact end between the nut and the fixture body is a spherical crown, and the upper end surface of the fixture body is provided with a spherical groove matching the spherical crown.
进一步地,卡具本体的侧面还设置有带有长圆形通槽的压块,压块与卡具本体通过长圆形通槽相连接以止挡位于横担卡接槽中的杆塔横担的角铁的端部。Further, the side of the clamp body is also provided with a pressing block with an oblong through groove, and the pressing block is connected with the clamp body through the oblong through groove to stop the pole tower cross arm located in the cross arm clamping groove. the end of the angle iron.
进一步地,卡具本体上的丝杠安装槽的侧面开设有安装开口,安装开口处设置有水平延伸的锁紧螺栓。Further, an installation opening is provided on the side of the lead screw installation groove on the fixture body, and a locking bolt extending horizontally is provided at the installation opening.
根据本实用新型的技术方案,由于采用了带有专用杆塔横担卡具的带电更换绝缘子串的工具组件,从而克服了现有技术中的带电更换绝缘子串的工具组件稳定性和承重能力差,绝缘水平低的技术问题,其稳定性高,承重能力好,安装方便并具有较高的绝缘水平。According to the technical solution of the utility model, due to the adoption of the tool assembly for live replacement of insulator strings with special pole and tower cross-arm clamps, the poor stability and load-bearing capacity of the tool assembly for live replacement of insulator strings in the prior art is overcome. The technical problem of low insulation level, its high stability, good load-bearing capacity, easy installation and high insulation level.
附图说明 Description of drawings
构成本申请的一部分的附图用来提供对本实用新型的进一步理解,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。在附图中:The accompanying drawings constituting a part of this application are used to provide a further understanding of the utility model, and the schematic embodiments of the utility model and their descriptions are used to explain the utility model, and do not constitute an improper limitation of the utility model. In the attached picture:
图1是根据本实用新型的带电更换绝缘子串的工具组件的结构示意图;Fig. 1 is a schematic structural view of a tool assembly for live replacement of an insulator string according to the present utility model;
图2是根据本实用新型的带电更换绝缘子串的工具组件的杆塔横担卡具的主视结构示意图;以及Fig. 2 is a schematic diagram of the front structure of the pole tower cross-arm jig of the tool assembly for live replacement of the insulator string according to the utility model; and
图3是根据本实用新型的带电更换绝缘子串的工具组件的杆塔横担卡具的仰视结构示意图。Fig. 3 is a schematic bottom view structure diagram of the pole and tower cross-arm jig of the tool assembly for live replacement of insulator strings according to the utility model.
具体实施方式 Detailed ways
以下结合附图对本实用新型的实施例进行详细说明,但是本实用新型可以由权利要求限定和覆盖的多种不同方式实施。The embodiments of the utility model will be described in detail below in conjunction with the accompanying drawings, but the utility model can be implemented in various ways defined and covered by the claims.
如图1所示的是本实用新型的一种带电更换绝缘子串的工具组件,该带电更换绝缘子串的工具组件包括:杆塔横担卡具1和丝杠起重装置2,其中,杆塔横担卡具1包括:两个卡具本体11和水平连杆12。As shown in Figure 1 is a tool assembly for live replacement of insulator strings of the utility model, the tool assembly for live replacement of insulator strings includes: pole tower
如图2所示,两个卡具本体11分别具有沿水平延伸以卡接在杆塔横担上的横担卡接槽111和沿纵向延伸的丝杠安装槽,水平连杆12连接并拉紧两个卡具本体11。丝杠起重装置2包括:丝杠21、丝母22和吊钩23,丝杠21设置在丝杠安装槽内,丝母22安装在丝杠21的上端并支撑在卡具本体11上,以及吊钩23连接至丝杠21的下端。As shown in Fig. 2, the two
如图3所示,带电更换绝缘子串的工具组件的杆塔横担卡具1充分利用杆塔横担的局部结构,横担卡接槽111具有与杆塔横担的角铁相卡接的结构,杆塔横担的角铁正好卡住两个卡具本体11的横担卡接槽111,使吊钩23和丝杠21位于待更换绝缘子串的导线的正上方,吊钩23勾住导线,然后旋转丝母22,如图1所示,丝母22上安装有调节手柄24,调节手柄24可以更加方便省力的旋转丝母22,进一步优选地,调节手柄24沿丝母22的径向水平延伸,这样调节手柄24的扭矩可以保持比较大,旋转丝母22更加方便省力。当丝杠21随着丝母22的旋转被向上提升时,吊钩23勾住导线,将原来由绝缘子串承担的导线重量机械载荷及电气绝缘功能转移到带电更换绝缘子串的工具组件上来,从而可以安全方便的更换绝缘子串,克服了现有技术中的带电更换绝缘子串的工具组件承重能力差,绝缘水平低的技术问题,其稳定性高,承重能力好,并具有较高的绝缘水平。As shown in Figure 3, the
再来看图1,根据图1所示的丝杠起重装置2的一种优选的实施方式,丝杠起重装置2还包括绝缘拉杆25,吊钩23通过绝缘拉杆25连接至丝杠21的下端。绝缘拉杆25可以保证带电更换绝缘子串的工具组件工作时吊钩23和丝杠21之间绝缘,从而提高了带电更换绝缘子串的工具组件的绝缘水平,免受湿度、表面脏污等外部环境影响。Referring to Fig. 1 again, according to a preferred embodiment of the lead
作为一种优选的实施方式,从图1、图2和图3中可以看到,水平连杆12包括分别与两个卡具本体11的相连接的两个端部连接段121和两端分别与两个端部连接段121相螺接的中间调节连杆122,这样可以利用中间调节连杆122调节整个水平连杆12的长度,从而达到拉紧两个卡具本体11来平衡杆塔横担卡具1的翻转力矩的作用,使得杆塔横担的大边角钢仅受垂直分力。As a preferred embodiment, it can be seen from Fig. 1, Fig. 2 and Fig. 3 that the horizontal connecting
优选地,从图1和图2中可以看到,水平连杆12分别与两个卡具本体11铰接。由于与两个卡具本体11相对应的杆塔横担的局部角铁的位置可能不水平,水平连杆12与两个卡具本体11铰接的连接方式仍然可以实现拉紧两个卡具本体11来平衡杆塔横担卡具1的翻转力矩的作用。Preferably, as can be seen from FIG. 1 and FIG. 2 , the horizontal connecting
由图1和图3可以看出,丝母22与卡具本体11的接触端为球冠体,卡具本体11的上端面设置有与球冠体相配合的球面凹槽112。这样的结构使得旋转丝母22提升丝杠21灵活省力,同时避免丝杠21由于吊钩23钩住导线的角度发生变化而受到弯曲力矩容易折断。It can be seen from FIG. 1 and FIG. 3 that the contact end between the
如图3所示,卡具本体11的侧面还设置有带有长圆形通槽的压块113,压块113与卡具本体11通过长圆形通槽相连接以止挡位于横担卡接槽111中的杆塔横担的角铁的端部。当杆塔横担的角铁卡入横担卡接槽111时,压块113可以沿着长圆形通槽移动,进而抵紧角铁,防止角铁从横担卡接槽111中滑脱,加强了卡接的稳定和牢固性,同时使其能够适应杆塔的三层横担的角铁结构,应用范围广泛。As shown in Figure 3, the side of the
由图1、图2和图3还可以看出,卡具本体11上的丝杠安装槽的侧面开设有安装开口,安装开口处设置有水平延伸的锁紧螺栓114。丝杠21通过安装开口安装在丝杠安装槽中,再通过锁紧螺栓114进行锁紧固定,便于整套工具的安装,同时由于锁紧螺栓114的一端固定在卡具本体11上,使其不致由于操作失误而脱落危险到下方的工作人员。It can also be seen from FIG. 1 , FIG. 2 and FIG. 3 that an installation opening is provided on the side of the lead screw installation groove on the
以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200574915U CN202059096U (en) | 2011-03-07 | 2011-03-07 | Tool component capable of replacing insulator string electrically |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200574915U CN202059096U (en) | 2011-03-07 | 2011-03-07 | Tool component capable of replacing insulator string electrically |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202059096U true CN202059096U (en) | 2011-11-30 |
Family
ID=45019060
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200574915U Expired - Lifetime CN202059096U (en) | 2011-03-07 | 2011-03-07 | Tool component capable of replacing insulator string electrically |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202059096U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102623930A (en) * | 2012-04-17 | 2012-08-01 | 邯郸供电公司 | Replacing the hanging string combination tool |
CN104009416A (en) * | 2014-06-05 | 2014-08-27 | 国家电网公司 | Large-span telescopic universal tower head fixture |
CN105406396A (en) * | 2015-12-08 | 2016-03-16 | 国网浙江省电力公司丽水供电公司 | Corner porcelain insulator exchange device |
CN105773631A (en) * | 2016-03-03 | 2016-07-20 | 国网山东省电力公司茌平县供电公司 | Insulator maintenance robot for power transmission and distribution system |
CN106014184A (en) * | 2016-05-18 | 2016-10-12 | 国家电网公司 | Offline ladder stabilizing device for 500 kV transmission line |
CN104332884B (en) * | 2014-09-18 | 2017-06-30 | 云南电网公司红河供电局 | A kind of conduction wire riser for changing straight line insulator string |
CN111181077A (en) * | 2020-03-13 | 2020-05-19 | 广东电网有限责任公司电力科学研究院 | Channel steel cross arm insulator screw afterburner replacement device |
CN111181076A (en) * | 2020-03-13 | 2020-05-19 | 广东电网有限责任公司电力科学研究院 | Stress application replacing device for channel steel cross arm insulator pulley |
CN111224347A (en) * | 2020-03-13 | 2020-06-02 | 广东电网有限责任公司电力科学研究院 | Channel steel cross arm fixture for pole and tower insulator replacement |
CN114197940A (en) * | 2021-11-16 | 2022-03-18 | 广西电网有限责任公司桂林供电局 | Linear cross arm clamp and linear cross arm clamp assembly |
CN115000902A (en) * | 2022-06-09 | 2022-09-02 | 国网北京市电力公司 | Connection structure |
-
2011
- 2011-03-07 CN CN2011200574915U patent/CN202059096U/en not_active Expired - Lifetime
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102623930A (en) * | 2012-04-17 | 2012-08-01 | 邯郸供电公司 | Replacing the hanging string combination tool |
CN102623930B (en) * | 2012-04-17 | 2017-08-25 | 国家电网公司 | String combination tool is hung in replacing |
CN104009416A (en) * | 2014-06-05 | 2014-08-27 | 国家电网公司 | Large-span telescopic universal tower head fixture |
CN104332884B (en) * | 2014-09-18 | 2017-06-30 | 云南电网公司红河供电局 | A kind of conduction wire riser for changing straight line insulator string |
CN105406396A (en) * | 2015-12-08 | 2016-03-16 | 国网浙江省电力公司丽水供电公司 | Corner porcelain insulator exchange device |
CN105773631A (en) * | 2016-03-03 | 2016-07-20 | 国网山东省电力公司茌平县供电公司 | Insulator maintenance robot for power transmission and distribution system |
CN106014184A (en) * | 2016-05-18 | 2016-10-12 | 国家电网公司 | Offline ladder stabilizing device for 500 kV transmission line |
CN106014184B (en) * | 2016-05-18 | 2017-10-31 | 国家电网公司 | A 500kV transmission line off-line ladder stabilization device |
CN111181077A (en) * | 2020-03-13 | 2020-05-19 | 广东电网有限责任公司电力科学研究院 | Channel steel cross arm insulator screw afterburner replacement device |
CN111181076A (en) * | 2020-03-13 | 2020-05-19 | 广东电网有限责任公司电力科学研究院 | Stress application replacing device for channel steel cross arm insulator pulley |
CN111224347A (en) * | 2020-03-13 | 2020-06-02 | 广东电网有限责任公司电力科学研究院 | Channel steel cross arm fixture for pole and tower insulator replacement |
CN114197940A (en) * | 2021-11-16 | 2022-03-18 | 广西电网有限责任公司桂林供电局 | Linear cross arm clamp and linear cross arm clamp assembly |
CN114197940B (en) * | 2021-11-16 | 2023-08-08 | 广西电网有限责任公司桂林供电局 | Linear cross arm clamp and linear cross arm clamp assembly |
CN115000902A (en) * | 2022-06-09 | 2022-09-02 | 国网北京市电力公司 | Connection structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202059096U (en) | Tool component capable of replacing insulator string electrically | |
WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
CN103594968B (en) | A kind of transmission tower multiple fission conductor lifting device | |
CN106451214B (en) | A kind of combination tool of charged for replacement extra-high voltage same tower double circuit strain insulator | |
CN105514877B (en) | Common-tower double-return steel pipe pole replacement insulation subjob cross-arm fixture | |
CN106229889A (en) | A kind of transmission line of electricity lifting device for aerial wires | |
CN102664377B (en) | Double-cross arm assembler for single lever and double-cross arm mounting method | |
CN110552936A (en) | Wire pole staple bolt device of balanced acting as go-between | |
CN101814707A (en) | Tool for live replacement of 220kV line 'V' string insulator and method | |
CN205141528U (en) | Three angle steel mounts | |
CN206099164U (en) | A combined tool for live replacement of UHV double-circuit tension insulators on the same tower | |
CN201438617U (en) | Electric lifting tool for linear insulator string on ZM tower | |
CN103606849B (en) | Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof | |
CN108448488A (en) | 840kN grade tension quadruple cross-arm side insulator replacement tool and method | |
CN108711778A (en) | Six strain insulator of 550kN grades replaces tool and method | |
CN114204482B (en) | Universal live working dummy device for power transmission line | |
CN202363811U (en) | Cross arm clamping device for replacing insulator of direct-current 500kv straight-line string | |
CN211405262U (en) | A live replacement insulator device | |
CN205178388U (en) | Two cluster insulators of straight line are changed and are connected | |
CN205304094U (en) | A fixture that is used for electrified two independent many yoke plates of some combination insulator chain that hang that change | |
CN204651789U (en) | The special hanger of hot-line insulator string replacement | |
CN107370078B (en) | L-shaped suspension string side fixture for live working conductors of ultra-high voltage overhead transmission lines | |
CN204858403U (en) | A temporary hanging point fixing device for live replacement of V-shaped insulators on transmission lines | |
CN209434747U (en) | Combination Tool for Replacing Tension Strings of DC Grounding Electrode Line by Horizontal Rotation Method | |
CN205081393U (en) | Electrified insulator chain lifting mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Free format text: FORMER OWNER: BEIJING ELECTRIC POWER CORP. Effective date: 20130531 Owner name: BEIJING ELECTRIC POWER CORP. Effective date: 20130531 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 100031 XICHENG, BEIJING TO: 100031 DONGCHENG, BEIJING |
|
TR01 | Transfer of patent right |
Effective date of registration: 20130531 Address after: 100031 West Chang'an Avenue, Beijing, No. 86 Patentee after: State Grid Corporation of China Patentee after: Beijing Electric Power Corp. Address before: 100031 Beijing Qianmen West Street, Xicheng District, No. 41 Patentee before: Beijing Electric Power Corp. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20111130 |