CN102623930B - String combination tool is hung in replacing - Google Patents
String combination tool is hung in replacing Download PDFInfo
- Publication number
- CN102623930B CN102623930B CN201210111186.9A CN201210111186A CN102623930B CN 102623930 B CN102623930 B CN 102623930B CN 201210111186 A CN201210111186 A CN 201210111186A CN 102623930 B CN102623930 B CN 102623930B
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- connecting plate
- round steel
- welded
- ladder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electric Cable Installation (AREA)
- Ladders (AREA)
Abstract
本发明公开一种更换吊串组合工具,包括竖杆为空管的铝合金梯子,在铝合金梯子的竖杆内穿装有圆钢,在圆钢的顶端焊接有连接板,连接板和铝合金梯子的竖杆上有适配的螺栓连接孔,连接板和铝合金梯子的竖杆梯子上部和连接板用螺栓连接,在其中一个连接板的上部焊接有铰座,在铰座上铰接有吊板,在吊板端部设有插孔,在另一个连接板的上部焊接有带销孔和挡环的与插孔适配的插销,在销孔内装有销,在其中一根圆钢的下端部焊接有吊环,在吊环上连接有第一吊钩,在另一根圆钢的下端部焊接有调节环,在调节环上连接有调节丝杠,在调节丝杠上连接有第二吊钩。是一种使用方便、安全且节约劳动力的更换吊串组合工具。
The invention discloses a combination tool for replacing hanging strings, which comprises an aluminum alloy ladder whose vertical bar is an empty pipe, and a round steel is installed in the vertical bar of the aluminum alloy ladder, and a connecting plate is welded on the top of the round steel, and the connecting plate and the aluminum alloy There are suitable bolt connection holes on the vertical bar of the alloy ladder, and the upper part of the ladder and the connecting plate are connected by bolts between the connecting plate and the vertical bar of the aluminum alloy ladder. A hinge seat is welded on the upper part of one of the connecting plates, and a hinge seat is hinged on the hinge seat. Hanging plate, there is a socket at the end of the hanging plate, and a pin with a pin hole and a retaining ring that is adapted to the socket is welded on the upper part of the other connecting plate, and a pin is installed in the pin hole, and one of the round steel The lower end of the round steel is welded with a suspension ring, the first hook is connected to the suspension ring, an adjustment ring is welded to the lower end of the other round steel, an adjustment screw is connected to the adjustment ring, and a second hook is connected to the adjustment screw. hook. It is a convenient, safe and labor-saving combination tool for replacing hanging strings.
Description
技术领域technical field
本发明涉及一种电工工具,尤其是一种更换吊串组合工具。The invention relates to an electrical tool, in particular to a combined tool for replacing hanging strings.
背景技术Background technique
众所周知,当绝缘子寿命到达运行年限或者遭受雷击及其他破坏时我们需要对绝缘子进行更换,绝缘子按照其用途分为:耐张绝缘子、直线绝缘子和吊串,由于吊串完全悬挂在空中,没有着力点,更换吊串工作因此变得尤为复杂和困难。目前,更换吊串时,工人首先需要使用梯子从横担下到扁担上,然后用若干个铅丝套和双钩连接 ,提升扁担使吊串脱离,进行更换。其缺点是:除攀爬梯外,横担与扁担之间一般要连接一个双钩, 3-5个铅丝套,连接工具较多、程序复杂,加之杆塔上作业空间很小,作业十分不便;另外,由于提升装置只有一个受力点,将双钩收紧后,扁担线夹发生偏折,弹簧销很容易被卡住,取出十分困难。往往需要另一名作业人员在横担上配合才能完成工作;第三,由于扁担一直是单点受力,整个作业过程作业人员像是站在高空跷跷板上,给作业人员带来很大压力,作业不便且存在不安全因素。因此,设计一种使用方便、安全且节约劳动力的更换吊串组合工具,是目前需要解决的技术问题。As we all know, insulators need to be replaced when their service life reaches the operating limit or they suffer from lightning strikes and other damages. Insulators are divided into: tension insulators, linear insulators and hanging strings according to their uses. Since the hanging strings are completely suspended in the air, there is no focus Therefore, the work of changing the hanging string becomes particularly complicated and difficult. At present, when replacing the hanging strings, workers first need to use a ladder to get down from the cross arm to the shoulder pole, and then use several lead wire sleeves and double hooks to connect, lift the shoulder pole to separate the hanging strings, and replace them. Its disadvantages are: in addition to the climbing ladder, a double hook and 3-5 lead wire sleeves are usually connected between the cross arm and the shoulder pole. There are many connecting tools and complicated procedures. In addition, the working space on the pole tower is very small, and the operation is very inconvenient; , Since the lifting device has only one stress point, after the double hooks are tightened, the shoulder pole clamp will be deflected, the spring pin will be easily stuck, and it is very difficult to take it out. It often requires another operator to cooperate on the cross arm to complete the work; third, because the shoulder pole is always under a single point of force, the operator is like standing on a seesaw in the whole operation process, which brings great pressure to the operator. The operation is inconvenient and there are unsafe factors. Therefore, it is a technical problem to be solved at present to design an easy-to-use, safe and labor-saving replacement hanging string combination tool.
发明内容Contents of the invention
本发明所要解决的技术问题是提供一种使用方便、安全且节约劳动力的更换吊串组合工具。The technical problem to be solved by the present invention is to provide a combination tool for replacing hanging strings that is easy to use, safe and labor-saving.
本发明解决其技术问题的技术方案是:The technical scheme that the present invention solves its technical problem is:
更换吊串组合工具,包括竖杆为空管的铝合金梯子,在铝合金梯子的竖杆内穿装有圆钢,在圆钢的顶端焊接有连接板,连接板和铝合金梯子的竖杆上有适配的螺栓连接孔,连接板和铝合金梯子的竖杆梯子上部和连接板用螺栓连接,在其中一个连接板的上部焊接有铰座,在铰座上铰接有吊板,在吊板端部设有插孔,在另一个连接板的上部焊接有带销孔和挡环的与插孔适配的插销,在销孔内装有销,在其中一根圆钢的下端部焊接有吊环,在吊环上连接有第一吊钩,在另一根圆钢的下端部焊接有调节环,在调节环上连接有调节丝杠,在调节丝杠上连接有第二吊钩。Replace the hanging string combination tool, including the aluminum alloy ladder whose vertical rod is an empty tube, the vertical rod of the aluminum alloy ladder is equipped with round steel, the top of the round steel is welded with a connecting plate, the connecting plate and the vertical rod of the aluminum alloy ladder There are suitable bolt connection holes, and the upper part of the connecting plate and the vertical bar ladder of the aluminum alloy ladder is connected with the connecting plate by bolts. A hinge seat is welded on the upper part of one of the connecting plates, and a hanging plate is hinged on the hinge seat. There is a socket at the end of the plate, and a pin with a pin hole and a retaining ring that is suitable for the socket is welded on the upper part of the other connecting plate. The suspension ring is connected with a first suspension hook on the suspension ring, an adjustment ring is welded on the lower end of another round steel, an adjustment screw is connected on the adjustment ring, and a second suspension hook is connected on the adjustment screw.
优选地,在铝合金梯子的下端口部用环氧树脂将圆钢与铝合金梯子的竖杆固定。Preferably, epoxy resin is used to fix the round steel and the vertical bar of the aluminum alloy ladder at the lower end of the aluminum alloy ladder.
与现有技术相比,本发明的优点:第一,由于悬挂方式的优化,挂点与横担连接稳定、牢固,上下梯子过程平稳、安全,不发生侧歪;第二,作业中使用挂钩直接吊挂扁担,不再需要铅丝套、丝杠,轻松简便,易于操作;第三,由于使用了双挂钩方式,整个更换过程中,扁担十分平稳,不再是跷跷板,大大提高了作业的安全性,保证了作业人员的安全;第四,提升过程中是垂直向上提升扁担,不会发生扁担线夹歪斜、销子卡住的情况,脱离、安装吊串过程轻松、容易。Compared with the prior art, the present invention has the following advantages: first, due to the optimization of the suspension mode, the connection between the hanging point and the cross arm is stable and firm, the process of going up and down the ladder is stable and safe, and no sideways deviation occurs; second, the hook is used in the operation Directly hang the shoulder pole, no need for lead wire sleeves and lead screws, easy and convenient, easy to operate; third, due to the use of double hooks, the pole is very stable during the entire replacement process, no longer a seesaw, greatly improving the safety of the operation Safety, which ensures the safety of the operators; Fourth, during the lifting process, the shoulder pole is lifted vertically upwards, so that the pole clamps will not be skewed and the pins will be stuck, and the process of detachment and installation of the hanging string is easy and easy.
附图说明Description of drawings
图1是本发明的结构示意图。Fig. 1 is a schematic structural view of the present invention.
具体实施方式detailed description
如图所示,更换吊串组合工具,包括竖杆为空管的铝合金梯子1,在铝合金梯子1的竖杆内穿装有圆钢2,在圆钢2的顶端焊接有连接板3,连接板3和铝合金梯子1的竖杆上有适配的螺栓连接孔,连接板3和铝合金梯子1的竖杆梯子上部和连接板用螺栓4连接,在其中一个连接板的上部焊接有铰座5,在铰座5上铰接有吊板7,在吊板7端部设有插孔8,在另一个连接板的上部焊接有带销孔和挡环11的与插孔8适配的插销10,在销孔内装有销9,在其中一根圆钢的下端部焊接有吊环13,在吊环13上连接有第一吊钩14,在另一根圆钢的下端部焊接有调节环16,在调节环17上连接有调节丝杠15,在调节丝杠16上连接有第二吊钩15。在铝合金梯子1的下端口部用环氧树脂将圆钢2与铝合金梯子1的竖杆固定。As shown in the figure, replace the hanging string combination tool, including the aluminum alloy ladder 1 whose vertical bar is an empty tube, the round steel 2 is installed in the vertical bar of the aluminum alloy ladder 1, and the connecting plate 3 is welded on the top of the round steel 2 , the connection plate 3 and the vertical bar of the aluminum alloy ladder 1 have suitable bolt connection holes, the upper part of the vertical bar of the connection plate 3 and the aluminum alloy ladder 1 is connected with the connection plate by bolt 4, and the upper part of one of the connection plates is welded There is a hinge seat 5, on which a hanging plate 7 is hinged, and a socket 8 is provided at the end of the hanging plate 7, and a pin hole and a retaining ring 11 are welded on the top of the other connecting plate, which is suitable for the socket 8. The matching bolt 10 is equipped with a pin 9 in the pin hole, a lifting ring 13 is welded on the lower end of one of the round steels, a first hook 14 is connected on the lifting ring 13, and a lifting ring 13 is welded on the lower end of the other round steel. The adjusting ring 16 is connected with an adjusting screw 15 on the adjusting ring 17 , and is connected with a second hook 15 on the adjusting screw 16 . The round steel 2 and the vertical bar of the aluminum alloy ladder 1 are fixed with epoxy resin at the lower port portion of the aluminum alloy ladder 1 .
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210111186.9A CN102623930B (en) | 2012-04-17 | 2012-04-17 | String combination tool is hung in replacing |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210111186.9A CN102623930B (en) | 2012-04-17 | 2012-04-17 | String combination tool is hung in replacing |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102623930A CN102623930A (en) | 2012-08-01 |
| CN102623930B true CN102623930B (en) | 2017-08-25 |
Family
ID=46563675
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210111186.9A Active CN102623930B (en) | 2012-04-17 | 2012-04-17 | String combination tool is hung in replacing |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102623930B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105134063B (en) * | 2015-09-24 | 2017-05-03 | 江苏省电力公司宝应县供电公司 | Slide ladder for on-line operation |
| WO2020015543A1 (en) * | 2018-07-16 | 2020-01-23 | 江苏宙际杰智能科技股份有限公司 | Ladder |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2094812U (en) * | 1990-12-21 | 1992-01-29 | 宁夏电力工业局银南供电局 | Equal potential insulator changing tool |
| DE19653847A1 (en) * | 1995-12-14 | 1997-06-19 | Etude Et Construction De Ligne | System allowing service personnel to access end of horizontal arm on mast carrying HV lines |
| CN201174540Y (en) * | 2008-03-06 | 2008-12-31 | 福建省厦门电业局 | Suspended insulator string live replacement device clamped with two-connection board |
| CN201282302Y (en) * | 2008-10-14 | 2009-07-29 | 河南省电力公司郑州供电公司 | Composite insulator force-bearing type scramble raiser |
| CN101567529A (en) * | 2009-05-23 | 2009-10-28 | 江苏省电力公司无锡供电公司 | Lifting ladder hook for insulated pulling materials |
| CN201345512Y (en) * | 2008-12-11 | 2009-11-11 | 江西吉安供电公司 | 220KV double-circuit overhead tower-sharing circuit high-voltage strong-electric-field special tool |
| CN201466572U (en) * | 2009-08-27 | 2010-05-12 | 河南省电力公司平顶山供电公司 | Ladder for installation and replacement of composite insulators for high-voltage overhead lines |
| CN202059096U (en) * | 2011-03-07 | 2011-11-30 | 北京市电力公司 | Tool component capable of replacing insulator string electrically |
| CN202633821U (en) * | 2012-04-17 | 2012-12-26 | 邯郸供电公司 | Combination tool for replacing suspension string |
-
2012
- 2012-04-17 CN CN201210111186.9A patent/CN102623930B/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2094812U (en) * | 1990-12-21 | 1992-01-29 | 宁夏电力工业局银南供电局 | Equal potential insulator changing tool |
| DE19653847A1 (en) * | 1995-12-14 | 1997-06-19 | Etude Et Construction De Ligne | System allowing service personnel to access end of horizontal arm on mast carrying HV lines |
| CN201174540Y (en) * | 2008-03-06 | 2008-12-31 | 福建省厦门电业局 | Suspended insulator string live replacement device clamped with two-connection board |
| CN201282302Y (en) * | 2008-10-14 | 2009-07-29 | 河南省电力公司郑州供电公司 | Composite insulator force-bearing type scramble raiser |
| CN201345512Y (en) * | 2008-12-11 | 2009-11-11 | 江西吉安供电公司 | 220KV double-circuit overhead tower-sharing circuit high-voltage strong-electric-field special tool |
| CN101567529A (en) * | 2009-05-23 | 2009-10-28 | 江苏省电力公司无锡供电公司 | Lifting ladder hook for insulated pulling materials |
| CN201466572U (en) * | 2009-08-27 | 2010-05-12 | 河南省电力公司平顶山供电公司 | Ladder for installation and replacement of composite insulators for high-voltage overhead lines |
| CN202059096U (en) * | 2011-03-07 | 2011-11-30 | 北京市电力公司 | Tool component capable of replacing insulator string electrically |
| CN202633821U (en) * | 2012-04-17 | 2012-12-26 | 邯郸供电公司 | Combination tool for replacing suspension string |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102623930A (en) | 2012-08-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202353093U (en) | Wire lifter for replacing insulator strings | |
| CN201914121U (en) | Installation tool of contact network cantilever | |
| CN102623930B (en) | String combination tool is hung in replacing | |
| CN203536860U (en) | A Hanger for Replacing Tension Insulators | |
| CN201517022U (en) | Lifting tools for pole-mounted equipment | |
| CN102738733B (en) | ± 660kV strain tower changes porcelain insulator suspension bracket | |
| CN102761077B (en) | Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line | |
| CN202633821U (en) | Combination tool for replacing suspension string | |
| CN202405695U (en) | Lifting tool for overhead ground wire of steel pipe pole | |
| CN102237654B (en) | Method for replacing jumper string using tool at double angle hanging point | |
| CN203690795U (en) | Carriage used for overhaul of insulator chain | |
| CN202864675U (en) | Shaft-type part hoisting tool | |
| CN102738734B (en) | Hanging bracket for replacing porcelain insulator on strain tower | |
| CN111697487B (en) | Pressure-measurable live replacement device for double insulator strings and operation method | |
| CN202856246U (en) | Insulator replacement device | |
| CN202978098U (en) | Overhead ground wire lifter | |
| CN203114144U (en) | Overhung maintenance hook ladder | |
| CN202872248U (en) | Hanging bracket for replacing porcelain insulator on strain tower | |
| CN202594699U (en) | Power transmission line lifting device for steel pipe tower | |
| CN202193542U (en) | A tool for fixing a circular pulley for a tower | |
| CN205489269U (en) | Overhead earth wire hoisting device for high tension transmission line | |
| CN204858403U (en) | Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity | |
| CN205355684U (en) | Straight line porcelain insulator dismouting hoist | |
| CN205187631U (en) | Adjustable lug hoisting accessory | |
| CN205829046U (en) | Double suspension centre power transmission line overhead ground wire hoisting tools |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA HEBEI ELECTRIC POW Effective date: 20121214 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20121214 Address after: 056002 No. 48 Zhonghua North Street, Hebei, Handan Applicant after: Handan Power Supply Company Applicant after: State Grid Corporation of China Applicant after: Hebei Electric Power Corporation Address before: 056002 No. 19 Zhonghua North Street, Hebei, Handan Applicant before: Handan Power Supply Company |
|
| C53 | Correction of patent for invention or patent application | ||
| CB02 | Change of applicant information |
Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: Handan Power Supply Company Applicant after: Hebei Electric Power Corporation Address before: 056002 No. 48 Zhonghua North Street, Hebei, Handan Applicant before: Handan Power Supply Company Applicant before: State Grid Corporation of China Applicant before: Hebei Electric Power Corporation |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: HANDAN POWER SUPPLY COMPANY TO: STATE ELECTRIC NET CROP. |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant |