CN102623930B - String combination tool is hung in replacing - Google Patents

String combination tool is hung in replacing Download PDF

Info

Publication number
CN102623930B
CN102623930B CN201210111186.9A CN201210111186A CN102623930B CN 102623930 B CN102623930 B CN 102623930B CN 201210111186 A CN201210111186 A CN 201210111186A CN 102623930 B CN102623930 B CN 102623930B
Authority
CN
China
Prior art keywords
aluminum alloy
connecting plate
round steel
welded
ladder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210111186.9A
Other languages
Chinese (zh)
Other versions
CN102623930A (en
Inventor
王申泉
高鹏飞
窦志平
杨军超
秦艳军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hebei Electric Power Co Ltd
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Hebei Electric Power Co Ltd
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Hebei Electric Power Co Ltd, Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Hebei Electric Power Co Ltd
Priority to CN201210111186.9A priority Critical patent/CN102623930B/en
Publication of CN102623930A publication Critical patent/CN102623930A/en
Application granted granted Critical
Publication of CN102623930B publication Critical patent/CN102623930B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Ladders (AREA)

Abstract

本发明公开一种更换吊串组合工具,包括竖杆为空管的铝合金梯子,在铝合金梯子的竖杆内穿装有圆钢,在圆钢的顶端焊接有连接板,连接板和铝合金梯子的竖杆上有适配的螺栓连接孔,连接板和铝合金梯子的竖杆梯子上部和连接板用螺栓连接,在其中一个连接板的上部焊接有铰座,在铰座上铰接有吊板,在吊板端部设有插孔,在另一个连接板的上部焊接有带销孔和挡环的与插孔适配的插销,在销孔内装有销,在其中一根圆钢的下端部焊接有吊环,在吊环上连接有第一吊钩,在另一根圆钢的下端部焊接有调节环,在调节环上连接有调节丝杠,在调节丝杠上连接有第二吊钩。是一种使用方便、安全且节约劳动力的更换吊串组合工具。

The invention discloses a combination tool for replacing hanging strings, which comprises an aluminum alloy ladder whose vertical bar is an empty pipe, and a round steel is installed in the vertical bar of the aluminum alloy ladder, and a connecting plate is welded on the top of the round steel, and the connecting plate and the aluminum alloy There are suitable bolt connection holes on the vertical bar of the alloy ladder, and the upper part of the ladder and the connecting plate are connected by bolts between the connecting plate and the vertical bar of the aluminum alloy ladder. A hinge seat is welded on the upper part of one of the connecting plates, and a hinge seat is hinged on the hinge seat. Hanging plate, there is a socket at the end of the hanging plate, and a pin with a pin hole and a retaining ring that is adapted to the socket is welded on the upper part of the other connecting plate, and a pin is installed in the pin hole, and one of the round steel The lower end of the round steel is welded with a suspension ring, the first hook is connected to the suspension ring, an adjustment ring is welded to the lower end of the other round steel, an adjustment screw is connected to the adjustment ring, and a second hook is connected to the adjustment screw. hook. It is a convenient, safe and labor-saving combination tool for replacing hanging strings.

Description

更换吊串组合工具Replacing the hanging string combination tool

技术领域technical field

本发明涉及一种电工工具,尤其是一种更换吊串组合工具。The invention relates to an electrical tool, in particular to a combined tool for replacing hanging strings.

背景技术Background technique

众所周知,当绝缘子寿命到达运行年限或者遭受雷击及其他破坏时我们需要对绝缘子进行更换,绝缘子按照其用途分为:耐张绝缘子、直线绝缘子和吊串,由于吊串完全悬挂在空中,没有着力点,更换吊串工作因此变得尤为复杂和困难。目前,更换吊串时,工人首先需要使用梯子从横担下到扁担上,然后用若干个铅丝套和双钩连接 ,提升扁担使吊串脱离,进行更换。其缺点是:除攀爬梯外,横担与扁担之间一般要连接一个双钩, 3-5个铅丝套,连接工具较多、程序复杂,加之杆塔上作业空间很小,作业十分不便;另外,由于提升装置只有一个受力点,将双钩收紧后,扁担线夹发生偏折,弹簧销很容易被卡住,取出十分困难。往往需要另一名作业人员在横担上配合才能完成工作;第三,由于扁担一直是单点受力,整个作业过程作业人员像是站在高空跷跷板上,给作业人员带来很大压力,作业不便且存在不安全因素。因此,设计一种使用方便、安全且节约劳动力的更换吊串组合工具,是目前需要解决的技术问题。As we all know, insulators need to be replaced when their service life reaches the operating limit or they suffer from lightning strikes and other damages. Insulators are divided into: tension insulators, linear insulators and hanging strings according to their uses. Since the hanging strings are completely suspended in the air, there is no focus Therefore, the work of changing the hanging string becomes particularly complicated and difficult. At present, when replacing the hanging strings, workers first need to use a ladder to get down from the cross arm to the shoulder pole, and then use several lead wire sleeves and double hooks to connect, lift the shoulder pole to separate the hanging strings, and replace them. Its disadvantages are: in addition to the climbing ladder, a double hook and 3-5 lead wire sleeves are usually connected between the cross arm and the shoulder pole. There are many connecting tools and complicated procedures. In addition, the working space on the pole tower is very small, and the operation is very inconvenient; , Since the lifting device has only one stress point, after the double hooks are tightened, the shoulder pole clamp will be deflected, the spring pin will be easily stuck, and it is very difficult to take it out. It often requires another operator to cooperate on the cross arm to complete the work; third, because the shoulder pole is always under a single point of force, the operator is like standing on a seesaw in the whole operation process, which brings great pressure to the operator. The operation is inconvenient and there are unsafe factors. Therefore, it is a technical problem to be solved at present to design an easy-to-use, safe and labor-saving replacement hanging string combination tool.

发明内容Contents of the invention

本发明所要解决的技术问题是提供一种使用方便、安全且节约劳动力的更换吊串组合工具。The technical problem to be solved by the present invention is to provide a combination tool for replacing hanging strings that is easy to use, safe and labor-saving.

本发明解决其技术问题的技术方案是:The technical scheme that the present invention solves its technical problem is:

更换吊串组合工具,包括竖杆为空管的铝合金梯子,在铝合金梯子的竖杆内穿装有圆钢,在圆钢的顶端焊接有连接板,连接板和铝合金梯子的竖杆上有适配的螺栓连接孔,连接板和铝合金梯子的竖杆梯子上部和连接板用螺栓连接,在其中一个连接板的上部焊接有铰座,在铰座上铰接有吊板,在吊板端部设有插孔,在另一个连接板的上部焊接有带销孔和挡环的与插孔适配的插销,在销孔内装有销,在其中一根圆钢的下端部焊接有吊环,在吊环上连接有第一吊钩,在另一根圆钢的下端部焊接有调节环,在调节环上连接有调节丝杠,在调节丝杠上连接有第二吊钩。Replace the hanging string combination tool, including the aluminum alloy ladder whose vertical rod is an empty tube, the vertical rod of the aluminum alloy ladder is equipped with round steel, the top of the round steel is welded with a connecting plate, the connecting plate and the vertical rod of the aluminum alloy ladder There are suitable bolt connection holes, and the upper part of the connecting plate and the vertical bar ladder of the aluminum alloy ladder is connected with the connecting plate by bolts. A hinge seat is welded on the upper part of one of the connecting plates, and a hanging plate is hinged on the hinge seat. There is a socket at the end of the plate, and a pin with a pin hole and a retaining ring that is suitable for the socket is welded on the upper part of the other connecting plate. The suspension ring is connected with a first suspension hook on the suspension ring, an adjustment ring is welded on the lower end of another round steel, an adjustment screw is connected on the adjustment ring, and a second suspension hook is connected on the adjustment screw.

优选地,在铝合金梯子的下端口部用环氧树脂将圆钢与铝合金梯子的竖杆固定。Preferably, epoxy resin is used to fix the round steel and the vertical bar of the aluminum alloy ladder at the lower end of the aluminum alloy ladder.

与现有技术相比,本发明的优点:第一,由于悬挂方式的优化,挂点与横担连接稳定、牢固,上下梯子过程平稳、安全,不发生侧歪;第二,作业中使用挂钩直接吊挂扁担,不再需要铅丝套、丝杠,轻松简便,易于操作;第三,由于使用了双挂钩方式,整个更换过程中,扁担十分平稳,不再是跷跷板,大大提高了作业的安全性,保证了作业人员的安全;第四,提升过程中是垂直向上提升扁担,不会发生扁担线夹歪斜、销子卡住的情况,脱离、安装吊串过程轻松、容易。Compared with the prior art, the present invention has the following advantages: first, due to the optimization of the suspension mode, the connection between the hanging point and the cross arm is stable and firm, the process of going up and down the ladder is stable and safe, and no sideways deviation occurs; second, the hook is used in the operation Directly hang the shoulder pole, no need for lead wire sleeves and lead screws, easy and convenient, easy to operate; third, due to the use of double hooks, the pole is very stable during the entire replacement process, no longer a seesaw, greatly improving the safety of the operation Safety, which ensures the safety of the operators; Fourth, during the lifting process, the shoulder pole is lifted vertically upwards, so that the pole clamps will not be skewed and the pins will be stuck, and the process of detachment and installation of the hanging string is easy and easy.

附图说明Description of drawings

图1是本发明的结构示意图。Fig. 1 is a schematic structural view of the present invention.

具体实施方式detailed description

如图所示,更换吊串组合工具,包括竖杆为空管的铝合金梯子1,在铝合金梯子1的竖杆内穿装有圆钢2,在圆钢2的顶端焊接有连接板3,连接板3和铝合金梯子1的竖杆上有适配的螺栓连接孔,连接板3和铝合金梯子1的竖杆梯子上部和连接板用螺栓4连接,在其中一个连接板的上部焊接有铰座5,在铰座5上铰接有吊板7,在吊板7端部设有插孔8,在另一个连接板的上部焊接有带销孔和挡环11的与插孔8适配的插销10,在销孔内装有销9,在其中一根圆钢的下端部焊接有吊环13,在吊环13上连接有第一吊钩14,在另一根圆钢的下端部焊接有调节环16,在调节环17上连接有调节丝杠15,在调节丝杠16上连接有第二吊钩15。在铝合金梯子1的下端口部用环氧树脂将圆钢2与铝合金梯子1的竖杆固定。As shown in the figure, replace the hanging string combination tool, including the aluminum alloy ladder 1 whose vertical bar is an empty tube, the round steel 2 is installed in the vertical bar of the aluminum alloy ladder 1, and the connecting plate 3 is welded on the top of the round steel 2 , the connection plate 3 and the vertical bar of the aluminum alloy ladder 1 have suitable bolt connection holes, the upper part of the vertical bar of the connection plate 3 and the aluminum alloy ladder 1 is connected with the connection plate by bolt 4, and the upper part of one of the connection plates is welded There is a hinge seat 5, on which a hanging plate 7 is hinged, and a socket 8 is provided at the end of the hanging plate 7, and a pin hole and a retaining ring 11 are welded on the top of the other connecting plate, which is suitable for the socket 8. The matching bolt 10 is equipped with a pin 9 in the pin hole, a lifting ring 13 is welded on the lower end of one of the round steels, a first hook 14 is connected on the lifting ring 13, and a lifting ring 13 is welded on the lower end of the other round steel. The adjusting ring 16 is connected with an adjusting screw 15 on the adjusting ring 17 , and is connected with a second hook 15 on the adjusting screw 16 . The round steel 2 and the vertical bar of the aluminum alloy ladder 1 are fixed with epoxy resin at the lower port portion of the aluminum alloy ladder 1 .

Claims (1)

1. string combination tool is hung in replacing, it is characterised in that:Including the aluminum alloy ladder that montant is blank pipe(1), in aluminum alloy ladder (1)Montant in be coated with round steel(2), in round steel(2)Top be welded with connecting plate(3), connecting plate(3)And aluminum alloy ladder (1)Montant on have the bolt connecting hole of adaptation, connecting plate(3)And aluminum alloy ladder(1)Montant ladder upper section and connecting plate Use bolt(4)Connection, the upper weld of a connecting plate has free bearing wherein(5), in free bearing(5)On be hinged with boatswain chair(7), Boatswain chair(7)End is provided with jack(8), have band pin-and-hole and baffle ring in the upper weld of another connecting plate(11)And jack(8) The latch of adaptation(10), in pin-and-hole built with pin(9), wherein the bottom of a round steel be welded with suspension ring(13), in suspension ring (13)On be connected with the first suspension hook(14), regulation ring is welded with the bottom of another round steel(16), in regulation ring(17)On It is connected with adjusting screw(15), in adjusting screw(16)On be connected with the second suspension hook(15);In aluminum alloy ladder(1)Lower port Portion's epoxy resin is by round steel(2)With aluminum alloy ladder(1)Montant fix;Hanging point and cross-arm stable connection;Double hooks, shoulder pole It is very steady;Shoulder pole is lifted vertically upward, and shoulder pole wire clamp is not crooked.
CN201210111186.9A 2012-04-17 2012-04-17 String combination tool is hung in replacing Active CN102623930B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210111186.9A CN102623930B (en) 2012-04-17 2012-04-17 String combination tool is hung in replacing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210111186.9A CN102623930B (en) 2012-04-17 2012-04-17 String combination tool is hung in replacing

Publications (2)

Publication Number Publication Date
CN102623930A CN102623930A (en) 2012-08-01
CN102623930B true CN102623930B (en) 2017-08-25

Family

ID=46563675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210111186.9A Active CN102623930B (en) 2012-04-17 2012-04-17 String combination tool is hung in replacing

Country Status (1)

Country Link
CN (1) CN102623930B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134063B (en) * 2015-09-24 2017-05-03 江苏省电力公司宝应县供电公司 Slide ladder for on-line operation
WO2020015543A1 (en) * 2018-07-16 2020-01-23 江苏宙际杰智能科技股份有限公司 Ladder

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2094812U (en) * 1990-12-21 1992-01-29 宁夏电力工业局银南供电局 Equal potential insulator changing tool
DE19653847A1 (en) * 1995-12-14 1997-06-19 Etude Et Construction De Ligne System allowing service personnel to access end of horizontal arm on mast carrying HV lines
CN201174540Y (en) * 2008-03-06 2008-12-31 福建省厦门电业局 Suspended insulator string live replacement device clamped with two-connection board
CN201282302Y (en) * 2008-10-14 2009-07-29 河南省电力公司郑州供电公司 Composite insulator force-bearing type scramble raiser
CN101567529A (en) * 2009-05-23 2009-10-28 江苏省电力公司无锡供电公司 Lifting ladder hook for insulated pulling materials
CN201345512Y (en) * 2008-12-11 2009-11-11 江西吉安供电公司 220KV double-circuit overhead tower-sharing circuit high-voltage strong-electric-field special tool
CN201466572U (en) * 2009-08-27 2010-05-12 河南省电力公司平顶山供电公司 Ladder for installation and replacement of composite insulators for high-voltage overhead lines
CN202059096U (en) * 2011-03-07 2011-11-30 北京市电力公司 Tool component capable of replacing insulator string electrically
CN202633821U (en) * 2012-04-17 2012-12-26 邯郸供电公司 Combination tool for replacing suspension string

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2094812U (en) * 1990-12-21 1992-01-29 宁夏电力工业局银南供电局 Equal potential insulator changing tool
DE19653847A1 (en) * 1995-12-14 1997-06-19 Etude Et Construction De Ligne System allowing service personnel to access end of horizontal arm on mast carrying HV lines
CN201174540Y (en) * 2008-03-06 2008-12-31 福建省厦门电业局 Suspended insulator string live replacement device clamped with two-connection board
CN201282302Y (en) * 2008-10-14 2009-07-29 河南省电力公司郑州供电公司 Composite insulator force-bearing type scramble raiser
CN201345512Y (en) * 2008-12-11 2009-11-11 江西吉安供电公司 220KV double-circuit overhead tower-sharing circuit high-voltage strong-electric-field special tool
CN101567529A (en) * 2009-05-23 2009-10-28 江苏省电力公司无锡供电公司 Lifting ladder hook for insulated pulling materials
CN201466572U (en) * 2009-08-27 2010-05-12 河南省电力公司平顶山供电公司 Ladder for installation and replacement of composite insulators for high-voltage overhead lines
CN202059096U (en) * 2011-03-07 2011-11-30 北京市电力公司 Tool component capable of replacing insulator string electrically
CN202633821U (en) * 2012-04-17 2012-12-26 邯郸供电公司 Combination tool for replacing suspension string

Also Published As

Publication number Publication date
CN102623930A (en) 2012-08-01

Similar Documents

Publication Publication Date Title
CN202353093U (en) Wire lifter for replacing insulator strings
CN201914121U (en) Installation tool of contact network cantilever
CN102623930B (en) String combination tool is hung in replacing
CN203536860U (en) A Hanger for Replacing Tension Insulators
CN201517022U (en) Lifting tools for pole-mounted equipment
CN102738733B (en) ± 660kV strain tower changes porcelain insulator suspension bracket
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN202633821U (en) Combination tool for replacing suspension string
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN203690795U (en) Carriage used for overhaul of insulator chain
CN202864675U (en) Shaft-type part hoisting tool
CN102738734B (en) Hanging bracket for replacing porcelain insulator on strain tower
CN111697487B (en) Pressure-measurable live replacement device for double insulator strings and operation method
CN202856246U (en) Insulator replacement device
CN202978098U (en) Overhead ground wire lifter
CN203114144U (en) Overhung maintenance hook ladder
CN202872248U (en) Hanging bracket for replacing porcelain insulator on strain tower
CN202594699U (en) Power transmission line lifting device for steel pipe tower
CN202193542U (en) A tool for fixing a circular pulley for a tower
CN205489269U (en) Overhead earth wire hoisting device for high tension transmission line
CN204858403U (en) Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity
CN205355684U (en) Straight line porcelain insulator dismouting hoist
CN205187631U (en) Adjustable lug hoisting accessory
CN205829046U (en) Double suspension centre power transmission line overhead ground wire hoisting tools

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA HEBEI ELECTRIC POW

Effective date: 20121214

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121214

Address after: 056002 No. 48 Zhonghua North Street, Hebei, Handan

Applicant after: Handan Power Supply Company

Applicant after: State Grid Corporation of China

Applicant after: Hebei Electric Power Corporation

Address before: 056002 No. 19 Zhonghua North Street, Hebei, Handan

Applicant before: Handan Power Supply Company

C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Handan Power Supply Company

Applicant after: Hebei Electric Power Corporation

Address before: 056002 No. 48 Zhonghua North Street, Hebei, Handan

Applicant before: Handan Power Supply Company

Applicant before: State Grid Corporation of China

Applicant before: Hebei Electric Power Corporation

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: HANDAN POWER SUPPLY COMPANY TO: STATE ELECTRIC NET CROP.

GR01 Patent grant
GR01 Patent grant