Thermal power plant common box bus hoisting structure
Technical field
The utility model is applied to the thermal power plant and is total in the case enclosed busbar layout installation and design.
Background technology
Saving is taken up an area of, energy-saving and emission-reduction are long-run development strategies of China.In the process of construction of thermal power plant, the common box bus support will be provided with a row separately or unite layout with the process pipe bilayer before main power house A row; Support is set separately wastes materials such as steel, concrete in a large number, unite that the installation of common box bus may be subjected to the duration influence when arranging, the common box bus support is for adapting to lower floor's process pipe needs thick heaviness that becomes, waste material again promptly not attractive in appearance; No matter above-mentioned which kind of support mode all has a large amount of civil engineering excavated volumes.In order to seek a kind of i.e. saving occupation of land, minimizing civil engineering excavated volume and material usage, saving duration, can satisfy electric independent arrangement of constructing simultaneously again, we have studied a kind of novel common box bus main power house A and have arranged hanging structure outside the wall.
The utility model content
The purpose of this utility model provides a kind of saving occupation of land and material, reduces the civil engineering excavated volume, and structure is light, attractive in appearance, does not influence the new arrangement structure of normal operation of common box bus and repair and maintenance.
For achieving the above object, the utility model provides a kind of thermal power plant common box bus hoisting structure, it is characterized in that: comprise pipe-hanging hook, cross-arm, suspension rod, connect cross-arm below the pipe-hanging hook, the cross-arm two ends connect suspension rod.
The utility model makes no longer needs no longer occupied ground of the parallel main power house A row of common box bus section support concrete foundation and structural column are set, and does not have the civil engineering excavated volume, reduces steel and concrete material in a large number; Pipe-hanging hook can be installed after the construction of main power house structural column at any time, satisfies electric independent construction requirement, saves the duration; To the normal operation of common box bus and repair and maintenance without any influence.
Description of drawings
Accompanying drawing is a structure installation diagram of the present utility model.
Embodiment
With reference to accompanying drawing, the utility model comprises pipe-hanging hook 2, upper strata cross-arm 3, upper strata suspension rod 4, lower floor's cross-arm 5, lower floor's suspension rod 6, pipe-hanging hook upper end is fixing with the A organ timbering welding of main power house metope 1, connects the upper strata cross-arm below the pipe-hanging hook, and the cross-arm two ends connect suspension rod.The quantity of cross-arm and suspension rod can arbitrarily be adjusted as required, install suspension rod and cross-arm after, common box bus 7 is installed.