CN202047325U - Special-shaped transition rail - Google Patents

Special-shaped transition rail Download PDF

Info

Publication number
CN202047325U
CN202047325U CN2011201282666U CN201120128266U CN202047325U CN 202047325 U CN202047325 U CN 202047325U CN 2011201282666 U CN2011201282666 U CN 2011201282666U CN 201120128266 U CN201120128266 U CN 201120128266U CN 202047325 U CN202047325 U CN 202047325U
Authority
CN
China
Prior art keywords
rail
transition
section
special
shaped transition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201282666U
Other languages
Chinese (zh)
Inventor
熊学政
谭科
唐小明
蒋秋林
牛德雄
殷红
熊丽
潘奋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Group Corp
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN2011201282666U priority Critical patent/CN202047325U/en
Application granted granted Critical
Publication of CN202047325U publication Critical patent/CN202047325U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model relates to a special-shaped transition rail, which comprises a reference rail section, a transition section and a new standard rail section, wherein the reference rail section is consistent with a standard reference rail to be joined; the new standard rail section is consistent with another new rail to be joined; and the transition section forms a connection transition between the reference rail section and the new standard rail section; and the rail surfaces of the three sections have the same height. The special-shaped transition rail provided in the utility model is simply structured and conveniently assembled; the height and width of the rail surface can be adjusted through the movement of a transition arc so that the transition of different types of steel rails can be finished on one steel rail; the special-shaped transition rail of the utility model is applicable to a straight line rail, a curve rail, a wooden sleeper and a concrete sleeper section; the transition of heavy and light rails are implemented in one step, so the number of supporting components and joining cost are greatly reduced; and the special-shaped transition rail is conveniently constructed and maintained.

Description

A kind of special-shaped transition rail
Technical field
The utility model relates to the railroad track technical field, and especially various different interorbitals have the transition rail of special-shaped butt joint.
Background technology
Rail is to be positioned under the train wheel, to bear the weight of train, and the used steel bar equipment of guiding train direction of advance.Its function provides the surface of a resistance minimum for train operation, and wheel load is passed to the rail lower part.Rail type is mainly (75,60,50,43,38) kg/m with every meter quality integer representation roughly, China's current standard steel rail type.60kg/m and above be heavy rail, 50kg/m is medium-sized, 43kg/m and followingly is light-duty rail.The rail type that adopts on the circuit should adapt to railway transporting amount, permissible velocity and axle heavy phase.
Dissimilar tracks adopts dissimilar rail.The rail that connects two different models, the past, normal compromise joint bar and the bolt of adopting connected, and required the alignment of two tread faces and working edge.The method of taking progressively (75~60 types, 60~50 types, 50~43 types etc.) transition was also once arranged, solved the connectivity problem between dissimilar rail.From present technology, transition between weight, light rail, 2 of need and above heterotypic rail are finished at least, and the spare part specification increases, and brings inconvenience to the scene thus.
For this reason, people find out a kind of way again and solve this type of problem.Promptly adopt different manganese rail to realize that a step transition puts in place.Because only only limiting to straight line sleeper location, steel-casting characteristic limitations, different manganese rail use, for present then none solution that settles at one go of the track of curve rail and other classifications.
Summary of the invention
The technical problems to be solved in the utility model is: provide a kind of and can realize between heavy and light shaped steel rail that one step transition puts, is suitable for various sleeper classifications and straight line and the general special-shaped transition rail of curve rail in place for overcoming above-mentioned deficiency.
The utility model is to solve the problems of the technologies described above the technical scheme that is adopted to be:
A kind of special-shaped transition rail, it is characterized in that forming by benchmark rail section, changeover portion and new standard gauge section three parts, wherein, benchmark rail section is consistent with a kind of standard basis rail that will dock, new standard gauge section is consistent with the another kind of new rail that will dock, changeover portion constitutes the transition that is connected between benchmark rail section and new standard gauge section two parts, and three sections rail level is with high.
By technique scheme, between benchmark rail section and changeover portion, changeover portion and new standard gauge are intersegmental all flatly is provided with vertical transition arcs; Between benchmark rail section and changeover portion, changeover portion and new standard gauge is intersegmental all vertically is provided with vertical transition arcs with rail level.
By technique scheme, described vertical transition arcs and vertically transition arcs be the transition arcs that the specification of two kinds of tracks that radius can dock is as required set.
By technique scheme, transition section length is less than a sleepers sky.
By technique scheme, special-shaped transition rail is height and all adjustable transition rail of width.
By technique scheme, special-shaped transition rail can move the transition arcs of adjusting at vertical direction by vertical transition arcs for height, and simultaneously, special-shaped transition rail also can move the transition arcs of adjusting by vertical transition arcs in the horizontal direction for width.
By technique scheme, described new standard gauge section is than light 1~4 model of benchmark rail section.
By technique scheme, described new standard gauge Duan Weijing high temperature heating, mould are annotated the rail section that rolls out unnecessary molten steel postforming grade.
Concrete, vertical transition arcs rises, and orbit altitude shortens; Vertically move in the transition arcs, track width narrows down.Transition section length is less than a sleepers sky, to guarantee that rail joint two sleepers are in same plane and function of use thereof.
The beneficial effects of the utility model:
The special-shaped transition rail of the utility model, simple in structure easy to assembly, height and the width that to adjust rail level that move by transition arcs, make dissimilar rail all can on an one steel rail, transition finish, its scope of application is not only applicable to the straight line rail and is applicable to the curve rail, and not only sleeper but also concrete sleeper location all can be general, because one step transition puts in place between heavy and light type rail, matching component significantly reduces, thereby makes that the butt joint cost significantly reduces, construction and easy to maintenance.
Description of drawings
Fig. 1 is the front view of the special-shaped transition rail of the utility model;
Fig. 2 is the vertical view of special-shaped transition rail;
Fig. 3 is the profile of benchmark rail section;
Fig. 4 is the profile of new standard gauge section;
Among the figure: (1) special-shaped transition rail, (2) benchmark rail section, (3) new standard gauge section, (4) changeover portion, (5) rail level, (6) are transition arcs, (7) vertical transition arcs, (R) vertical transition arcs radius, (R1) vertical transition arcs radius vertically
The specific embodiment
The utility model is described in further detail below in conjunction with embodiment and accompanying drawing, but do not limit the utility model.
The special-shaped transition rail 1 of the utility model, be that the end benchmark rail section 2 consistent with the benchmark rail is set on the benchmark base of the rail plinth that will dock, the other end is for annotating the new standard gauge section 3 that rolls out unnecessary molten steel postforming grade through high temperature heating, mould, 3 of benchmark rail section 2 and new standard gauge sections are made of changeover portion 4 and are connected transition, and each intersegmental rail level 5 is with high.
Benchmark rail section 2 takes vertical transition arcs 6 to be connected with vertical transition arcs 7 with new 3 of standard gauge sections.The specification of two kinds of tracks that vertical transition arcs radius R 1 and vertical transition arcs radius R all can dock is as required set.Vertically move benchmark rail 2 narrowed width in the transition arcs 6; Vertical transition arcs 7 rises, and benchmark rail 2 highly shortens, and progressively transition is the new standard gauge section 3 than benchmark rail section 2 light 1~4 model.Changeover portion 4 length are less than a sleepers sky, to guarantee that rail joint two sleepers at grade and function of use.Rail end connecting cleat (where be arranged on, need diagram) scope is the complete section that mould is annotated the new standard gauge section 3 that rolls.
Above disclosed only is preferred embodiment of the present utility model, can not limit the interest field of the utility model certainly with this, and therefore the equivalence of being done according to the utility model claim changes, and still belongs to protection domain of the present utility model.

Claims (8)

1. special-shaped transition rail, it is characterized in that forming by benchmark rail section, changeover portion and new standard gauge section three parts, wherein, benchmark rail section is consistent with a kind of standard basis rail that will dock, new standard gauge section is consistent with the another kind of new rail that will dock, changeover portion constitutes the transition that is connected between benchmark rail section and new standard gauge section two parts, and three sections rail level is with high.
2. special-shaped transition rail according to claim 1 is characterized in that between benchmark rail section and changeover portion, changeover portion and new standard gauge are intersegmental all flatly is provided with vertical transition arcs; Between benchmark rail section and changeover portion, changeover portion and new standard gauge is intersegmental all vertically is provided with vertical transition arcs with rail level.
3. special-shaped transition rail according to claim 2, it is characterized in that described vertical transition arcs and vertically transition arcs be the transition arcs that the specification of two kinds of tracks that radius can dock is as required set.
4. special-shaped transition rail according to claim 3 is characterized in that transition section length is less than a sleepers sky.
5. according to the described special-shaped transition rail of one of claim 1-4, it is characterized in that special-shaped transition rail is height and all adjustable transition rail of width.
6. special-shaped transition rail according to claim 5, it is characterized in that special-shaped transition rail can move the transition arcs of adjusting by vertical transition arcs for height at vertical direction, simultaneously, special-shaped transition rail also can move the transition arcs of adjusting by vertical transition arcs in the horizontal direction for width.
7. according to one of claim 1-4 or 6 described special-shaped transition rails, it is characterized in that described new standard gauge section is than light 1~4 model of benchmark rail section.
8. special-shaped transition rail according to claim 7 is characterized in that described new standard gauge Duan Weijing high temperature heating, mould notes roll out the rail section of unnecessary molten steel postforming grade.
CN2011201282666U 2011-04-27 2011-04-27 Special-shaped transition rail Expired - Fee Related CN202047325U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201282666U CN202047325U (en) 2011-04-27 2011-04-27 Special-shaped transition rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201282666U CN202047325U (en) 2011-04-27 2011-04-27 Special-shaped transition rail

Publications (1)

Publication Number Publication Date
CN202047325U true CN202047325U (en) 2011-11-23

Family

ID=44987639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201282666U Expired - Fee Related CN202047325U (en) 2011-04-27 2011-04-27 Special-shaped transition rail

Country Status (1)

Country Link
CN (1) CN202047325U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878664A (en) * 2015-06-15 2015-09-02 中铁四局集团有限公司 Modularized steel plate sleeper for bridging at tunnel portal and bridging method
CN107476143A (en) * 2017-08-28 2017-12-15 芜湖中铁科吉富轨道有限公司 A kind of diamond crossing gauge
CN108842525A (en) * 2018-09-05 2018-11-20 芜湖中铁科吉富轨道有限公司 A kind of special-shaped transition rail being connect for groove profile rail with I-rail
CN109162153A (en) * 2018-10-22 2019-01-08 中设设计集团股份有限公司 A kind of 1435/1520mm gauge orbit transfer linkage section suitable for gauge changing railway freight train
CN110130158A (en) * 2019-06-24 2019-08-16 芜湖中铁科吉富轨道有限公司 A kind of I-shaped transition rail
CN111705555A (en) * 2020-06-30 2020-09-25 中国铁建重工集团股份有限公司 Connecting structure of first steel rail and second steel rail
CN111705554A (en) * 2020-06-30 2020-09-25 中国铁建重工集团股份有限公司 Method for connecting 50kg/m steel rail and 80R steel rail
CN112975284A (en) * 2021-02-20 2021-06-18 中国铁建重工集团股份有限公司道岔分公司 Manufacturing method of special-shaped rail

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878664A (en) * 2015-06-15 2015-09-02 中铁四局集团有限公司 Modularized steel plate sleeper for bridging at tunnel portal and bridging method
CN107476143A (en) * 2017-08-28 2017-12-15 芜湖中铁科吉富轨道有限公司 A kind of diamond crossing gauge
CN108842525A (en) * 2018-09-05 2018-11-20 芜湖中铁科吉富轨道有限公司 A kind of special-shaped transition rail being connect for groove profile rail with I-rail
CN108842525B (en) * 2018-09-05 2024-05-10 芜湖中铁科吉富轨道有限公司 Special-shaped transition steel rail for connecting groove-shaped rail and I-shaped rail
CN109162153A (en) * 2018-10-22 2019-01-08 中设设计集团股份有限公司 A kind of 1435/1520mm gauge orbit transfer linkage section suitable for gauge changing railway freight train
CN110130158A (en) * 2019-06-24 2019-08-16 芜湖中铁科吉富轨道有限公司 A kind of I-shaped transition rail
CN111705555A (en) * 2020-06-30 2020-09-25 中国铁建重工集团股份有限公司 Connecting structure of first steel rail and second steel rail
CN111705554A (en) * 2020-06-30 2020-09-25 中国铁建重工集团股份有限公司 Method for connecting 50kg/m steel rail and 80R steel rail
CN112975284A (en) * 2021-02-20 2021-06-18 中国铁建重工集团股份有限公司道岔分公司 Manufacturing method of special-shaped rail

Similar Documents

Publication Publication Date Title
CN202047325U (en) Special-shaped transition rail
CN202265318U (en) Correction auxiliary device for motion bias rail of crane cart
CN204738187U (en) A simplify switch blade heel end structure for modern tram switch
CN102789531A (en) Method for designing jointless track of long and large bridge girder longitudinal butt plate type ballastless track for high-speed railway
US9206556B2 (en) Elevated frog and rail crossing track assembly
CN102322000A (en) Line rail symmetric three-throw turnout in urban rail traffic engineering
CN104452497B (en) Medium-and low-speed maglev system F shaped steel double slit jointing
CN102304882B (en) Line rail symmetric turnout No 4.5 in urban rail transit engineering
CN202208869U (en) Symmetrical three-throw turnout for line rails of urban rail transit engineering
CN106192610A (en) Track three-throw turnout
CN206553835U (en) A kind of track guard
CN204818534U (en) Railway built -in fitting welding position device
CN204982560U (en) A novel obtuse angle combination railway frog for railway rails
CN201459531U (en) Switch heel with adjustable outer rail brace
CN201354438Y (en) Ballast track high-speed railroad switch assembly platform
CN204738189U (en) F of moderate -low speed magnetic levitation system shaped steel double slit attach fitting
CN206512527U (en) It is a kind of to multiply more formula railway frog and the railway switch with the railway frog
CN203878422U (en) Guard rail device for railway crossing
CN204529208U (en) A kind of improved type wheel drop mechanism transfer bridge interlock system
CN206142667U (en) Bridge crane's crane span structure
CN204867941U (en) Assembly welding equipment of curved surface apron
CN107574727A (en) A kind of easy assembling type shield chassis composite sleeper and its application method
CN207277104U (en) A kind of easy assembling type shield trolley composite sleeper
CN101575832B (en) High-speed switch assembly platform for ballast rail
CN204716756U (en) A kind of three surface of contact sectional guide rails

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123

Termination date: 20160427