CN204738187U - A simplify switch blade heel end structure for modern tram switch - Google Patents

A simplify switch blade heel end structure for modern tram switch Download PDF

Info

Publication number
CN204738187U
CN204738187U CN201520383782.1U CN201520383782U CN204738187U CN 204738187 U CN204738187 U CN 204738187U CN 201520383782 U CN201520383782 U CN 201520383782U CN 204738187 U CN204738187 U CN 204738187U
Authority
CN
China
Prior art keywords
rail
switch
tongue
heel
buckle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520383782.1U
Other languages
Chinese (zh)
Inventor
蔡文锋
颜华
鹿广清
刘春城
林红松
张雷
杨吉忠
李忠继
徐浩
傅丽霖
余浩伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
China Railway Shanhaiguan Bridge Group Co Ltd
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
China Railway Shanhaiguan Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC, China Railway Shanhaiguan Bridge Group Co Ltd filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201520383782.1U priority Critical patent/CN204738187U/en
Application granted granted Critical
Publication of CN204738187U publication Critical patent/CN204738187U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a simplify switch blade heel end structure for modern tram switch to effectively improve the frequent nevertheless maintenance and the changeover procedures of complicacy originally, realized quick dismouting and maintenance, effectively guaranteed the normal running of vehicle. Including the switch blade with lie in fender rail, the stock rail of its both sides respectively, set up smooth movable bed board, bottom plate under the switch blade. It welds as an organic wholely with smooth movable bed board, bottom plate to keep off the rail, switch blade working edge, inoperative limit one side sets up clamp plate, the buckle of withholding its formation respectively, this clamp plate with keep off rail, smooth movable bed board welding, this buckle passes through high strength bolt and can dismantle with smooth movable bed plate -type one -tenth and be connected.

Description

A kind of simplification heel of switch rail structure for modern tram track switch
Technical field
The utility model relates to railroad track and urban track traffic, and particularly a kind of track switch for modern tram simplifies heel of switch rail structure.
Background technology
Point tongue is the vitals in railway switching machines, relies on pulling of tongue, train is introduced main track or side line direction.One end that tongue is connected with lead curve rail claims heel of switch rail.The heel end structure of tongue must ensure that tongue can require according to different turn-out tracks to swing in the plane, more stable and stronger again, manufactures simple, easy to maintenance.Being different from general railway switch and subway railroad switch, is meet mixed row traffic needs, and modern tram track switch has and adopts that flush type track structure, grooved rail, vehicle axle weight are low, the more high distinguishing feature of track switch frequency of utilization.In this case, for pulling in track switch that frequency is the highest, the tongue that the most easily occurs hurt maintenance and change and bring very large inconvenience, must study the structure being adapted to modern tram system features and service condition simple, can keep in repair, the heel of switch rail structure of easy-maintaining.
Current China track switch mainly adopts interval iron loose joint hair style tongue and elasticity flexible switch heel end structure two kinds of structural shapes.It is articulated structure that movable joint is equivalent to heel of switch rail, and tongue can freely be moved, and required conversion power is little.But complex structure, poor stability, is the weak link of turnout switch part, easily disease occurs.Elasticity flexible switch heel adopts common rail joint geometry, structure is relatively simple, firm, concerning the railway Ballast track of traditional open and ballastless track bed be easy to on-site maintenance maintenance, but adopt the heel of switch rail fixed form of ordinary couplings clamping plate still comparatively complicated for the modern tram track switch of embedded structure, rapid-maintenance requirement cannot be realized.Therefore, existing heel of switch rail structural shape cannot effectively be applicable to modern tram track switch.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of simplification heel of switch rail structure for modern tram track switch, to effectively improve originally frequent but the maintenance of complexity and replacing program, realize dismounting fast and maintenance, effectively ensure that the normal operation of vehicle.
It is as follows that the utility model solves the technical scheme that its technical problem adopts:
A kind of simplification heel of switch rail structure for modern tram track switch of the present utility model, comprise tongue and the gear rail, the stock rail that lay respectively at its both sides, sliding table plate, base plate are set under tongue rail, it is characterized in that: described gear rail is welded as a whole with sliding table plate, base plate; Described tongue working edge, side, inoperative limit arrange respectively and form to it pressing plate, the buckle withheld, and this pressing plate welds with gear rail, sliding table plate, and this buckle is formed by high-strength bolt and sliding table plate and removably connects.
The beneficial effects of the utility model are, the tongue met under flush type track structure and high frequency of utilization condition changes requirement, improve more greatly originally frequent but the maintenance of complexity and replacing program, very easily realize dismounting fast and maintenance, effectively ensure that the normal operation of vehicle; More be adapted to simultaneously modern tram axle heavy little, speed is low etc. is different from the operation condition of general railcar, by proposing the schematic design of novelty to heel of switch rail fixed form, this structure processing and manufacturing is simple, there is good economy, reduce construction and the maintenance cost of modern tram system.
Accompanying drawing explanation
This manual comprises following two width accompanying drawings:
Fig. 1 is a kind of simplification heel of switch rail structure top view for modern tram track switch of the utility model;
Fig. 2 is the profile of a kind of simplification heel of switch rail structure for modern tram track switch of the utility model;
Component shown in figure and corresponding mark: base plate 1, sliding table plate 2, pressing plate 3, gear rail 4, tongue 5, buckle 6, high-strength bolt 7, stock rail 8, rut are with trimmer 9, dovetail part 10.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
See figures.1.and.2, a kind of simplification heel of switch rail structure for modern tram track switch of the present utility model, comprises tongue 5 and the gear rail 4, the stock rail 8 that lay respectively at its both sides, arranges sliding table plate 2, base plate 1 under tongue 5 rail.Described gear rail 4 is welded as a whole with sliding table plate 2, base plate 1.Described tongue 5 working edge, side, inoperative limit arrange respectively and form to it pressing plate 3, the buckle 6 withheld, and this pressing plate 3 welds with gear rail 4, sliding table plate 2, and this buckle 6 is formed by high-strength bolt 7 and sliding table plate 2 and removably connects.Vertical buckle press is provided by pressing plate 3, buckle 6 pairs of tongue 5 heel ends.
Owing to first base plate 1 and gear rail 4, sliding table plate 2 being welded into overall welding with backing connected components, weld assembly is assembled stock rail 8, stock rail 8 assemble qualified after assemble tongue 5 again, tongue 5 mainly adopts the fixed form of buckle 6 and pressing plate 3 simultaneously, more easily realize dismounting fast and maintenance, effectively can ensure the normal operation of vehicle.
With reference to Fig. 2, between described tongue 5 flange of rail side and pressing plate 3, buckle 6, be provided with rut with trimmer 9.Adjusted the lateral attitude of tongue 5 heel end by rut with trimmer 9, can adjust by Use Adjustment sheet 9 when gap, tongue 5 heel end flange of rail both sides is greater than 1mm.
With reference to Fig. 1, the described tongue 5 heel end flange of rail has dovetail part 10, to control the length travel of tongue 5.
Some principles of a kind of simplification heel of switch rail structure for modern tram track switch of the above the utility model that just explains through diagrams, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore every corresponding modify of being likely utilized and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (3)

1. the simplification heel of switch rail structure for modern tram track switch, comprise tongue (5) and lay respectively at gear rail (4), the stock rail (8) of its both sides, sliding table plate (2), base plate (1) are set under tongue (5) rail, it is characterized in that: described gear rail (4) is welded as a whole with sliding table plate (2), base plate (1); Described tongue (5) working edge, side, inoperative limit arrange respectively and form to it pressing plate (3), the buckle (6) withheld, this pressing plate (3) welds with gear rail (4), sliding table plate (2), and this buckle (6) is formed by high-strength bolt (7) and sliding table plate (2) and removably connects.
2. a kind of simplification heel of switch rail structure for modern tram track switch as claimed in claim 1, is characterized in that: be provided with rut with trimmer (9) between described tongue (5) flange of rail side and pressing plate (3), buckle (6).
3. a kind of simplification heel of switch rail structure for modern tram track switch as claimed in claim 1, is characterized in that: described tongue (5) the heel end flange of rail has dovetail part (10).
CN201520383782.1U 2015-06-05 2015-06-05 A simplify switch blade heel end structure for modern tram switch Active CN204738187U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520383782.1U CN204738187U (en) 2015-06-05 2015-06-05 A simplify switch blade heel end structure for modern tram switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520383782.1U CN204738187U (en) 2015-06-05 2015-06-05 A simplify switch blade heel end structure for modern tram switch

Publications (1)

Publication Number Publication Date
CN204738187U true CN204738187U (en) 2015-11-04

Family

ID=54419931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520383782.1U Active CN204738187U (en) 2015-06-05 2015-06-05 A simplify switch blade heel end structure for modern tram switch

Country Status (1)

Country Link
CN (1) CN204738187U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735060A (en) * 2015-12-24 2016-07-06 中铁宝桥集团有限公司 Tramcar turnout point rail heel structure
CN106758564A (en) * 2016-12-02 2017-05-31 中国铁道科学研究院 Railway switch
CN107780311A (en) * 2017-12-05 2018-03-09 中国铁建重工集团有限公司 Railway switch and its slider bed platen
CN108286211A (en) * 2018-03-16 2018-07-17 成都市新筑路桥机械股份有限公司 A kind of embedded railway points system
CN109112906A (en) * 2018-09-27 2019-01-01 四川易亨机械制造有限公司 A kind of railway switch is with end structure and railway switch
CN109518548A (en) * 2018-12-05 2019-03-26 中国铁建重工集团有限公司 Track protective device
CN110565453A (en) * 2019-08-21 2019-12-13 武汉市市政建设集团有限公司 modern tramcar 60R2 trough rail double-line three-throw combined turnout and construction method thereof
CN111133149A (en) * 2017-09-19 2020-05-08 奥钢联Bwg有限责任公司 Switch rail device
CN113430872A (en) * 2021-07-08 2021-09-24 中国铁建重工集团股份有限公司道岔分公司 Tram switch is with tongue heel end structure
TWI761594B (en) * 2017-09-19 2022-04-21 德商奧鋼聯Bwg有限公司 switch device
WO2022267254A1 (en) * 2021-06-22 2022-12-29 中铁山桥集团有限公司 Tramcar turnout switch structure

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735060A (en) * 2015-12-24 2016-07-06 中铁宝桥集团有限公司 Tramcar turnout point rail heel structure
CN106758564A (en) * 2016-12-02 2017-05-31 中国铁道科学研究院 Railway switch
US11499271B2 (en) 2017-09-19 2022-11-15 Voestalpine Bwg Gmbh Switch device
CN111133149A (en) * 2017-09-19 2020-05-08 奥钢联Bwg有限责任公司 Switch rail device
CN111133149B (en) * 2017-09-19 2021-09-03 奥钢联Bwg有限责任公司 Switch rail device
TWI761594B (en) * 2017-09-19 2022-04-21 德商奧鋼聯Bwg有限公司 switch device
US11473247B2 (en) 2017-09-19 2022-10-18 Voestalpine Bwg Gmbh Switch device
CN107780311B (en) * 2017-12-05 2024-02-02 中国铁建重工集团股份有限公司 Railway switch and sliding bed platen thereof
CN107780311A (en) * 2017-12-05 2018-03-09 中国铁建重工集团有限公司 Railway switch and its slider bed platen
CN108286211A (en) * 2018-03-16 2018-07-17 成都市新筑路桥机械股份有限公司 A kind of embedded railway points system
CN109112906A (en) * 2018-09-27 2019-01-01 四川易亨机械制造有限公司 A kind of railway switch is with end structure and railway switch
CN109518548B (en) * 2018-12-05 2023-09-05 中国铁建重工集团股份有限公司 Rail protection device
CN109518548A (en) * 2018-12-05 2019-03-26 中国铁建重工集团有限公司 Track protective device
CN110565453A (en) * 2019-08-21 2019-12-13 武汉市市政建设集团有限公司 modern tramcar 60R2 trough rail double-line three-throw combined turnout and construction method thereof
WO2022267254A1 (en) * 2021-06-22 2022-12-29 中铁山桥集团有限公司 Tramcar turnout switch structure
CN113430872A (en) * 2021-07-08 2021-09-24 中国铁建重工集团股份有限公司道岔分公司 Tram switch is with tongue heel end structure

Similar Documents

Publication Publication Date Title
CN204738187U (en) A simplify switch blade heel end structure for modern tram switch
CN208219393U (en) Gapless sky rail track beam telescoping device
CN202164512U (en) Turnout switching device for rail set zone
CN202247542U (en) Standard gauge and meter gauge dual-gauge rigid-frog gauge merging device
CN201372394Y (en) Dual-gauge combined single turnout
CN202881776U (en) Turnout for urban railway traffic
CN201305797Y (en) Narrow gauge symmetrical turnout device
CN203403334U (en) Railway gauge regulating device
CN204738186U (en) A combination formula guardrail structure for modern tram switch
CN206887633U (en) A kind of grooved track trouble frog structure
CN201671024U (en) Damping railroad track
CN206153484U (en) Railhead connection mode joint bar of AT rail
CN203904783U (en) Joint bar for trough type rail
CN209703206U (en) A kind of groove-shape rail point tongue heel end movable joint structure
CN209194243U (en) A kind of railroad track transfer
CN204738189U (en) F of moderate -low speed magnetic levitation system shaped steel double slit attach fitting
CN201172779Y (en) Novel welding wing rail for railway combined frog
CN203034315U (en) Groove type wear-resistant guardrail used for railway turnout
CN203320361U (en) Railroad sleeper wear-resisting rail bearing platform
CN208830063U (en) A kind of metro depot tune machine turn line track structure
CN201801788U (en) Railway shock-absorbing steel rail
CN203362913U (en) Anti-fracture composition brake shoe for metro vehicle
CN205220703U (en) Switch changeover linkage
CN205223749U (en) Simple turnout and 7 number simple turnout , No. 8 simple turnout , No. 9 simple turnout thereof
CN205295816U (en) Railway safety crowds switch device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant