A kind of launching dolly with elevating function
Technical field
The utility model relates to a kind of launching dolly product scope, is a kind of launching dolly with elevating function specifically.
Background technology
At present, under the regular situation, the following water conservancy project after the boats and ships preparation is finished is done in the process, need in advance with jack with boats and ships jack-up certain altitude after, will descend the water dolly to slide into hull bottom subsequently, boats and ships are fallen be placed on down on the water dolly again, withdraw from jack, boats and ships are delivered to waterborne by following water dolly more at last.Yet the construction pattern of this routine is owing to be that jack and little water dolly are separately work, and the lifting time of jack has prolonged the production time of launching greatly, makes that the engineering efficient of following water operation of boats and ships is not high.For this reason, the applicant thinks, improve the work efficiency of the following water construction of traditional boats and ships, is necessary to design a kind of device that collects following water dolly and jack effect, to strengthen the construction alerting ability of water operation down, improves the work efficiency of engineering construction.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, provide a kind of convenient, flexible, effectively improve the launching dolly of construction working efficient, band elevating function simple in structure.
Goal of the invention of the present utility model is achieved in that a kind of launching dolly with elevating function, and it comprises the launching cradle body of the structure that moves in turn, and it is characterized in that: described launching cradle is equipped with jacking system on one's body.
The launching dolly of band elevating function described in the utility model, the described launching cradle jacking system on one's body that is arranged on is a jack.
The launching dolly of above-mentioned band elevating function, the described launching cradle jacking system on one's body that is arranged on is a hydraulic jack.
As the launching dolly of above-mentioned band elevating function, the improvement of its arbitrary technical scheme is a bolted connection between described jacking system and the launching cradle body.
Furthermore, the launching dolly of described band elevating function, the quantity of described jacking system is two groups, every group is two respectively.
Follow furthermore, the launching dolly of described band elevating function, two described every group jacking systems are separately positioned on the launching cradle left and right sides of end face on one's body.
The boats and ships that are used for preparing in described in the utility model and the prior art are implemented down the equipment of water and are compared, and it has the following advantages:
The utility model is equipped with jacking system on one's body at the launching cradle of routine, after the boats and ships preparation is finished, only need this device is slipped into the bottom of boats and ships, boats and ships directly are placed on this device, can support by jacking system, and can directly drag down water by the launching cradle body, replace traditional first jack-up and changed two steps of putting jack again, flexible, simultaneously, novel water dolly and the jacking system of organically will descending of this use combined, and both advantage is effectively made up, effectively improve construction working efficient, and simple in structure.Simultaneously, when the water dolly need not use jacking system instantly, jacking system can disassemble on one's body from launching cradle, made the utility model more flexible.
Description of drawings
Accompanying drawing 1 is the structural representation of the utility model most preferred embodiment.
Accompanying drawing 2 is removed for the utility model and is overlooked the direction structure scheme drawing behind the jacking system.
The specific embodiment
The utility model will be further described below in conjunction with accompanying drawing.
According to shown in Figure 1, the launching dolly of the described band elevating function of present embodiment, the launching cradle body 1 that it comprises the structure that moves in turn is equipped with wheel 3 above it, and launching cradle body 1 is horizontal " worker " font structure, and this vehicle body is a weld assembly.The utility model improves traditional launching dolly, on the described launching cradle body 1 jacking system 2 is installed, this jacking system 2 that is arranged on the launching cradle body 1 is jack, and specifically, the described jacking system 2 that is arranged on the launching cradle body 1 is hydraulic jack.The launching dolly of above-mentioned band elevating function, the improvement of its any one organization plan is a bolted connection between described jacking system 2 and the launching cradle body 1.
In the preparation process of launching dolly described in the utility model, furthermore, the launching dolly of described band elevating function, the quantity of described jacking system 2 is two groups, every group is two respectively, and two jacking systems 2 of every group are separately positioned on the left and right sides of launching cradle body 1 upper surface.
After the boats and ships preparation is finished, only need this device is slipped into the bottom of boats and ships, boats and ships directly are placed on this device, can be supported by jacking system 2, and can directly drag down water by launching cradle body 1.And as shown in Figure 2, when the water dolly need not use jacking system 2 instantly, jacking system 2 can disassemble from launching cradle body 1, made the utility model more flexible.
For this reason, the utility model is equipped with jacking system 2 on the launching cradle body 1 of routine, has replaced traditional first jack-up and has changed two steps of putting jack again, and is flexible, and it effectively makes up both advantage, effectively improves construction working efficient, and simple in structure.