CN202045720U - Production equipment for red mud board and wall material - Google Patents

Production equipment for red mud board and wall material Download PDF

Info

Publication number
CN202045720U
CN202045720U CN2011200656987U CN201120065698U CN202045720U CN 202045720 U CN202045720 U CN 202045720U CN 2011200656987 U CN2011200656987 U CN 2011200656987U CN 201120065698 U CN201120065698 U CN 201120065698U CN 202045720 U CN202045720 U CN 202045720U
Authority
CN
China
Prior art keywords
red mud
microwave drying
board
production equipment
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200656987U
Other languages
Chinese (zh)
Inventor
米跃
金同芳
金�畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011200656987U priority Critical patent/CN202045720U/en
Application granted granted Critical
Publication of CN202045720U publication Critical patent/CN202045720U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Press-Shaping Or Shaping Using Conveyers (AREA)
  • Finishing Walls (AREA)

Abstract

The utility model belongs to the board production equipment field, especially relates to a production equipment for red mud board and wall material. The production equipment is composed of a board forming area, a microwave drying area and a board cutting area from front to back all together disposed on a transmission device. The transmission device includes the board forming area, three belts respectively in the left, right and lower part of the microwave drying area, and a rolling shaft in the board cutting area. The upper part of the board forming area is a hopper while the lower part includes an upper pressure roller and a lower pressure roller in a mutual pressing relation. The microwave drying area is equipped with a microwave drying device, a cooling device and a humidity eliminating fan. A cutting saw is arranged in the board cutting area. The production equipment in the utility model employs red mud industrial waste to produce boards, thereby making waste profitable. The working efficiency is high of producing board and wall material mechanically through arranging the board forming area, the microwave drying area and the board cutting area successively on a transmission device. Suitable belts and pressures rollers are adopted according to shapes of the boards, so as to meet the requirements of producing red mud plane fireproofing and insulation boards, self-insulation building blocks, red mud partition wall boards with rabbets and the like.

Description

The production equipment of red mud saw lumber plate and walling
Technical field
The utility model relates to the production equipment of a kind of red mud saw lumber plate and walling, is particularly useful for the production preparation of red mud plane fireproof heated board, heat insulation building block, partition plate.
Background technology
Red mud is the industrial residue of discharging when producing aluminium oxide, one ton of aluminium oxide of every production will produce 0.8~1.5 ton of red mud, annual about 7,000 ten thousand tons of the red mud that produces in the whole world, the annual red mud that produces of China is about 3,000 ten thousand tons, but annual red mud utilization only accounts for 4%, a large amount of red muds can only and be filled out the marine site and dispose by the land stacking, the existence of a large amount of red muds, take a large amount of arable lands, Marine Pollution on the one hand, cause the destruction of ecological environment, on the other hand, increased the capital construction maintenance cost, life has brought and has had a strong impact on to human being's production.The comprehensive utilization of red mud becomes global a great problem at present.
Organic heat-insulating material plate is to be extruded through colding pressing through the Steam Heating foaming or by extruding machine equipment by polystyrene material to obtain.Insulation materials such as inorganic mineral wool, rock wool, glass silk flosssilk wadding, aluminium silicate wool can melt mineral material usually and practice into silk, and pressurization is composited through equipment to add glue then.Organic heat-insulating material plate is inflammable and discharge pernicious gas, and the lives and properties of human body are brought serious harm, and insulation material plates such as inorganic mineral wool, rock wool, glass silk flosssilk wadding, aluminium silicate wool, the production process power consumption is big, and application on human skin had injury, neither environmental protection does not meet the low-carbon economy demand for development again.
The utility model content
According to above deficiency of the prior art, the technical problems to be solved in the utility model is: the high red mud saw lumber plate of a kind of automaticity and the production equipment of walling are provided, can utilize the red mud industrial residue that red mud partition plate of plane fireproof heated board, heat insulation building block and band tongue and groove etc. is carried out mechanization production.
The technical scheme that its technical problem that solves the utility model adopts is: the production equipment of a kind of red mud saw lumber plate and walling, it is characterized in that: on conveyer, equipment comprises material sheet metal forming district successively from the front portion to the afterbody, microwave drying district and material plate cutting area, conveyer comprises the left side in material sheet metal forming district and microwave drying district, right, the axis of rolling of three belts in bottom and material plate cutting area, top, material sheet metal forming district is hopper, the bottom is last pressure roller and the lower compression roller to pressing up and down, be provided with the microwave drying device in the microwave drying district, cooling device and hydrofuge fan are provided with cast-cutting saw in the material plate cutting area.
Microwave drying device in the microwave drying district and cooling device (water cooling or air-cooling device) all are conventional or attainable device, and its operation principle and process are all same as the prior art.With material sheet metal forming district gained material plate dewatered drying, by the cast-cutting saw in the material plate cutting area material plate is cut into required size by the microwave drying district then.
The top in described material sheet metal forming district is provided with glass cloth emptying roller.In order to strengthen the intensity of material plate, can in raw materials for production, add glass fabric, therefore glass cloth emptying roller is set, by glass cloth emptying roller glass fabric and raw material are put into upper and lower pressure roller roll extrusion in the lump.
According to the difference of material plate shape, the selection scheme of belt and pressure roller is also had any different:
Scheme one:
Described left and right, three belts in bottom are the plane belt, and upper and lower pressure roller is flat roll.Generally, can adopt this programme as the preparation of material plate such as red mud plane fireproof heated board, heat insulation building block and walling, the material plate of making is cut sawing and is slit into required size through material plate cutting area the time.
Scheme two:
Described left and right, three belts in bottom are the belt of band convex surface, and last pressure roller is for being with the pressure roller of convex surface, and lower compression roller is a flat roll.All fluted by upper and lower, the forward and backward face of material plate that this programme is produced, the material plate of band groove is through material plate cutting area the time, be cut the center line incision of saw, obtain the red mud partition plate of two band tongue and grooves that one side is fluted, another side protrudes along last low groove.
Operation principle and process:
The utility model is the carrier of producing the material plate with left and right, following three belts and the axis of rolling, in material sheet metal forming district, raw materials for production are rendered on the lower conveyor belt by hopper, depress belt through last pressure roller and deliver to the microwave drying district, and the material strip that makes is gone into cutting area by the axis of rolling, automatically cut according to required size, can obtain the material plate (as red mud partition plate of red mud fireproof heated board, heat insulation building block, band tongue and groove etc.) of required specification.When the intensity of material plate is had higher requirements, can when throw in raw material, material sheet metal forming district glass fabric be put into upper and lower pressure roller in the lump by glass cloth emptying roller suppress.
The beneficial effect that the utility model had is: the production equipment that a kind of red mud saw lumber plate and walling are provided, by utilizing the material plates such as red mud partition plate of red mud industrial residue production plane fireproof heated board, heat insulation building block and band tongue and groove, with the red mud comprehensive utilization, turn waste into wealth; By on conveyer, setting gradually material sheet metal forming district, microwave drying district and material plate cutting area, thereby can carry out mechanization production, improve operating efficiency material plate and walling; Select different belts and pressure roller flexibly for use according to different material plate shapes, thereby just can produce the different material plates such as red mud partition plate of red mud plane fireproof heated board, heat insulation building block, band tongue and groove by a production equipment.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the structural representation of the belt of band convex surface;
Fig. 3 is the structural representation of the pressure roller of band convex surface;
Fig. 4 is the planar structure schematic diagram of red mud plane fireproof heated board or heat insulation building block;
Fig. 5 is the planar structure schematic diagram of the red mud partition plate of band tongue and groove.
Among the figure: 1, bottom belt; 2, left part belt; 3, right part belt; 4, material sheet metal forming district; 5, glass cloth emptying roller; 6, hopper; 7, go up pressure roller; 8, lower compression roller; 9, hopper; 10, hopper; 11, microwave drying district; 12, hydrofuge fan; 13, material plate cutting area; 14, the axis of rolling; 15, convex surface; 16, convex surface
The specific embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is described further:
As shown in Figure 1, the production equipment of red mud saw lumber plate and walling, mainly comprise material sheet metal forming district 4, microwave drying district 11, material plate cutting area 13, conveyer etc., on conveyer, equipment comprises material sheet metal forming district 4 successively from the front portion to the afterbody, microwave drying district 11 and material plate cutting area 13, conveyer comprises the left side in material sheet metal forming district and microwave drying district, right, three belts 2 in bottom, 3,1 and the axis of rolling 14 of material plate cutting area, top, material sheet metal forming district is hopper 6,9,10, the bottom is last pressure roller 7 and the lower compression roller 8 to pressing up and down, be provided with the microwave drying device in the microwave drying district 11, cooling device and hydrofuge fan 12 are provided with cast-cutting saw in the material plate cutting area 13.
Microwave drying device in the microwave drying district 11 and cooling device (water cooling or air-cooling device) all are conventional or attainable device, and its operation principle and process are all same as the prior art.With material sheet metal forming district 4 gained material plate dewatered dryings, by the cast-cutting saw in the material plate cutting area 13 the material plate is cut into required size by microwave drying district 11 then.
The top in described material sheet metal forming district 4 is provided with glass cloth emptying roller 5.In order to strengthen the intensity of material plate, can in raw materials for production, add glass fabric, therefore glass cloth emptying roller 5 is set, by glass cloth emptying roller 5 glass fabric and raw material are put into upper and lower pressure roller roll extrusion in the lump.
According to the difference of material plate shape, the selection scheme of belt and pressure roller is also had any different:
Scheme one:
Described left and right, three belts in bottom 2,3,1 are the plane belt, and upper and lower pressure roller 7,8 is flat roll.Generally, can adopt this programme as the preparation of red mud plane fireproof heated board, heat insulation building block material plates such as (as shown in Figure 4), the material plate of making is cut sawing and is slit into required size through material plate cutting area 13 time.
Scheme two:
Described left and right, three belts in bottom 2,3,1 are the belt (as shown in Figure 2) of band convex surface 15, and last pressure roller 7 is for being with the pressure roller (as shown in Figure 3) of convex surface 16, and lower compression roller 8 is a flat roll.All fluted by upper and lower, the forward and backward face of material plate that this programme is produced, the material plate of band groove is through material plate cutting area 13 time, be cut the center line incision of saw, obtain the red mud partition plate (as shown in Figure 5) of two band tongue and grooves that one side is fluted, another side protrudes along last low groove.
Operation principle and process:
The utility model is with a left side; right; following three belts 2; 3; 1 and the axis of rolling 14 for producing the carrier of material plate; slurry (mixed slurry of water glass adhesive and oyster shell whiting) is thrown in by hopper 6 and is entered in the lump; lower compression roller; on the process; the lower compression roller roll extrusion; obtain the surface layer plate of fireproof heated board; slurry (mainly comprises a kind of of perlite or glass bead; water glass adhesive; oyster shell whiting; red mud; waterproofing agent; blowing agent; antalkaline and inorganic substances etc.; described inorganic substances can be magnesia; aluminium oxide; silica; the flint clay powder; in the flyash one or more) render on the surface layer plate by hopper 9; through last; the lower compression roller roll extrusion obtains warming plate; slurry (mixed slurry of water glass adhesive and oyster shell whiting) is rendered on the warming plate by hopper 10 then; through last; the lower compression roller roll extrusion obtains the material plate; and bring microwave drying district 11 oven dry into by bottom belt 1; bring material plate cutting area 13 into by the axis of rolling 14 at last; automatically cut according to required size, the material plate that can obtain required specification is (as the red mud fireproof heated board; heat insulation building block; the red mud partition plate of band tongue and groove etc.).When the intensity of material plate is had higher requirements, can when throw in raw materials, material sheet metal forming district 4 glass fabric be put into upper and lower pressure roller in the lump by glass cloth emptying roller 5 suppress.

Claims (4)

1. the production equipment of red mud saw lumber plate and walling, it is characterized in that: on conveyer, equipment comprises material sheet metal forming district, microwave drying district and material plate cutting area successively from the front portion to the afterbody, conveyer comprises left and right, three belts in bottom in material sheet metal forming district and microwave drying district and the axis of rolling of material plate cutting area, top, material sheet metal forming district is hopper, the bottom is last pressure roller and the lower compression roller to pressing up and down, be provided with microwave drying device, cooling device and hydrofuge fan in the microwave drying district, in the material plate cutting area cast-cutting saw be set.
2. the production equipment of red mud saw lumber plate according to claim 1 and walling is characterized in that: the top in described material sheet metal forming district is provided with glass cloth emptying roller.
3. the production equipment of red mud saw lumber plate according to claim 1 and walling is characterized in that: described left and right, three belts in bottom are the plane belt, and upper and lower pressure roller is flat roll.
4. the production equipment of red mud saw lumber plate according to claim 1 and walling is characterized in that: described left and right, three belts in bottom are the belt of band convex surface, and last pressure roller is for being with the pressure roller of convex surface, and lower compression roller is a flat roll.
CN2011200656987U 2011-03-14 2011-03-14 Production equipment for red mud board and wall material Expired - Lifetime CN202045720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200656987U CN202045720U (en) 2011-03-14 2011-03-14 Production equipment for red mud board and wall material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200656987U CN202045720U (en) 2011-03-14 2011-03-14 Production equipment for red mud board and wall material

Publications (1)

Publication Number Publication Date
CN202045720U true CN202045720U (en) 2011-11-23

Family

ID=44986043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200656987U Expired - Lifetime CN202045720U (en) 2011-03-14 2011-03-14 Production equipment for red mud board and wall material

Country Status (1)

Country Link
CN (1) CN202045720U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102172967A (en) * 2011-03-14 2011-09-07 金同芳 Production equipment of plate material and wall material made of red mud
CN103831897A (en) * 2014-03-31 2014-06-04 北京运特科技有限公司 Production method and device for mold-free continuous production of light-aggregate composite wall material
CN103979935A (en) * 2014-05-19 2014-08-13 淄博新空间陶瓷有限公司 Fireproof heat-preserving decorative board and preparation method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102172967A (en) * 2011-03-14 2011-09-07 金同芳 Production equipment of plate material and wall material made of red mud
CN102172967B (en) * 2011-03-14 2012-12-12 米跃 Production equipment of plate material and wall material made of red mud
CN103831897A (en) * 2014-03-31 2014-06-04 北京运特科技有限公司 Production method and device for mold-free continuous production of light-aggregate composite wall material
CN103979935A (en) * 2014-05-19 2014-08-13 淄博新空间陶瓷有限公司 Fireproof heat-preserving decorative board and preparation method thereof
CN103979935B (en) * 2014-05-19 2015-12-30 淄博新空间陶瓷有限公司 Fireproof heat preservation decorative board and preparation method thereof

Similar Documents

Publication Publication Date Title
CN102172967B (en) Production equipment of plate material and wall material made of red mud
CN101514089B (en) Self-insulation external wallboard for buildings
CN101733809B (en) Method for manufacturing formed plate by utilizing papermaking wastes
CN102765908A (en) Method capable of utilizing mine tailings to produce aerated hollow brick
CN202045720U (en) Production equipment for red mud board and wall material
CN102924059A (en) Shale porous brick and method for manufacturing same
CN103880373B (en) A kind of thicker double-row hole light aggregate concrete partition board and production technique thereof
CN101967292B (en) Method preparing boards by using alkaline gelatinized starch as adhesive and waste vegetable fibers
CN103396157A (en) Light foamed ceramic wall building material with iron tailings as main raw material
CN105502915A (en) Production technology of using industrial waste residues for producing inorganic fiber heat preservation material
CN106007668A (en) Fabricated inorganic heat-insulation composite wallboard and preparation method thereof
CN105481298A (en) Perlite fireproof thermal baffle and preparation method thereof
CN100509691C (en) Method for mfg. energy-saving building brick using paper making mud
CN103570333A (en) Ultra-thin vermiculite-based fire-proof plate and preparation method thereof
CN101786288B (en) Method for preparing split bricks by utilizing tailings of high phosphorus hematite
CN105013801B (en) A kind of recovery and molding process of the automotive compounded luggage case leftover bits of polyester fiber
CN110395969A (en) A kind of compound gangue base exterior insulation of crystallite and preparation method thereof
CN101666134A (en) Chloride residue baked brick and manufacturing method thereof
CN102924043A (en) Shale yellow sand hollow brick and preparation method thereof
CN102745959A (en) Ceramsite self-insulation building block and preparation method
CN102011444A (en) High-strength wood-like low-carbon base plate and preparation method thereof
CN105544089B (en) Inorganic heat insulating fiber material producing process
CN205954894U (en) Incombustible graphite heated board of modifying
CN101804653B (en) Method for manufacturing fireproof density plates by using mulberry branches
CN109053107B (en) Brick making process by recycling construction waste

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20111123

Effective date of abandoning: 20130227

RGAV Abandon patent right to avoid regrant