CN202042948U - Intelligent load monitoring and early-warning system for distribution network - Google Patents

Intelligent load monitoring and early-warning system for distribution network Download PDF

Info

Publication number
CN202042948U
CN202042948U CN2011201621260U CN201120162126U CN202042948U CN 202042948 U CN202042948 U CN 202042948U CN 2011201621260 U CN2011201621260 U CN 2011201621260U CN 201120162126 U CN201120162126 U CN 201120162126U CN 202042948 U CN202042948 U CN 202042948U
Authority
CN
China
Prior art keywords
unit
communication unit
distribution network
gsm communication
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201621260U
Other languages
Chinese (zh)
Inventor
游步新
刘勇
田鹏
汤世龙
赵阔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING ELECTRIC POWER CO LTD JIANGJIN POWER SUPPLY BUREAU
State Grid Corp of China SGCC
Original Assignee
JIANGJIN POWER SUPPLY BUREAU OF CHONGQING ELECTRIC POWER CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGJIN POWER SUPPLY BUREAU OF CHONGQING ELECTRIC POWER CORP filed Critical JIANGJIN POWER SUPPLY BUREAU OF CHONGQING ELECTRIC POWER CORP
Priority to CN2011201621260U priority Critical patent/CN202042948U/en
Application granted granted Critical
Publication of CN202042948U publication Critical patent/CN202042948U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Abstract

The utility model relates to an intelligent load monitoring and early-warning system for a distribution network. The system comprises a voltage and current sensor, a filtering unit, an A/D (analog-digital) conversion unit, a CPU (central processing unit), a keyboard, a PUM (power management unit), a storage battery, a GSM (global system for mobile) communication unit I, a GSM communication unit II and a PC (personal computer). In the system, the voltage and current sensor arranged on a distribution transformer measures voltage and current signals so as to calculate the load information of the distribution transformer and judge whether the monitored transformer is underloaded or overloaded, so as to realize the load monitoring and the early warning for the distribution network. The system has the characteristics of low power consumption, good intuition, good simplification and convenience and the like and can effectively reduce damages and accidents caused by underloading or overloading of the distribution transformer.

Description

Power distribution network intelligence load monitoring and early warning system
Technical field
The utility model relates to power system load monitoring field, the particularly load monitoring of power distribution network and early warning.
Background technology
Along with the continuous development of urban construction, electricity need load is growing, and is also more and more higher to the reliability requirement of power supply.Even the of short duration power failure of some important loads also can cause great economic loss, this just has higher requirement to the urban power distribution network.And present load monitor system just carries out at large-scale transformer, the distribution transformer in the power distribution network especially city also there is not unified load monitor system.But because the capacity of city power distribution transformer is all smaller, and the development in city is very fast, is easy to cause its overload, thereby causes power outage, causes great economic loss.
At the problem that exists in the reality, need a kind of low-power consumption, the simple in structure and device that can accurately measure distribution transformer institute on-load in real time, provide alert at the transformer of overload or underloading.The utility model mainly is to utilize voltage, the voltage of current sensor measurement distribution transformer, the current signal that is installed on the distribution transformer, after the signal filtering that collects, digitlization, sending into central information processor handles, calculate the load of distribution transformer, and judge institute's monitoring transformer whether underloading or overload, then its information on load and result of determination are sent to information centre by wireless communication module, and be presented on the computer of information centre, realize load monitoring to distribution network.
Summary of the invention
The purpose of this utility model provides a kind of power distribution network intelligence load monitoring and early warning system, this system is fit to power distribution network is carried out real time on-line monitoring, can monitor the variation of power distribution network load at any time, in time find the situation of distribution transformer underloading or overload, this can reduce electric operational accident, raising power supply reliability, guarantee the safe operation of power equipment.
To achieve these goals, the utility model adopts following technical scheme:
Power distribution network intelligence load monitoring and early warning system comprise voltage-current sensor, filter unit, AD conversion unit, central information processor, keyboard, Power Management Unit, storage battery, gsm communication unit I, gsm communication unit II, PC; Wherein,
The output of described voltage-current sensor is connected with the input of filter unit, and the output of filter unit is connected with analog-to-digital input; Described central information processor is connected with keyboard, AD conversion unit, gsm communication unit I, Power Management Unit respectively; Storage battery is connected with Power Management Unit, and PC is connected with the gsm communication unit II; Realize that with communication the transmission of data receives between gsm communication unit I and the gsm communication unit II.
The utility model is owing to said structure, and its advantage is: (1) has characteristics such as directly perceived, quick, easy; (2) remedied can not get in the past distribution transformer with the shortcoming of information on load; (3) the native system cost is low, and the reliability height has tangible effect for reducing the distribution transformer underloading or crossing the loss and the accident that bring.
Description of drawings
Device of the present utility model can further specify by the indefiniteness embodiment that accompanying drawing provides,
Fig. 1 is a system architecture diagram of the present utility model;
Fig. 2 is an operational flowchart of the present utility model;
Among the figure: the 1-voltage-current sensor; The 2-central information processor; 3.1-gsm communication unit I; 3.2-gsm communication unit II; The 4-filter unit; The 5-AD conversion unit; The 6-Power Management Unit; The 7-storage battery; The 8-keyboard; The 9-PC.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Referring to Fig. 1, a kind of power distribution network intelligence load monitoring and early warning system comprise voltage-current sensor 1, filter unit 4, AD conversion unit 5, central information processor 2, keyboard 8, Power Management Unit 6, storage battery 7, gsm communication unit I 3.1, gsm communication unit II 3.2, PC 9; Wherein,
The output of described voltage-current sensor 1 is connected with the input of filter unit 4, and the output of filter unit 4 is connected with the input of analog-to-digital conversion 5; Described central information processor 2 is connected with keyboard 8, AD conversion unit 5, gsm communication unit, Power Management Unit 6 respectively; Storage battery 7 is connected with Power Management Unit 6, PC 9 be connected; Realize that with communication the transmission of data receives between gsm communication unit I 3.1 and the gsm communication unit II 3.2.
Wherein, central information processor 2 adopts the PIC18F2520 of Microchip company; The TC35i that GSM data communication units I 3.1, gsm communication unit II 3.2 all adopt Siemens Company to produce; The LC-XD1217 storage battery power supply that storage battery 7 adopts Panasonic to produce; Electric power management circuit 6 adopts power conversion chip AMS1117-3.3V.
Referring to Fig. 2, voltage-current sensor 1 is measured the electric current and voltage of distribution transformer, central information processor carries out Treatment Analysis to data then, obtain distribution transformer with load value, and judge institute's monitoring transformer whether underloading or overload, if then on PC, show early warning, otherwise continue the return data collection.

Claims (1)

1. power distribution network intelligence load monitoring and early warning system, it is characterized in that: this system comprises voltage-current sensor (1), filter unit (4), AD conversion unit (5), central information processor (2), keyboard (8), Power Management Unit (6), storage battery (7), gsm communication unit I (3.1), gsm communication unit II (3.2), PC (9); Wherein,
The output of described voltage-current sensor (1) is connected with the input of filter unit (4), and the output of filter unit (4) is connected with the input of analog-to-digital conversion (5); Described central information processor (2) is connected with keyboard (8), AD conversion unit (5), gsm communication unit I (3.1), Power Management Unit (6) respectively; Storage battery (7) is connected with Power Management Unit (6), and PC (9) is connected with gsm communication unit II (3.2); Realize that with communication the transmission of data receives between gsm communication unit I (3.1) and the gsm communication unit II (3.2).
CN2011201621260U 2011-05-20 2011-05-20 Intelligent load monitoring and early-warning system for distribution network Expired - Fee Related CN202042948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201621260U CN202042948U (en) 2011-05-20 2011-05-20 Intelligent load monitoring and early-warning system for distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201621260U CN202042948U (en) 2011-05-20 2011-05-20 Intelligent load monitoring and early-warning system for distribution network

Publications (1)

Publication Number Publication Date
CN202042948U true CN202042948U (en) 2011-11-16

Family

ID=44970373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201621260U Expired - Fee Related CN202042948U (en) 2011-05-20 2011-05-20 Intelligent load monitoring and early-warning system for distribution network

Country Status (1)

Country Link
CN (1) CN202042948U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103794039A (en) * 2012-10-31 2014-05-14 西门子公司 Real-time measurement device and control device of electric power system
CN107942155A (en) * 2017-10-24 2018-04-20 德合南京智能技术有限公司 Energy efficiency analysis intelligent workstation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103794039A (en) * 2012-10-31 2014-05-14 西门子公司 Real-time measurement device and control device of electric power system
CN107942155A (en) * 2017-10-24 2018-04-20 德合南京智能技术有限公司 Energy efficiency analysis intelligent workstation

Similar Documents

Publication Publication Date Title
CN204886412U (en) Be applied to safety monitoring device of consumer
CN103487089B (en) A kind of underground water table water temperature remote data transmission device and method
CN103453998B (en) A kind of self-energizing radio temperature sensor and its implementation
CN205210069U (en) Water quality monitoring system based on cloud
CN207764339U (en) A kind of overhead type fault locator based on NB-IOT communications
CN203101976U (en) Online lampblack monitoring system
CN202141776U (en) Online fault detection system of 10kV fuse protector
CN201811983U (en) Collection terminal device of special transformer
CN103063906A (en) Electric power switch cabinet wireless monitoring system
CN209692755U (en) A kind of integrated wisdom power-supply device of band NB-IoT wireless communication
CN201639098U (en) Intelligent perception socket for energy consumption monitoring system based on Internet of things
CN202042948U (en) Intelligent load monitoring and early-warning system for distribution network
CN107748283A (en) A kind of micro energy lose electric energy meter metered voltage current monitoring alarm device and its monitoring method
CN202372633U (en) Power supply detection device used for communication
CN203349964U (en) Self-energy-obtaining wireless temperature sensing chip
CN204694753U (en) A kind of high-precision transmission line of electricity electric current on-Line Monitor Device
CN203909212U (en) Power distribution network line fault indicator
CN202189425U (en) Outdoor distribution transformer remote fault diagnosis and antitheft early warning system
CN201122168Y (en) Expandable multifunctional harmonic wave table
CN204287436U (en) A kind of battery monitoring system
CN203455024U (en) Early warning apparatus for secure operation of switch cabinet
CN203965600U (en) A kind of motor remote fault diagnosis and monitoring system
CN207380102U (en) A kind of micro energy lose electric energy meter metered voltage current monitoring alarm device
CN203166625U (en) Wireless monitoring system of power switch cabinet
CN202512222U (en) Detachable voltage intelligent polling instrument for storage battery

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121029

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121029

Address after: 402260 Chongqing city Jiangjin Jijiang Binjiang Road West No. 366

Patentee after: Chongqing Electric Power Co.,Ltd. Jiangjin Power Supply Bureau

Patentee after: State Grid Corporation of China

Address before: 402260 Chongqing city Jiangjin Jijiang Binjiang Road West No. 366

Patentee before: Chongqing Electric Power Co.,Ltd. Jiangjin Power Supply Bureau

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111116