CN202042864U - 半复合杆塔不平衡绝缘接地装置 - Google Patents
半复合杆塔不平衡绝缘接地装置 Download PDFInfo
- Publication number
- CN202042864U CN202042864U CN2011200206792U CN201120020679U CN202042864U CN 202042864 U CN202042864 U CN 202042864U CN 2011200206792 U CN2011200206792 U CN 2011200206792U CN 201120020679 U CN201120020679 U CN 201120020679U CN 202042864 U CN202042864 U CN 202042864U
- Authority
- CN
- China
- Prior art keywords
- lead
- loop
- earthing
- power transmission
- down lead
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
本实用新型提供一种半复合杆塔不平衡绝缘接地装置,在半复合杆塔的复合材料杆顶端安装地线横担,地线横担两端装有地线电极,引下线引出杆的一端与地线横担连接,另一端与接地引下线连接,接地引下线悬空向下连接至引下线连接杆,引下线连接杆与半复合杆塔的钢材杆连接,接地引下线到两侧输电导线之间的距离之比在0.1~0.9之间。在发生雷击时,接地引下线到输电导线距离小的一侧回路首先对地线放电,击穿后的回路输电导线相当于耦合地线,增加了对另一回路输电导线的耦合作用,使另一回路耐雷水平提高,不致击穿,保证了另一回路线路能够继续供电,最大限度地发挥了同塔双回线路的作用,降低了电力输电线路双回路在发生雷击时同时跳闸概率。
Description
技术领域
本实用新型涉及电力输电线路的接地装置,特别是涉及半复合杆塔不平衡绝缘接地装置。
背景技术
为了节约土地资源、提高输电线路传输效率和降低投资成本,现有的架空输电线路多采用双回或多回共塔架设,而且,双回共塔输电线路同为一个变电站的电源,但这样一来,一旦输电线路遭受雷击同时跳闸,将引起变电站失压事故。在考虑综合经济效益的情况下,高压送电线路的雷击跳闸率应尽可能降低,但是,在多雷区,雷击造成同塔双回线路同时跳闸的现象屡见不鲜,这无疑削弱了同塔双回线路的供电效果。对同塔双回线路应努力保证一回线路供电不中断,最大限度地发挥同塔双回线路的作用。
半复合杆塔在同塔双回线路上的应用能够大幅度提高线路的绝缘性能,其塔体上段为绝缘的复合材料杆,下段为导电的钢材杆,与全复合杆塔相比其稳定性较好,相同荷载下形变更小。在采用半复合杆的同塔双回线路中,其耐雷水平主要由相地之间空气间隙的绝缘水平控制,由于半复合杆上段为绝缘的复合材料,因此耐雷水平为导线与接地引下线间空气间隙。而目前,半复合杆塔的输电线路的两条线路与接地引下线间的空气间隙基本相同,即两回路耐雷水平基本相同,所以,在雷击发生时,两线路同时跳闸概率较大。
发明内容
本实用新型的目的是提供一种半复合杆塔不平衡绝缘接地装置,此接地装置能降低电力输电线路双回路在发生雷击时同时跳闸概率。
为了达到上述目的,本实用新型的半复合杆塔不平衡绝缘接地装置,包括地线横担、地线电极和引下线引出杆,地线横担安装在半复合杆塔的复合材料杆顶端,地线横担两端装有地线电极,引下线引出杆的一端与地线横担连接,另一端与接地引下线连接,接地引下线悬空向下连接至引下线连接杆,引下线连接杆与半复合杆塔的钢材杆连接,其特征在于:接地引下线到两侧输电导线之间的距离之比在0.1~0.9之间。
因为接地引下线到两侧输电导线之间的距离之比在0.1~0.9之间,从而在发生雷击时,接地引下线到输电导线距离小的一侧回路首先对地线放电,击穿后的回路输电导线相当于耦合地线,增加了对另一回路输电导线的耦合作用,使另一回路耐雷水平提高,不致击穿,保证了另一回路线路能够继续供电,从而最大限度地发挥了同塔双回线路的作用,降低了电力输电线路双回路在发生雷击时同时跳闸概率。
本实用新型的半复合杆塔不平衡绝缘接地装置能降低电力输电线路双回路在发生雷击时同时跳闸概率。
附图说明
图1是本实用新型实施例的结构示意图。
图2是图1的俯视图。
具体实施方式
图1标记的说明:地线横担1,地线电极2,引下线引出杆3,导线侧电极4,复合材料杆5,导线横担6,接地引下线7,引下线连接杆8,钢材杆9。
图2标记的说明:输电导线10。
参见图1,本实用新型半复合杆塔不平衡绝缘接地装置的实施例是:在半复合杆塔的复合材料杆5顶端安装地线横担1,地线横担1两端装有地线电极2,引下线引出杆3的一端与地线横担1连接,另一端与接地引下线7连接,接地引下线7悬空向下连接至引下线连接杆8,引下线连接杆8与半复合杆塔的钢材杆9连接,导线横担6固定在复合材料杆5的两侧,导线横担6上固定有导线侧电极4,输电导线10固定在导线侧电极4上,接地引下线7到两侧输电导线10之间的距离之比在0.1~0.9之间,实施例中,两侧输电导线10之间的距离为3.5m,接地引下线7到一侧输电导线10的距离为1m,到另一侧输电导线10的距离为3.5m。
因为接地引下线7到两侧输电导线10之间的距离不一样,从而在发生雷击时,接地引下线7到输电导线10距离小的一侧回路首先对地线放电,击穿后的回路输电导线10相当于耦合地线,增加了对另一回路输电导线10的耦合作用,使另一回路耐雷水平提高,不致击穿,保证了另一回路线路能够继续供电,从而最大限度地发挥了同塔双回线路的作用,降低了电力输电线路双回路在发生雷击时同时跳闸概率,提高了双回线路的工作可靠性。
本实用新型的半复合杆塔不平衡绝缘接地装置能降低电力输电线路双回路在发生雷击时同时跳闸概率,此装置的推广应用,对提高半复合杆塔双回线路的供电可靠性有着积极的意义。
Claims (1)
1.半复合杆塔不平衡绝缘接地装置,包括地线横担、地线电极和引下线引出杆,地线横担安装在半复合杆塔的复合材料杆顶端,地线横担两端装有地线电极,引下线引出杆的一端与地线横担连接,另一端与接地引下线连接,接地引下线悬空向下连接至引下线连接杆,引下线连接杆与半复合杆塔的钢材杆连接,其特征在于:接地引下线到两侧输电导线之间的距离之比在0.1~0.9之间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200206792U CN202042864U (zh) | 2011-01-24 | 2011-01-24 | 半复合杆塔不平衡绝缘接地装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200206792U CN202042864U (zh) | 2011-01-24 | 2011-01-24 | 半复合杆塔不平衡绝缘接地装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202042864U true CN202042864U (zh) | 2011-11-16 |
Family
ID=44970290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200206792U Expired - Lifetime CN202042864U (zh) | 2011-01-24 | 2011-01-24 | 半复合杆塔不平衡绝缘接地装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202042864U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104006733A (zh) * | 2014-06-05 | 2014-08-27 | 国家电网公司 | 一种杆塔接地引下线入地构架与下相横担距离的确定方法 |
CN113629646A (zh) * | 2021-08-13 | 2021-11-09 | 广东电网有限责任公司 | 一种接地线装置及电力设备 |
-
2011
- 2011-01-24 CN CN2011200206792U patent/CN202042864U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104006733A (zh) * | 2014-06-05 | 2014-08-27 | 国家电网公司 | 一种杆塔接地引下线入地构架与下相横担距离的确定方法 |
CN104006733B (zh) * | 2014-06-05 | 2017-01-25 | 国家电网公司 | 一种杆塔接地引下线入地构架与下相横担距离的确定方法 |
CN113629646A (zh) * | 2021-08-13 | 2021-11-09 | 广东电网有限责任公司 | 一种接地线装置及电力设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203352100U (zh) | 输电线路防风拉线横担装置 | |
CN203423464U (zh) | 一种用于双回配电线路的防雷装置 | |
CN202042864U (zh) | 半复合杆塔不平衡绝缘接地装置 | |
CN103669970B (zh) | 单回路输电线路直线边坡塔 | |
CN202871418U (zh) | 10~35kV悬式绝缘子 | |
CN203406589U (zh) | 砼杆接地引线保护装置 | |
CN203891557U (zh) | 紧凑型绝缘支架 | |
CN202749521U (zh) | 防盗接地极 | |
CN205646747U (zh) | 一种±800千伏直流线路避雷器安装装置 | |
CN203113878U (zh) | 导线加高横担装置 | |
CN204304163U (zh) | 高压输电线路接地引下线 | |
CN204905828U (zh) | 一种架空输电线防雷装置 | |
CN203867262U (zh) | 一种特高压直流单回路跨越塔塔头 | |
CN203481768U (zh) | 10kV系统绝缘架空线路耐张杆用球形固定外间隙避雷器 | |
CN203166445U (zh) | 一种利用耦合地线降低输电线路雷击跳闸率的装置 | |
CN202996445U (zh) | 一种带脱离器型复合绝缘柱式防雷绝缘子 | |
CN201081453Y (zh) | 一种避雷型太阳能热水器 | |
CN202455022U (zh) | 网砼杆防雷保护装置 | |
CN203701693U (zh) | 单回路输电线路直线边坡塔 | |
CN204112824U (zh) | 一种输电线路电杆加高防雷装置 | |
CN204179566U (zh) | 一种双串绝缘子绝缘牵引器 | |
CN204464915U (zh) | 交流输电线路铁塔 | |
CN204696253U (zh) | 一种具备降低冲击接地阻抗的接地装置 | |
CN202026065U (zh) | 半复合材料杆塔输电线路接地装置 | |
CN204333319U (zh) | 一种接地线绝缘杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20111116 |