CN202041134U - 煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构 - Google Patents
煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构 Download PDFInfo
- Publication number
- CN202041134U CN202041134U CN2011201204953U CN201120120495U CN202041134U CN 202041134 U CN202041134 U CN 202041134U CN 2011201204953 U CN2011201204953 U CN 2011201204953U CN 201120120495 U CN201120120495 U CN 201120120495U CN 202041134 U CN202041134 U CN 202041134U
- Authority
- CN
- China
- Prior art keywords
- hole
- high inclination
- inclination angle
- hardening cement
- sealing structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构,其特征在于,包括向上倾斜的钻孔内放置的炸药卷,在钻孔的封口位置填充长250mm、直径35mm的快硬水泥药卷,所述快硬水泥药卷中穿过两根独立的导爆索,在所述快硬水泥药卷外部的两根导爆索上分别安装雷管。本实用新型的有益效果是,大倾角采煤工作面进行爆破的过程中,不会发生在装药时经常出现的药卷在孔内自动下滑的问题,即使有不会影响封孔,保证封孔质量、爆破效果和安全生产。
Description
技术领域
本实用新型涉及一种用于煤矿等地下矿井内的爆破结构,具体的说是煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构。
背景技术
随着国际形势的发展和自然灾害的影响,我国的能源安全显得越来越重要。能源结构在我国近期不会有大的变动,煤炭的基础地位也不会改变。而煤炭作为不可再生能源,合理的开采利用也显得越来越重要。
煤矿坚硬顶板采煤工作面随着工作面向前推进,采空区悬顶面积不断扩大,当大面积的悬顶瞬间垮落时,极易形成风暴和冲击波,造成人员伤亡和设备损坏。超前预爆破处理采空区顶板是目前处理这类问题的主要手段,而炮孔的封孔技术是爆破效果的关键。
由于煤层赋存条件不同,煤矿采煤工作面大都带有倾角,倾角大于30°的强制放顶炮孔较常见。装药时经常出现药卷在孔内自动下滑,如遇有水时封孔将更加困难,难以保证封孔质量,影响爆破效果,影响安全生产。
实用新型内容
基于上述问题,本实用新型提供一种煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构,可以解决现有技术对大倾角采煤工作面进行爆破的过程中,存在的装药时经常出现药卷在孔内自动下滑,如遇有水时封孔将更加困难,难以保证封孔质量,影响爆破效果,影响安全生产的问题。
本实用新型的目的是通过以下技术方案来实现:
煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构,包括向上倾斜的钻孔内放置的炸药卷,在钻孔的封口位置填充长250mm、直径35mm的快硬水泥药卷,所述快硬水泥药卷中穿过两根独立的导爆索,其中一个导爆索作为主导爆索,另一个导爆索作为副导爆索,备用。在所述快硬水泥药卷外部的两根导爆索上分别安装雷管。
本实用新型的有益效果是,大倾角采煤工作面进行爆破的过程中,不会发生在装药时经常出现的药卷在孔内自动下滑的问题,即使有不会影响封孔,保证封孔质量、爆破效果和安全生产。
钻孔直径为90mm(钻孔设备为SKZ-120A型钻机);炸药选用二级煤矿许用乳化炸药,防静电塑料壳包装,规格为直径60mm、长度500mm,单位重量3.0kg/m,联结方式为丝扣联结式;堵孔材料为快硬水泥药卷,规格为长250mm、直径35mm,浸水后送入孔内轻轻捣实,封孔水泥长度不得小于1m;导爆索选用煤矿安全防水抗拉导爆索;雷管选用毫秒延期电雷管;发爆器选用MFB-100型电容式发爆器;起爆方式采用电雷管起爆导爆索,导爆索起爆炸药的起爆方式。每个炮孔均设置有主、副两根导爆索,同一炮孔雷管段号一致;导爆索与炸药串每间隔1m用电工胶布捆绑固定,以防止传爆不良而造成炸药卷拒爆;起爆时,所有人员必须撤离工作面,与超前预爆破地点的安全距离不得小于300m;放炮后经通风30分钟之后,安监人员方可进入检查放炮地点及回采工作面,确认安全后,其他人员才能进入作业地点。
如采用常规的炮泥(黄土)封孔,由于受凝固时间影响,很难保证炸药束不下滑;炮孔内再加上有淋水,就更无法封孔。
关键技术:为防止药卷在孔内自动下滑和炮孔内淋水的影响,采用将炸药在孔口逐个连接好向里推,最后一卷炸药后紧跟快硬水泥药卷,快硬水泥药卷三卷一起用麻绳捆在一起在水里浸水0.5min,连同炸药一起推向眼底;当炸药接触眼底时,轻轻抵住快硬水泥药卷束1~2min,确保炸药束和快硬水泥药卷束不下滑后,轻轻捣实;迅速继续用快硬水泥药卷束封堵,确保封孔水泥长度均不得小于1m。
注意事项:专用堵孔水泥由人工顶推至孔内并捣实;使用专用堵孔水泥卷时应检查水泥卷是否受潮结块,否则不能使用。水泥卷正常浸水时间为1~1.5分钟;用炮棒将专用堵孔水泥卷依照设计长度,人工逐个推入孔内并适当捣实,捣水泥卷时应将导爆索拉直,避免损坏导爆索;堵孔后,专用堵孔水泥卷的凝固时间不应小于30min,凝固后方可连线放炮。
附图说明
下面根据附图和实施例对本实用新型作进一步详细说明。
图1是本实用新型实施例所述的煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构的结构图。
具体实施方式
如图1所示,本实用新型实施例所述的煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构,包括向上倾斜的钻孔内放置的炸药卷2,在钻孔的封口位置填充长250mm、直径35mm的快硬水泥药卷3,所述快硬水泥药卷3中穿过两根独立的导爆索1,其中一个导爆索作为主导爆索,另一个导爆索作为副导爆索,备用。在所述快硬水泥药卷外部的两根导爆索上分别安装雷管4。
本实用新型的有益效果是,大倾角采煤工作面进行爆破的过程中,不会发生在装药时经常出现的药卷在孔内自动下滑的问题,即使有不会影响封孔,保证封孔质量、爆破效果和安全生产。
钻孔直径为90mm(钻孔设备为SKZ-120A型钻机);炸药选用二级煤矿许用乳化炸药,防静电塑料壳包装,规格为直径60mm、长度500mm,单位重量3.0kg/m,联结方式为丝扣联结式;堵孔材料为快硬水泥药卷,规格为长250mm、直径35mm,浸水后送入孔内轻轻捣实,封孔水泥长度不得小于1m;导爆索选用煤矿安全防水抗拉导爆索;雷管选用毫秒延期电雷管;发爆器选用MFB-100型电容式发爆器;起爆方式采用电雷管起爆导爆索,导爆索起爆炸药的起爆方式。每个炮孔均设置有主、副两根导爆索,同一炮孔雷管段号一致;导爆索与炸药串每间隔1m用电工胶布捆绑固定,以防止传爆不良而造成炸药卷拒爆;起爆时,所有人员必须撤离工作面,与超前预爆破地点的安全距离不得小于300m;放炮后经通风30分钟之后,安监人员方可进入检查放炮地点及回采工作面,确认安全后,其他人员才能进入作业地点。
如采用常规的炮泥(黄土)封孔,由于受凝固时间影响,很难保证炸药束不下滑;炮孔内再加上有淋水,就更无法封孔。
关键技术:为防止药卷在孔内自动下滑和炮孔内淋水的影响,采用将炸药在孔口逐个连接好向里推,最后一卷炸药后紧跟快硬水泥药卷,快硬水泥药卷三卷一起用麻绳捆在一起在水里浸水0.5min,连同炸药一起推向眼底;当炸药接触眼底时,轻轻抵住快硬水泥药卷束1~2min,确保炸药束和快硬水泥药卷束不下滑后,轻轻捣实;迅速继续用快硬水泥药卷束封堵,确保封孔水泥长度均不得小于1m。
注意事项:专用堵孔水泥由人工顶推至孔内并捣实;使用专用堵孔水泥卷时应检查水泥卷是否受潮结块,否则不能使用。水泥卷正常浸水时间为1~1.5分钟;用炮棒将专用堵孔水泥卷依照设计长度,人工逐个推入孔内并适当捣实,捣水泥卷时应将导爆索拉直,避免损坏导爆索;堵孔后,专用堵孔水泥卷的凝固时间不应小于30min,凝固后方可连线放炮。
Claims (1)
1.煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构,其特征在于,包括向上倾斜的钻孔内放置的炸药卷,在钻孔的封口位置填充长250mm、直径35mm的快硬水泥药卷,所述快硬水泥药卷中穿过两根独立的导爆索,在所述快硬水泥药卷外部的两根导爆索上分别安装雷管。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201204953U CN202041134U (zh) | 2011-04-22 | 2011-04-22 | 煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201204953U CN202041134U (zh) | 2011-04-22 | 2011-04-22 | 煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202041134U true CN202041134U (zh) | 2011-11-16 |
Family
ID=44968573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201204953U Expired - Fee Related CN202041134U (zh) | 2011-04-22 | 2011-04-22 | 煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202041134U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102538601A (zh) * | 2012-01-11 | 2012-07-04 | 云南文山斗南锰业股份有限公司 | 用于海相沉积矿床的爆破方法 |
CN102704936A (zh) * | 2012-06-13 | 2012-10-03 | 太原理工大学 | 综采工作面端头回采巷道顶板控制垮落法 |
CN106194098A (zh) * | 2016-08-30 | 2016-12-07 | 中国水利水电第六工程局有限公司 | 逆向自行封闭式水压阻水塞装置 |
CN107843162A (zh) * | 2016-09-19 | 2018-03-27 | 中国矿业大学(北京) | 用于深孔爆破的大倾角炮孔封堵逆止装置 |
-
2011
- 2011-04-22 CN CN2011201204953U patent/CN202041134U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102538601A (zh) * | 2012-01-11 | 2012-07-04 | 云南文山斗南锰业股份有限公司 | 用于海相沉积矿床的爆破方法 |
CN102538601B (zh) * | 2012-01-11 | 2015-05-06 | 云南文山斗南锰业股份有限公司 | 用于海相沉积矿床的爆破方法 |
CN102704936A (zh) * | 2012-06-13 | 2012-10-03 | 太原理工大学 | 综采工作面端头回采巷道顶板控制垮落法 |
CN106194098A (zh) * | 2016-08-30 | 2016-12-07 | 中国水利水电第六工程局有限公司 | 逆向自行封闭式水压阻水塞装置 |
CN107843162A (zh) * | 2016-09-19 | 2018-03-27 | 中国矿业大学(北京) | 用于深孔爆破的大倾角炮孔封堵逆止装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204988049U (zh) | 隧道通用组合式聚能装药装置 | |
CN103244124B (zh) | 一种煤矿巷道工作面强制放顶卸压过空巷的方法 | |
CN202041134U (zh) | 煤矿坚硬顶板强制放顶的大倾角含水炮孔封堵结构 | |
CN101876520A (zh) | 大倾角煤层坚硬顶板超前预爆破工艺 | |
CN104457459A (zh) | 一种煤矿顶板深孔断顶装药结构及爆破方法 | |
CN101846484A (zh) | 极硬断层条件下掘进采切巷道的爆破方法 | |
CN114166082B (zh) | 一种隧道超前钻探孔组合精确控制爆破结构及施工工艺 | |
CN105509582B (zh) | 一种长距离倾斜爆破钻孔装药装置及方法 | |
CN103206903A (zh) | 一种坚硬顶板定向承压爆破控制方法 | |
CN203837604U (zh) | 一种井下巷道掘进全断面孔底空气间隔装药机构 | |
CN103411493A (zh) | 一种穿采空区深孔预裂爆破钻孔装药方法 | |
CN109238056B (zh) | 一种用于顶板深孔预裂爆破的装药封孔方法 | |
CN107762511B (zh) | 一种切顶充填临近采空区的类条带式采煤方法 | |
CN106643355B (zh) | 一种深部煤矿巨厚坚硬顶板的强制放顶方法 | |
CN106121644B (zh) | 基于煤岩钻孔平面交联孔网结构的充水承压爆破卸压和支护补强方法 | |
CN215447614U (zh) | 切顶留巷预裂爆破可回拽聚能装药的装置 | |
RU2364828C1 (ru) | Способ формирования комбинированного заряда | |
CN206801542U (zh) | 一种用于毫秒多级定向爆破干冰致裂的爆破管 | |
CN201476709U (zh) | 煤矿瓦斯抽采爆破药柱 | |
CN111473701A (zh) | 一种适于高应力矿体超前聚能致裂爆破的方法 | |
CN109238058A (zh) | 一种基于胀塑性非牛顿流体材料的封孔方法 | |
CN108798670B (zh) | 一种提高特厚煤层综放工作面初采煤炭回收率的方法 | |
CN112483085B (zh) | 基于复合射孔在小煤柱或无煤柱切顶卸压的开采工艺 | |
CN212154765U (zh) | 综采工作面矸区深孔预裂结构 | |
CN108731560B (zh) | 一种高效爆破装置的爆破结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111116 Termination date: 20120422 |