煤矿井下脉动水力压裂设备 Download PDFInfo
- Publication number
- CN202023547U CN202023547U CN2011201339382U CN201120133938U CN202023547U CN 202023547 U CN202023547 U CN 202023547U CN 2011201339382 U CN2011201339382 U CN 2011201339382U CN 201120133938 U CN201120133938 U CN 201120133938U CN 202023547 U CN202023547 U CN 202023547U
- Authority
- CN
- China
- Prior art keywords
- pulsed
- mine
- injection pump
- water
- frequency
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003245 coal Substances 0.000 title claims abstract description 29
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 39
- 230000005540 biological transmission Effects 0.000 claims abstract description 6
- 238000001802 infusion Methods 0.000 claims description 32
- 238000004880 explosion Methods 0.000 claims description 15
- 230000010349 pulsation Effects 0.000 claims description 8
- 238000007789 sealing Methods 0.000 claims description 6
- 238000002347 injection Methods 0.000 abstract description 13
- 239000007924 injection Substances 0.000 abstract description 13
- 238000005065 mining Methods 0.000 abstract description 6
- 230000035699 permeability Effects 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 238000006243 chemical reaction Methods 0.000 abstract 3
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 abstract 2
- 230000000737 periodic effect Effects 0.000 abstract 1
- 238000005086 pumping Methods 0.000 description 5
- 210000000476 body water Anatomy 0.000 description 3
- 230000001276 controlling effect Effects 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000003667 anti-reflective effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Images
Landscapes
- Details Of Reciprocating Pumps (AREA)
Abstract
一种煤矿井下脉动水力压裂设备,适用于高瓦斯低透气性煤层井下水力压裂作业。它由变频设备、脉动注水泵、自动控制水箱、压裂管组成。变频设备通过传动轴连接脉动注水泵,自动控制水箱通过脉动注水泵进水管连接脉动注水泵,脉动注水泵通过脉动注水泵脉动出水管连接钻孔内压裂管。变频设备由矿用隔爆型滤波电抗器、矿用隔爆兼本质安全型交流变频器、矿用防爆变频电机组成。通过调节矿用隔爆兼本质安全型交流变频器频率参数来改变脉动注水泵脉冲水频率,利用高压脉冲水在煤体钻孔内部的周期性变化所产生的脉冲水力效应压裂煤层,达到煤层卸压增透效果。可实现脉动水力压裂脉冲水频率可控、可调。
Description
技术领域
本实用新型涉及煤矿井下脉动水力压裂设备,尤其适用于煤矿井下区域的瓦斯治理。
背景技术
水力压裂是当前煤矿井下区域瓦斯治理主要技术之一。通过对区域煤体实施水力压裂可以增大煤层透气性,提高瓦斯抽采率,释放煤层瓦斯压力,改变煤体性质,从而降低煤与瓦斯突出危险性,达到煤与瓦斯共采的目的。对于高瓦斯、低透气性、单一煤层,目前使用的水力压裂设备常见问题有:煤体注水困难、注水量小、裂隙发育不充分、产生应力集中区、煤层透气性提高不明显,导致钻孔抽采量及抽采浓度低,钻孔抽采衰减速度快,难以达到理想效果。
发明内容
本实用新型的目的是克服已有技术中的不足之处,提供一种煤体注水方便、注水量大、便于瓦斯抽采的煤矿井下脉动水力压裂设备。
本实用新型解决其技术问题所采用的技术方案是:设备主要由矿用隔爆型滤波电抗器、矿用隔爆兼本质安全型交流变频器、矿用防爆变频电机、脉动注水泵、自动控制水箱、插入钻孔密封段内的压裂管构成;矿用隔爆型滤波电抗器与矿用隔爆兼本质安全型交流变频器之间连接有电抗器电缆;矿用隔爆兼本质安全型交流变频器与矿用防爆变频电机之间连接有变频器电缆;矿用防爆变频电机与脉动注水泵经传动轴相连接;脉动注水泵的进水口处连接有插入自动控制水箱中的脉动注水泵进水管;脉动注水泵的出水口处设有与压裂管入口相连的脉动注水泵出水管;所述的脉动注水泵出水管上设有流量控制阀。
有益效果:由于采用了上述技术方案,矿用隔爆型滤波电抗器与矿用隔爆兼本质安全型交流变频器连接,实现了抑制电网波形畸变的功能;通过调节矿用隔爆兼本质安全型交流变频器控制矿用防爆变频电机转速;矿用防爆变频电机连接脉动注水泵,矿用防爆变频电机转速的变化影响脉动注水泵的注水频率,最终实现脉动水力压裂脉冲水频率可控、可调。通过水力压裂设备,调节水力压裂注水频率,实现脉动水力压裂脉冲水频率可控、可调,达到目标煤层整体卸压增透效果。具有操作方便、煤体注水方便、注水量大、便于瓦斯抽采、可控制性强的特点。
附图说明
图1为本实用新型的煤矿井下脉动水力压裂设备结构示意图。
图中:1-矿用隔爆型滤波电抗器,2-矿用隔爆兼本质安全型交流变频器,3-电抗器电缆,4-变频器电缆,5-矿用防爆变频电机,6-传动轴,7-脉动注水泵,8-脉动注水泵进水管,9-自动控制水箱,10-脉动注水泵出水管,11-压裂管,12-钻孔,13-钻孔密封段。
具体实施方式
下面结合附图对本实用新型的一个实施例作进一步的描述:
本实用新型的煤矿井下脉动水力压裂设备主要由矿用隔爆型滤波电抗器1、矿用隔爆兼本质安全型交流变频器2、矿用防爆变频电机5、脉动注水泵7、自动控制水箱9、插入钻孔密封段13内的压裂管11构成;矿用隔爆型滤波电抗器1与矿用隔爆兼本质安全型交流变频器2之间连接有电抗器电缆3;矿用隔爆兼本质安全型交流变频器2与矿用防爆变频电机5之间连接有变频器电缆4;矿用防爆变频电机5与脉动注水泵7经传动轴6相连接;脉动注水泵7的进水口处连接有插入自动控制水箱9中的脉动注水泵进水管8;脉动注水泵7的出水口处设有与压裂管11入口相连的脉动注水泵出水管10,脉动注水泵出水管10上装有流量控制阀。工作时,在煤层钻孔12的孔口处插入压裂管11,按照高压钻孔密封要求完成钻孔密封段13,使压裂管11主体在钻孔12内,压裂管11外露钻孔孔口15cm~30cm。矿用防爆变频电机5通过传动轴6连接脉动注水泵7,自动控制水箱9通过脉动注水泵进水管8连接脉动注水泵7,脉动注水泵出水管10连接钻孔内压裂管11。依次启动矿用隔爆兼本质安全型交流变频器2、矿用防爆变频电机5实施煤层注水至煤层压裂。根据预先设定的参数,可调节矿用隔爆兼本质安全型交流变频器2的输出频率,改变脉动注水泵7的注水频率,即可实现脉动注水泵脉冲频率可控、可调。
Claims (2)
1.一种煤矿井下脉动水力压裂设备,其特征在于:设备主要由矿用隔爆型滤波电抗器(1)、矿用隔爆兼本质安全型交流变频器(2)、矿用防爆变频电机(5)、脉动注水泵(7)、自动控制水箱(9)、插入钻孔密封段(13)内的压裂管(11)构成;矿用隔爆型滤波电抗器(1)与矿用隔爆兼本质安全型交流变频器(2)之间连接有电抗器电缆(3);矿用隔爆兼本质安全型交流变频器(2)与矿用防爆变频电机(5)之间连接有变频器电缆(4);矿用防爆变频电机(5)与脉动注水泵(7)经传动轴(6)相连接;脉动注水泵(7)的进水口处连接有插入自动控制水箱(9)中的脉动注水泵进水管(8);脉动注水泵(7)的出水口处设有与压裂管(11)入口相连的脉动注水泵出水管(10)。
2.根据权利要求1所述的煤矿井下脉动水力压裂设备,其特征在于:所述的脉动注水泵出水管(10)上设有流量控制阀。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201339382U CN202023547U (zh) | 2011-04-29 | 2011-04-29 | 煤矿井下脉动水力压裂设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201339382U CN202023547U (zh) | 2011-04-29 | 2011-04-29 | 煤矿井下脉动水力压裂设备 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202023547U true CN202023547U (zh) | 2011-11-02 |
Family
ID=44848499
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201339382U Expired - Fee Related CN202023547U (zh) | 2011-04-29 | 2011-04-29 | 煤矿井下脉动水力压裂设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202023547U (zh) |
Cited By (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102628352A (zh) * | 2012-04-23 | 2012-08-08 | 中国矿业大学 | 一种多段式定点水力压裂方法 |
CN103726820A (zh) * | 2014-01-20 | 2014-04-16 | 甘孜州康盛地热有限公司 | 一种地热脉冲压力波压裂系统及压裂方法 |
CN103742381A (zh) * | 2013-12-30 | 2014-04-23 | 三一重型能源装备有限公司 | 压裂泵系统及压裂车 |
CN104061014A (zh) * | 2014-07-07 | 2014-09-24 | 太原理工大学 | 一种基于高压电脉冲的煤层增透实验装置 |
CN104594901A (zh) * | 2014-12-08 | 2015-05-06 | 太原理工大学 | 一种工作面通过火成岩侵入区的方法 |
CN104653161A (zh) * | 2015-02-12 | 2015-05-27 | 中国矿业大学(北京) | 煤矿井下脉冲水力割缝-压裂一体化增透抽采装置及方法 |
CN105275443A (zh) * | 2015-11-06 | 2016-01-27 | 中国矿业大学 | 一种煤矿井下高功率电爆震辅助水力压裂增透方法 |
CZ306022B6 (cs) * | 2015-06-23 | 2016-06-22 | Watrad, Spol. S R.O. | Zařízení pro vytvoření hydraulického tlaku a vytvoření hydraulických rázů ve zvodněném prostředí ve vrtech |
CN106523023A (zh) * | 2016-12-28 | 2017-03-22 | 中国矿业大学 | 连续旋转阀脉动水力压裂装置及方法 |
CN106930746A (zh) * | 2017-03-06 | 2017-07-07 | 中国矿业大学 | 钻孔丙酮侵袭与水力压裂相结合的交替式煤层增透方法 |
CN108343378A (zh) * | 2018-01-29 | 2018-07-31 | 中国矿业大学 | 一种电脉冲辅助机械钻进的煤层快速钻孔方法 |
CN108678747A (zh) * | 2018-04-28 | 2018-10-19 | 中国矿业大学 | 一种脉冲水力致裂控制顶煤冒放性的方法及设备 |
CN108915659A (zh) * | 2018-07-27 | 2018-11-30 | 长江大学 | 一种低频水力脉冲压裂工具 |
CN109707353A (zh) * | 2018-12-03 | 2019-05-03 | 中国石油集团川庆钻探工程有限公司 | 井下水力脉动s3酸解堵增注实验装置及方法 |
CN109707354A (zh) * | 2018-12-03 | 2019-05-03 | 中国石油集团川庆钻探工程有限公司 | 井下水力脉动纳米降压增注实验装置及方法 |
US10337308B2 (en) | 2012-11-16 | 2019-07-02 | U.S. Well Services, Inc. | System for pumping hydraulic fracturing fluid using electric pumps |
CN110080725A (zh) * | 2019-06-05 | 2019-08-02 | 东北石油大学 | 煤层脉动压裂最优施工频率确定方法 |
US10407990B2 (en) | 2012-11-16 | 2019-09-10 | U.S. Well Services, LLC | Slide out pump stand for hydraulic fracturing equipment |
US10408030B2 (en) | 2012-11-16 | 2019-09-10 | U.S. Well Services, LLC | Electric powered pump down |
US10408031B2 (en) | 2017-10-13 | 2019-09-10 | U.S. Well Services, LLC | Automated fracturing system and method |
CN110219615A (zh) * | 2019-05-31 | 2019-09-10 | 山东科技大学 | 一种煤层脉动注水钻孔密封装置及封孔方法 |
CN110644964A (zh) * | 2019-10-25 | 2020-01-03 | 北京天地玛珂电液控制系统有限公司 | 一种变频水力压裂系统及其压力调节方法 |
US10526882B2 (en) | 2012-11-16 | 2020-01-07 | U.S. Well Services, LLC | Modular remote power generation and transmission for hydraulic fracturing system |
US10598258B2 (en) | 2017-12-05 | 2020-03-24 | U.S. Well Services, LLC | Multi-plunger pumps and associated drive systems |
US10648311B2 (en) | 2017-12-05 | 2020-05-12 | U.S. Well Services, LLC | High horsepower pumping configuration for an electric hydraulic fracturing system |
US10655435B2 (en) | 2017-10-25 | 2020-05-19 | U.S. Well Services, LLC | Smart fracturing system and method |
US10686301B2 (en) | 2012-11-16 | 2020-06-16 | U.S. Well Services, LLC | Switchgear load sharing for oil field equipment |
US10731561B2 (en) | 2012-11-16 | 2020-08-04 | U.S. Well Services, LLC | Turbine chilling for oil field power generation |
US10927802B2 (en) | 2012-11-16 | 2021-02-23 | U.S. Well Services, LLC | System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources |
CN112412425A (zh) * | 2020-11-19 | 2021-02-26 | 中国矿业大学 | 一种电脉冲预制裂缝定向水力压裂一体化的方法 |
US10934824B2 (en) | 2012-11-16 | 2021-03-02 | U.S. Well Services, LLC | System for reducing vibrations in a pressure pumping fleet |
US10947829B2 (en) | 2012-11-16 | 2021-03-16 | U.S. Well Services, LLC | Cable management of electric powered hydraulic fracturing pump unit |
US11035207B2 (en) | 2018-04-16 | 2021-06-15 | U.S. Well Services, LLC | Hybrid hydraulic fracturing fleet |
US11067481B2 (en) | 2017-10-05 | 2021-07-20 | U.S. Well Services, LLC | Instrumented fracturing slurry flow system and method |
US11066912B2 (en) | 2012-11-16 | 2021-07-20 | U.S. Well Services, LLC | Torsional coupling for electric hydraulic fracturing fluid pumps |
US11091992B2 (en) | 2012-11-16 | 2021-08-17 | U.S. Well Services, LLC | System for centralized monitoring and control of electric powered hydraulic fracturing fleet |
US11114857B2 (en) | 2018-02-05 | 2021-09-07 | U.S. Well Services, LLC | Microgrid electrical load management |
US11181107B2 (en) | 2016-12-02 | 2021-11-23 | U.S. Well Services, LLC | Constant voltage power distribution system for use with an electric hydraulic fracturing system |
US11181879B2 (en) | 2012-11-16 | 2021-11-23 | U.S. Well Services, LLC | Monitoring and control of proppant storage from a datavan |
US11449018B2 (en) | 2012-11-16 | 2022-09-20 | U.S. Well Services, LLC | System and method for parallel power and blackout protection for electric powered hydraulic fracturing |
US11476781B2 (en) | 2012-11-16 | 2022-10-18 | U.S. Well Services, LLC | Wireline power supply during electric powered fracturing operations |
US11850563B2 (en) | 2012-11-16 | 2023-12-26 | U.S. Well Services, LLC | Independent control of auger and hopper assembly in electric blender system |
US11959371B2 (en) | 2012-11-16 | 2024-04-16 | Us Well Services, Llc | Suction and discharge lines for a dual hydraulic fracturing unit |
-
2011
- 2011-04-29 CN CN2011201339382U patent/CN202023547U/zh not_active Expired - Fee Related
Cited By (54)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102628352B (zh) * | 2012-04-23 | 2014-07-16 | 中国矿业大学 | 一种多段式定点水力压裂方法 |
CN102628352A (zh) * | 2012-04-23 | 2012-08-08 | 中国矿业大学 | 一种多段式定点水力压裂方法 |
US10337308B2 (en) | 2012-11-16 | 2019-07-02 | U.S. Well Services, Inc. | System for pumping hydraulic fracturing fluid using electric pumps |
US10526882B2 (en) | 2012-11-16 | 2020-01-07 | U.S. Well Services, LLC | Modular remote power generation and transmission for hydraulic fracturing system |
US11476781B2 (en) | 2012-11-16 | 2022-10-18 | U.S. Well Services, LLC | Wireline power supply during electric powered fracturing operations |
US10731561B2 (en) | 2012-11-16 | 2020-08-04 | U.S. Well Services, LLC | Turbine chilling for oil field power generation |
US10927802B2 (en) | 2012-11-16 | 2021-02-23 | U.S. Well Services, LLC | System for fueling electric powered hydraulic fracturing equipment with multiple fuel sources |
US10408030B2 (en) | 2012-11-16 | 2019-09-10 | U.S. Well Services, LLC | Electric powered pump down |
US10407990B2 (en) | 2012-11-16 | 2019-09-10 | U.S. Well Services, LLC | Slide out pump stand for hydraulic fracturing equipment |
US11449018B2 (en) | 2012-11-16 | 2022-09-20 | U.S. Well Services, LLC | System and method for parallel power and blackout protection for electric powered hydraulic fracturing |
US11959371B2 (en) | 2012-11-16 | 2024-04-16 | Us Well Services, Llc | Suction and discharge lines for a dual hydraulic fracturing unit |
US11850563B2 (en) | 2012-11-16 | 2023-12-26 | U.S. Well Services, LLC | Independent control of auger and hopper assembly in electric blender system |
US10947829B2 (en) | 2012-11-16 | 2021-03-16 | U.S. Well Services, LLC | Cable management of electric powered hydraulic fracturing pump unit |
US11066912B2 (en) | 2012-11-16 | 2021-07-20 | U.S. Well Services, LLC | Torsional coupling for electric hydraulic fracturing fluid pumps |
US11091992B2 (en) | 2012-11-16 | 2021-08-17 | U.S. Well Services, LLC | System for centralized monitoring and control of electric powered hydraulic fracturing fleet |
US10686301B2 (en) | 2012-11-16 | 2020-06-16 | U.S. Well Services, LLC | Switchgear load sharing for oil field equipment |
US10934824B2 (en) | 2012-11-16 | 2021-03-02 | U.S. Well Services, LLC | System for reducing vibrations in a pressure pumping fleet |
US11181879B2 (en) | 2012-11-16 | 2021-11-23 | U.S. Well Services, LLC | Monitoring and control of proppant storage from a datavan |
CN103742381A (zh) * | 2013-12-30 | 2014-04-23 | 三一重型能源装备有限公司 | 压裂泵系统及压裂车 |
CN103726820A (zh) * | 2014-01-20 | 2014-04-16 | 甘孜州康盛地热有限公司 | 一种地热脉冲压力波压裂系统及压裂方法 |
CN104061014A (zh) * | 2014-07-07 | 2014-09-24 | 太原理工大学 | 一种基于高压电脉冲的煤层增透实验装置 |
CN104061014B (zh) * | 2014-07-07 | 2016-03-02 | 太原理工大学 | 一种基于高压电脉冲的煤层增透实验装置 |
CN104594901A (zh) * | 2014-12-08 | 2015-05-06 | 太原理工大学 | 一种工作面通过火成岩侵入区的方法 |
CN104653161B (zh) * | 2015-02-12 | 2018-04-06 | 中国矿业大学(北京) | 煤矿井下脉冲水力割缝‑压裂一体化增透抽采装置及方法 |
CN104653161A (zh) * | 2015-02-12 | 2015-05-27 | 中国矿业大学(北京) | 煤矿井下脉冲水力割缝-压裂一体化增透抽采装置及方法 |
CZ306022B6 (cs) * | 2015-06-23 | 2016-06-22 | Watrad, Spol. S R.O. | Zařízení pro vytvoření hydraulického tlaku a vytvoření hydraulických rázů ve zvodněném prostředí ve vrtech |
CN105275443A (zh) * | 2015-11-06 | 2016-01-27 | 中国矿业大学 | 一种煤矿井下高功率电爆震辅助水力压裂增透方法 |
CN105275443B (zh) * | 2015-11-06 | 2018-10-19 | 中国矿业大学 | 一种煤矿井下高功率电爆震辅助水力压裂增透方法 |
US11181107B2 (en) | 2016-12-02 | 2021-11-23 | U.S. Well Services, LLC | Constant voltage power distribution system for use with an electric hydraulic fracturing system |
CN106523023B (zh) * | 2016-12-28 | 2018-07-27 | 中国矿业大学 | 连续旋转阀脉动水力压裂装置及方法 |
CN106523023A (zh) * | 2016-12-28 | 2017-03-22 | 中国矿业大学 | 连续旋转阀脉动水力压裂装置及方法 |
CN106930746A (zh) * | 2017-03-06 | 2017-07-07 | 中国矿业大学 | 钻孔丙酮侵袭与水力压裂相结合的交替式煤层增透方法 |
CN106930746B (zh) * | 2017-03-06 | 2019-06-04 | 中国矿业大学 | 钻孔丙酮侵袭与水力压裂相结合的交替式煤层增透方法 |
US11067481B2 (en) | 2017-10-05 | 2021-07-20 | U.S. Well Services, LLC | Instrumented fracturing slurry flow system and method |
US10408031B2 (en) | 2017-10-13 | 2019-09-10 | U.S. Well Services, LLC | Automated fracturing system and method |
US10655435B2 (en) | 2017-10-25 | 2020-05-19 | U.S. Well Services, LLC | Smart fracturing system and method |
US10598258B2 (en) | 2017-12-05 | 2020-03-24 | U.S. Well Services, LLC | Multi-plunger pumps and associated drive systems |
US11959533B2 (en) | 2017-12-05 | 2024-04-16 | U.S. Well Services Holdings, Llc | Multi-plunger pumps and associated drive systems |
US10648311B2 (en) | 2017-12-05 | 2020-05-12 | U.S. Well Services, LLC | High horsepower pumping configuration for an electric hydraulic fracturing system |
CN108343378B (zh) * | 2018-01-29 | 2019-09-03 | 中国矿业大学 | 一种电脉冲辅助机械钻进的煤层快速钻孔方法 |
CN108343378A (zh) * | 2018-01-29 | 2018-07-31 | 中国矿业大学 | 一种电脉冲辅助机械钻进的煤层快速钻孔方法 |
US11114857B2 (en) | 2018-02-05 | 2021-09-07 | U.S. Well Services, LLC | Microgrid electrical load management |
US11035207B2 (en) | 2018-04-16 | 2021-06-15 | U.S. Well Services, LLC | Hybrid hydraulic fracturing fleet |
CN108678747A (zh) * | 2018-04-28 | 2018-10-19 | 中国矿业大学 | 一种脉冲水力致裂控制顶煤冒放性的方法及设备 |
CN108915659A (zh) * | 2018-07-27 | 2018-11-30 | 长江大学 | 一种低频水力脉冲压裂工具 |
CN108915659B (zh) * | 2018-07-27 | 2020-07-28 | 长江大学 | 一种低频水力脉冲压裂工具 |
CN109707353A (zh) * | 2018-12-03 | 2019-05-03 | 中国石油集团川庆钻探工程有限公司 | 井下水力脉动s3酸解堵增注实验装置及方法 |
CN109707354A (zh) * | 2018-12-03 | 2019-05-03 | 中国石油集团川庆钻探工程有限公司 | 井下水力脉动纳米降压增注实验装置及方法 |
CN110219615A (zh) * | 2019-05-31 | 2019-09-10 | 山东科技大学 | 一种煤层脉动注水钻孔密封装置及封孔方法 |
CN110219615B (zh) * | 2019-05-31 | 2021-11-05 | 山东科技大学 | 一种煤层脉动注水钻孔密封装置及封孔方法 |
CN110080725A (zh) * | 2019-06-05 | 2019-08-02 | 东北石油大学 | 煤层脉动压裂最优施工频率确定方法 |
CN110644964B (zh) * | 2019-10-25 | 2021-11-19 | 北京天地玛珂电液控制系统有限公司 | 一种变频水力压裂系统及其压力调节方法 |
CN110644964A (zh) * | 2019-10-25 | 2020-01-03 | 北京天地玛珂电液控制系统有限公司 | 一种变频水力压裂系统及其压力调节方法 |
CN112412425A (zh) * | 2020-11-19 | 2021-02-26 | 中国矿业大学 | 一种电脉冲预制裂缝定向水力压裂一体化的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202023547U (zh) | 煤矿井下脉动水力压裂设备 | |
CN111088993B (zh) | 一种深部低渗透高瓦斯煤层钻-割-封-压钻孔设备及方法 | |
CN105909228B (zh) | 脉冲高压水力割缝-压裂装置及方法 | |
CN104653161B (zh) | 煤矿井下脉冲水力割缝‑压裂一体化增透抽采装置及方法 | |
CN103541710B (zh) | 煤矿井下气液两相交替相驱压裂煤体强化瓦斯抽采方法 | |
CN201517406U (zh) | 一种三通道封闭式煤层气井气举系统 | |
CN101539028B (zh) | 高压脉动注水防治煤岩动力灾害的装置 | |
CN103306657B (zh) | 一种煤层割缝卸压增透和缝槽保持装置及方法 | |
CN102839954A (zh) | 一种用压力脉冲实现分层配水的方法 | |
CN105507940A (zh) | 一种割封压一体化强化瓦斯抽采装置及方法 | |
CN102400667A (zh) | 海底天然气水合物气举开采方法及装置 | |
CN203420679U (zh) | 一种深井、超深井大排量复合举升系统 | |
CN201407065Y (zh) | 高压脉动注水防治煤岩动力灾害的装置 | |
CN205955715U (zh) | 脉冲高压水力割缝‑压裂装置 | |
CN201574908U (zh) | 智能式控制矿井乳化液泵站系统 | |
CN210888869U (zh) | 水淹闭式水气分离系统 | |
CN202381396U (zh) | 潜油电泵放气型可调式油嘴 | |
CN204098886U (zh) | 采油井加药增压装置 | |
CN204532295U (zh) | 一种接替压气采油装置 | |
CN209115148U (zh) | 一种煤矿水力压裂用割缝装置 | |
CN204062016U (zh) | 一种牵引式地下水抽水回灌手动两用阀 | |
CN104234133B (zh) | 智能型地下水抽取及回灌装置 | |
CN203412625U (zh) | 一种煤矿井下排水设备 | |
CN202370522U (zh) | 海底天然气水合物电喷泵组合开采装置 | |
CN202926214U (zh) | 一种高压旋喷分段扩孔钻头 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |