CN202022675U - Double-layer vertically-crossed steel beam arrangement structure of internal climbing tower crane - Google Patents

Double-layer vertically-crossed steel beam arrangement structure of internal climbing tower crane Download PDF

Info

Publication number
CN202022675U
CN202022675U CN2011201216861U CN201120121686U CN202022675U CN 202022675 U CN202022675 U CN 202022675U CN 2011201216861 U CN2011201216861 U CN 2011201216861U CN 201120121686 U CN201120121686 U CN 201120121686U CN 202022675 U CN202022675 U CN 202022675U
Authority
CN
China
Prior art keywords
beams
double
arrangement structure
support beam
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201216861U
Other languages
Chinese (zh)
Inventor
傅志明
阳勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI PANGYUAN MACHINERY RENTAL CO Ltd
Original Assignee
SHANGHAI PANGYUAN CONSTRUCTION MACHINERY LEASING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI PANGYUAN CONSTRUCTION MACHINERY LEASING CO Ltd filed Critical SHANGHAI PANGYUAN CONSTRUCTION MACHINERY LEASING CO Ltd
Priority to CN2011201216861U priority Critical patent/CN202022675U/en
Application granted granted Critical
Publication of CN202022675U publication Critical patent/CN202022675U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a double-layer vertically-crossed steel beam arrangement structure of an internally climbing tower crane. The steel beam arrangement structure is characterized in that an upper support beam is arranged on the ends of the upper parts of two parallel bottom support beams near to the same side respectively; the two upper support beams are parallel and are distributed horizontally; two short internal climbing beams (the upper support beams) which are vertically fixed with internal climbing steel beams (the bottom support beams) in the horizontal direction are added on the basis of the existing internal climbing steel beams (the bottom support beams), and the two short internal climbing beams are fixed through bolts; by the principle that four points make up a surface, the probability of the occurrence of deflecting is reduced in the tower crane lifting process, the steel beams can be in position quickly when being turned over and lifted, the preparation time before the climbing is short, the construction period is saved, the construction cost is reduced, and the steel beam arrangement structure has very good practicality, is easy to promote and apply,has prominent substantial characteristics and makes obvious progress.

Description

The girder steel arrangement structure of the double-deck square crossing of a kind of internal-climbing tower crane
Technical field
The utility model relates to the technical field of mechanical execution, the girder steel arrangement structure of the double-deck square crossing of a kind of specifically internal-climbing tower crane, particularly its mechanical connecting structure.
Background technology
Climb the every cover of girder steel in the climbing tower crane and have two usually, in climb frame and be fixed on the girder steel, the arrangement of climbing girder steel in this kind is before tower crane climbs as not trim arranged slightly, tower crane just produces deviation along the girder steel direction easily in the process of climbing, as finding not or untimely correction that the squareness of tower crane just may exceed standard, increase the resistance that climbs, tower crane not only can be offset in the process of climbing when serious, and can produce reversing of certain angle, and later climbing will be more and more difficult.
Summary of the invention
The purpose of this utility model is to provide the girder steel arrangement structure of the double-deck square crossing of a kind of internal-climbing tower crane, its set up on original double bracing beam top two with it level to vertical upper support beam, utilize become the face principle to guarantee that tower crane deviation can not take place in the process of climbing, overcome the shortcoming and defect that exists in the prior art at 4.
To achieve these goals, the technical solution of the utility model is: the girder steel arrangement structure of the double-deck square crossing of a kind of internal-climbing tower crane, it comprise at least two be parallel to each other and level to the end support beam that distributes, captive joint with body of wall by steel ox pin in the two ends of end support beam, it is characterized in that: described two support beam tops, the end that are parallel to each other are provided with a upper support beam respectively near the place, end of the same side, two upper support beams be parallel to each other and level to distribution, two upper support beams are vertical configuration in the horizontal direction with two foundation support beams and captive joint, the two ends of described upper support beam lay respectively at two end support beams that are parallel to each other near the place, end, climb frame in two upper support beam tops that are parallel to each other are provided with.
The utility model discloses the girder steel arrangement structure of the double-deck square crossing of a kind of internal-climbing tower crane, its in existing, climb increased on the basis of girder steel (end support beam) two with it level in the weak point of vertical fixing, climb beam (upper support beam), and fix by bolt, utilize become the face principle at 4, reduced the possibility that deflection appears in the tower crane process of climbing, it is fast that girder steel turns over the speed that rises when in place, setup time before climbing is short, saved the construction period, reduced construction cost, have good practicability, be easy to apply, have outstanding substantive distinguishing features and marked improvement.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the utility model planar structure scheme drawing.
The specific embodiment
With reference to the accompanying drawings, the utility model further is described.
The utility model is the girder steel arrangement structure of the double-deck square crossing of a kind of internal-climbing tower crane, as shown in fig. 1, it mainly comprise at least two be parallel to each other and level to the end support beam 1 that distributes, captive joint with body of wall 3 by steel ox pin 2 in the two ends of end support beam 1, it is different from prior art and is: described two end support beam 1 tops that are parallel to each other are provided with a upper support beam 4 respectively near the place, end of the same side, two upper support beams 4 be parallel to each other and level to distribution, two upper support beams 4 are vertical configuration in the horizontal direction with two foundation support beams 1 and captive joint, the two ends of described upper support beam 4 lay respectively at two end support beams that are parallel to each other 1 near the place, end, climb frame 5 in two upper support beam 4 tops that are parallel to each other are provided with.
In the specific implementation, adopt the bolt mode to be connected between described upper support beam 4 and the support beam of the described end 1, bolt 6 places are provided with double nuts.
In the specific implementation, described upper support beam 4 with in climb between the frame 5 and to adopt the bolt mode to be connected, bolt 6 places are provided with double nuts.
In the specific implementation, support beam 1 bottom, the described end is connected by the bolt mode with steel ox pin 2 one sides, and bolt 6 places are provided with double nuts.
In the specific implementation, the built-in fitting in described steel ox pin 2 opposite sides and the body of wall 37 is captiveed joint by welding manner.
Above content be in conjunction with concrete preferred implementation to further describing that the utility model patent is done, can not assert that the utility model patent is concrete to implement to be confined to above-mentioned these explanations.For the utility model person of an ordinary skill in the technical field, under the prerequisite that does not break away from the design of the utility model patent, can also make some simple deduction or replace, all should be considered as belonging to protection domain of the present utility model.

Claims (5)

1. the girder steel arrangement structure of the double-deck square crossing of an internal-climbing tower crane, it comprise at least two be parallel to each other and level to the end support beam (1) that distributes, captive joint with body of wall (3) by steel ox pin (2) in the two ends of end support beam (1), it is characterized in that: described two end support beam (1) tops that are parallel to each other are provided with a upper support beam (4) respectively near the place, end of the same side, two upper support beams (4) be parallel to each other and level to distribution, two upper support beams (4) are vertical configuration in the horizontal direction with two foundation support beams (1) and captive joint, the two ends of described upper support beam (4) lay respectively at two end support beams (1) that are parallel to each other near the place, end, climb frame (5) in two upper support beam (4) tops that are parallel to each other are provided with.
2. the girder steel arrangement structure of the double-deck square crossing of a kind of internal-climbing tower crane according to claim 1 is characterized in that: employing bolt mode is connected between described upper support beam (4) and the support beam of the described end (1), and bolt (6) locates to be provided with double nuts.
3. the girder steel arrangement structure of the double-deck square crossing of a kind of internal-climbing tower crane according to claim 1 is characterized in that: described upper support beam (4) with in climb that employing bolt mode is connected between the frame (5), bolt (6) locates to be provided with double nuts.
4. the girder steel arrangement structure of the double-deck square crossing of a kind of internal-climbing tower crane according to claim 1, it is characterized in that: support beam of the described end (1) bottom is connected by the bolt mode with steel ox pin (2) one sides, and bolt (6) locates to be provided with double nuts.
5. the girder steel arrangement structure of the double-deck square crossing of a kind of internal-climbing tower crane according to claim 1 is characterized in that: described steel ox pin (2) opposite side is captiveed joint by welding manner with the built-in fitting (7) in the body of wall (3).
CN2011201216861U 2011-04-22 2011-04-22 Double-layer vertically-crossed steel beam arrangement structure of internal climbing tower crane Expired - Lifetime CN202022675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201216861U CN202022675U (en) 2011-04-22 2011-04-22 Double-layer vertically-crossed steel beam arrangement structure of internal climbing tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201216861U CN202022675U (en) 2011-04-22 2011-04-22 Double-layer vertically-crossed steel beam arrangement structure of internal climbing tower crane

Publications (1)

Publication Number Publication Date
CN202022675U true CN202022675U (en) 2011-11-02

Family

ID=44847635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201216861U Expired - Lifetime CN202022675U (en) 2011-04-22 2011-04-22 Double-layer vertically-crossed steel beam arrangement structure of internal climbing tower crane

Country Status (1)

Country Link
CN (1) CN202022675U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642784A (en) * 2012-04-28 2012-08-22 上海建工集团股份有限公司 Support structure of internal-climbing tower crane
CN102745602A (en) * 2011-04-22 2012-10-24 上海庞源机械租赁股份有限公司 Double-layer vertically-crossed steel beam arrangement structure of internally climbing tower crane
WO2018196451A1 (en) * 2017-04-28 2018-11-01 中国建筑股份有限公司 Non-closed tower crane climbing frame device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102745602A (en) * 2011-04-22 2012-10-24 上海庞源机械租赁股份有限公司 Double-layer vertically-crossed steel beam arrangement structure of internally climbing tower crane
CN102745602B (en) * 2011-04-22 2015-03-25 上海庞源机械租赁股份有限公司 Double-layer vertically-crossed steel beam arrangement structure of internally climbing tower crane
CN102642784A (en) * 2012-04-28 2012-08-22 上海建工集团股份有限公司 Support structure of internal-climbing tower crane
WO2018196451A1 (en) * 2017-04-28 2018-11-01 中国建筑股份有限公司 Non-closed tower crane climbing frame device

Similar Documents

Publication Publication Date Title
CN202022675U (en) Double-layer vertically-crossed steel beam arrangement structure of internal climbing tower crane
CN203559354U (en) Stay cable anchoring structure applied to prestressed concrete partially cable-stayed bridge
CN103469735B (en) The mounting method of curve ultrahigh hollow column plate type pier top solid section template
CN202850027U (en) Reverse building method pile foundation construction steel column location verticality adjustment device
CN102745602B (en) Double-layer vertically-crossed steel beam arrangement structure of internally climbing tower crane
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN204343318U (en) A kind of novel pillar crane steel platform base
CN204342306U (en) A kind of novel roofing crane foundation
CN202023202U (en) Base for tower crane in water
CN202706508U (en) Overhanging strength bearing steel beam construction member of scaffold
CN205296966U (en) Transmission line iron tower
CN203821939U (en) Round tower foot plate for +/- 800kV ultra high voltage direct current line
CN202249004U (en) Improved steel structure plant structure
CN206693030U (en) A kind of compound section steel box girder for high-speed railway
CN203546601U (en) Steel truss assembling support
CN203420359U (en) Rigid connection joint connected through beam columns and capable of bearing overlarge loads in steel structure support system
CN105162033A (en) Mechanized self-lifting portal crossing frame
CN202689585U (en) Ground fitting up assembly mould of large steel truss
CN203256614U (en) Large-span bent cap lower-bearing type Bailey frame formwork device
CN205531410U (en) A simply can dismantle construction canopy for steel construction job site
CN203361165U (en) Supporting beam connection structure for building foundation pit support
CN205575420U (en) Support beam structure
CN204454362U (en) Tower crane attachment supporting seat
CN203997411U (en) The marine double-layered transporting bracket of heavy wind tower
CN216474538U (en) A combination formula staple bolt for pier stud bent cap construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Room sixth, No. 1838 A District Huaxin Town Qingpu District Shanghai City Huateng road 201708 -120

Patentee after: SHANGHAI PANGYUAN MACHINERY RENTAL CO., LTD.

Address before: Room sixth, No. 1838 A District Huaxin Town Qingpu District Shanghai City Huateng road 201708 -120

Patentee before: Shanghai Pangyuan Machinery Rental Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20111102