CN202018764U - 10kV outgoing feeder secondary circuit simulator - Google Patents

10kV outgoing feeder secondary circuit simulator Download PDF

Info

Publication number
CN202018764U
CN202018764U CN2010205550293U CN201020555029U CN202018764U CN 202018764 U CN202018764 U CN 202018764U CN 2010205550293 U CN2010205550293 U CN 2010205550293U CN 201020555029 U CN201020555029 U CN 201020555029U CN 202018764 U CN202018764 U CN 202018764U
Authority
CN
China
Prior art keywords
relay
secondary circuit
rectifier bridge
outgoing feeder
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205550293U
Other languages
Chinese (zh)
Inventor
赵义明
刘明明
王玉霞
吴磊
王芹
孟照兵
王东起
Original Assignee
赵义明
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 赵义明 filed Critical 赵义明
Priority to CN2010205550293U priority Critical patent/CN202018764U/en
Application granted granted Critical
Publication of CN202018764U publication Critical patent/CN202018764U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

The utility model relates to a 10kV outgoing feeder secondary circuit simulator in the field of electrical major practice teaching. The technical scheme includes that the 10kV outgoing feeder secondary circuit simulator mainly comprises a box and an electrical component, the electrical component is disposed in the box and comprises a 220V alternating-current power source and a 220V direct-current power source, two power terminals are connected in parallel, a rectifier bridge is arranged on a circuit of the alternating-current power source, a plurality of demonstration circuits are connected in parallel to an output circuit of the rectifier bridge through a power fuse, and each demonstration circuit is connected with the electrical element corresponding to the same so as to simulate different control functions of a secondary circuit. The 10kV outgoing feeder secondary circuit simulator is simple in structural principle, reliable in action, easy to learn, durable, low in manufacturing cost, and capable of simulating various action processes of 10kV outgoing feeder secondary circuits and allowing for training of relay protection fixed-value test, fault simulation, relay debugging and the like, and has signal indications completely the same as those of an actual operation site, such as sound, light and the like.

Description

10kV outgoing secondary circuit simulator
One, technical field:
The utility model relates to the high pressure outgoing secondary circuit emulation experiment device in a kind of electric specialty student teaching field, particularly relates to the 10kV outgoing secondary circuit simulator of the functions such as course of action, accident alarming of protections such as a kind of tripping operation of adopting signal imitation 10kV outgoing secondary circuits such as sound, light, combined floodgate, instantaneous over-current.
Two, background technology:
At present, domestic all kinds of electric power professional universities and colleges is in carrying out transformer station's high pressure outgoing secondary circuit problem teaching, what mainly carry out is telling about of Specialized Theory aspect, seldom have ready conditions and carry out on the spot field practice, practise even have ready conditions, also because transformer station's high pressure outgoing secondary circuit equipment stube cable is many, reasons such as wiring complexity, can't move the various control operation functions of the high pressure outgoing secondary circuit of on-the-spot actual motion to classroom, more can't in the laboratory, carry out the simulated maneuver of exercises process between high pressure outgoing secondary circuit and the isolating switch.Domestic some power equipment manufacturer is in product introduction, carry out the analog machine of transformer station's high pressure outgoing secondary circuit course of action, what use mostly is to adopt industrial computer, technology manufacturings such as single-chip microcomputer form, its inner structure complexity, the principle profundity, program is loaded down with trivial details, poor anti jamming capability, and the high difficulty of repairing of cost, by retrieval, do not see on the domestic electric power professional teaching teaching aid market that a kind of principle is arranged is simple, with low cost, and antijamming capability is strong, and transformer station's high pressure outgoing secondary circuit simulator is easily repaired in debugging, does not also find this series products on the market.
Three, summary of the invention:
The purpose of this utility model is exactly the above-mentioned defective that exists at prior art, provide a kind of theory structure simple, cheap, can simulate exercises process between transformer station's high pressure outgoing secondary circuit and the 10KV outgoing secondary circuit simulator of indicating with signals such as the on-the-spot identical sound of actual motion, light is arranged.
Its technical scheme is: mainly be made up of casing and electric component, electric component is arranged in the casing, electric component comprises: two power supplys are 220V AC power and 220V direct supply, two power supply terminal parallel connections, on the circuit of AC power, be provided with rectifier bridge, on the output loop of rectifier bridge through power safety and be connected to a plurality of illustrative circuitry; Described illustrative circuitry is to be connected to auxiliary reclay through power safety on the output loop of rectifier bridge, hummer, and be connected to multiple switching relay by each contact of gauge tap, jump position relay, signal relay, after-acceleration relay, anti-trip relay, the time relay, auxiliary reclay, tripping relay, closing relay, quick-break current relay, overcurrent relay, export a plurality of external circuits terminals.
The beneficial effects of the utility model are: its structural principle is simple; reliable in action; Yi Xue is durable; low cost of manufacture; can simulate the exercises process between the 10kV outgoing secondary circuit and can carry out the real training of projects such as relay protection constant value test, fault simulation, relay debugging, and the emulation experiment device of indicating with signals such as the on-the-spot identical sound of actual motion, light is arranged.
Four, description of drawings:
Accompanying drawing 1 is a structural representation of the present utility model;
Among the last figure: the KK-gauge tap, ZCH-multiple switching relay, TWJ-are jumped the position relay, XJ, 1XJ, the 2XJ-signal relay, JSJ-after-acceleration relay, TBJ-anti-trip relay, the 1SJ-time relay, ZJ, 1ZJ, the 2ZJ-auxiliary reclay, the TJ-tripping relay, the HJ-closing relay, 1LJ, 2LJ-quick-break current relay, 3LJ, the 4LJ-overcurrent relay, QP, 1LP, 2LP-connects pressing plate, the red pilot lamp of HD-, the green pilot lamp of LD-, FM-hummer, 1RD, the 2RD-power safety, 2,4,21,22,24,5,8,11,10,9,12,14,15,16,13,6,7,1,3,19, the connection terminal of 17-gauge tap KK.
Five, embodiment:
In conjunction with the accompanying drawings 1, the utility model will be further described:
The utility model mainly is made up of casing and electric component, electric component is arranged in the casing, electric component comprises: two power supplys are 220V AC power and 220V direct supply, two power supply terminal parallel connections, on the circuit of AC power, be provided with rectifier bridge, on the output loop of rectifier bridge through power safety and be connected to a plurality of illustrative circuitry; Each illustrative circuitry is connected to corresponding with it each electrical equipment respectively, with the different control function of simulation secondary circuit.
Illustrative circuitry is to be connected to auxiliary reclay through power safety on the output loop of rectifier bridge, hummer, be connected to multiple switching relay by each contact of gauge tap, jump position relay, signal relay, after-acceleration relay, anti-trip relay, the time relay, auxiliary reclay, tripping relay, closing relay, quick-break current relay, overcurrent relay, export a plurality of external circuits terminals;
Principle of work is: after the device energising, closing relay HJ coil constitutes series loop with a jumping position relay TWJ coil by auxiliary reclay 1ZJ normally closed contact, because the jumping position relay TWJ coil resistance that adopts is big in design, its coil pressure drop is also big, jump position relay TWJ adhesive this moment and closing relay HJ pressure drop is little, do not reach its minimum movements magnitude of voltage and be in not attracting state.Jump relay TWJ action back, position its normal opened contact TWJ1 closure and connect green pilot lamp LD loop by KK contact 11,10, at this moment, green pilot lamp azarin pilot lamp does not work, and simulates state behind circuit breaker trip.
When device prepared combined floodgate, gauge tap KK11,10 contacts disconnected, and 9,10 contacts are connected, and flashing power source 100 is connected green pilot lamp LD loop, so green pilot lamp begins flash of light.
When device mimic-disconnecting switch closing by hand, KK5,8 connects, and the 220V rated voltage is added on the closing relay HJ coil, and closing relay HJ moves its contact HJ 1Closure starts auxiliary reclay 1ZJ, wherein a pair of normal opened contact 1ZJ after the auxiliary reclay 1ZJ action 3Play the self-sustaining effect, a pair of normally closed contact 1ZJ 1Disconnected the loop of closing relay HJ coil and green pilot lamp LD, another is to normal opened contact 1ZJ 2Connect the wire loop of tripping relay TJ, the coil of tripping relay TJ and red pilot lamp constitute the loop by KK16,13 contacts, because the dividing potential drop effect of red pilot lamp HD resistance makes tripping relay TJ be in not operating state, at this moment, the bright green pilot lamp of red pilot lamp goes out, device has been finished the simulation "on" position, is in the back state that closes a floodgate.Close a floodgate back KK21,22 contacts of device connects, and "+KM " power supply is given the capacitor C in the H multiple switching relay charging by the charging resistor 4R in KK21,22 contacts and the multiple switching relay ZCH, through 15-25 after second capacitor C can be full of.
When device prepares tripping operation, KK16,13 contacts disconnect, 13,14 contacts are connected, flashing power source 100 is connected red pilot lamp HD loop, so red pilot lamp begins flash of light, simultaneously, KK2,4 contacts are connected, make the discharge resistance 6R in the multiple switching relay ZCH constitute the shunt circuit with capacitor C, capacitor C moment discharges to 6R, so multiple switching relay ZCH is failure to actuate when having guaranteed with gauge tap KK hand trip(ping).
When device mimic-disconnecting switch hand trip(ping), KK6,7 connects, and rated voltage is added on the tripping relay TJ coil, and tripping relay TJ moves its normally closed contact TJ 1Disconnected the wire loop of auxiliary reclay 1ZJ, auxiliary reclay 1ZJ returns its normal opened contact 1ZJ 2, 1ZJ 3Disconnect normally closed contact 1ZJ 1Closure, so tripping relay TJ returns, green pilot lamp azarin pilot lamp goes out, device has been finished the simulation tripped condition, has got back to the virgin state after the tripping operation again.
When the action of device simulation transient fault fast tripping protection; artificial short circuit quick-break current relay 1LJ or 2LJ any docking point wherein; then "+KM " power supply is by 2XJ signal relay coil; 3LP connects pressing plate; intermediate relay ZJ exit relay coil constitutes the loop with " KM " power supply; so intermediate relay ZJ exit relay action; its normal opened contact ZJ1 is closed to cause No. 33 line trip(ping) circuits with "+KM " power supply; constitute loop starting tripping relay TJ by the 1ZJ2 contact; in full accord when tripping relay TJ course of action such as above-mentioned device mimic-disconnecting switch hand trip(ping), its normally closed contact TJ 1Disconnected the wire loop of auxiliary reclay 1ZJ, auxiliary reclay 1ZJ returns its normal opened contact 1ZJ 2, 1ZJ 3Disconnect normally closed 1ZJ 1Closed; tripping relay TJ returns; jump position relay TWJ adhesive; green pilot lamp azarin pilot lamp goes out; another contact TWJ2 is also closed after the jumping position relay TWJ adhesive meanwhile causes multiple switching relay ZCH terminal 7 with " KM " power supply; because KK its contact 21 of state behind combined floodgate before this; 22 have caused multiple switching relay terminal 8 at on-state "+KM " power supply; so starting of the time relay sj in the multiple switching relay ZCH; its contact SJ1 closure after certain time-delay; make capacitor C to the little intermediate relay ZJ coil discharge in the multiple switching relay; little intermediate relay ZJ starting back its series connection normal opened contact ZJ1; ZJ3 simultaneously closed and with electric current self-sustaining coil; signal relay XJ; connect pressing plate QP; the TBJ normally closed contact; 1ZJ1; closing relay HJ coil constitutes the loop; so closing relay HJ starts adhesive; closing relay HJ action back as above-mentioned device are simulated manual making process unanimity; so far device has been finished simulation transient fault fast tripping protection would trip, the course of action of reclosing successful reclosing.
When device simulation permanent fault overcurrent protection action; artificial short circuit overcurrent relay 3LJ or 4LJ any docking point wherein; then "+KM " power supply is by 3LJ or 4LJ normal opened contact starting overcurrent time relay 1SJ; the 1SJ action is after its contact of certain time-delay 1SJ1 closure; "+KM " power supply is by 1XJ signal relay coil; 2LP connects pressing plate; intermediate relay ZJ exit relay coil constitutes the loop with " KM " power supply; so above-mentioned tripping operation process is finished in the action of intermediate relay ZJ exit relay; the reclosing process is finished in the multiple switching relay starting of tripping operation back; but moment after reclosing is finished again combined floodgate; because the normal opened contact that is permanent fault overcurrent relay 3LJ or 4LJ will be closed once more; time relay 1SJ starts once more; this moment, the instantaneous contact 1SJ2 of 1SJ need not wait until before the time-delay contact 1SJ1 closure closed already; by multiple switching relay terminal 4 "+KM " power supply is caused after-acceleration relay J SJ wire loop and inner little auxiliary reclay contact ZJ4 is closed when reclosing closes a floodgate again before this; the contact JSJ3 that is connected on the instantaneous contact 1SJ2 of overcurrent time relay loop after the starting of after-acceleration relay is the instantaneous closure of energising; the normal opened contact that the outage time-delay disconnects; this moment the consistent closure state that is in; so "+KM " power supply passes through 1SJ2; 1LP connects pressing plate; intermediate relay ZJ exit relay coil constitutes the loop with " KM " power supply; the tripping operation process is finished in the action of intermediate relay ZJ exit relay once more; tripping operation back multiple switching relay inner capacitor C is because the too short lowest starting voltage that does not reach little intermediate relay ZJ of duration of charging; therefore although the time relay starts but little intermediate relay ZJ can not started once more in multiple switching relay this moment; device just can not carry out the reclosing second time yet; so far finished the course of action that simulation permanent fault overcurrent protection action reclosing unsuccessful reclosing quickens tripping operation; on the other hand because KK1; 3; 19; 17; contact is closed behind combined floodgate, and this moment is through tripping relay TJ normal opened contact TJ 2Connected the wire loop of auxiliary reclay 2ZJ, auxiliary reclay 2ZJ action back normal opened contact 2ZJ 1Connected FM hummer loop, then device give spoken, visual alarm, after manually the gauge tap handle being got to tripping operation back state, KK1,3,19,17, the contact disconnection, hummer just returns.
The user can simulate all kinds of course of action and search according to the various trouble spots of the artificial simulation of actual conditions each different circuit in said apparatus, reaches the purpose of practice-training teaching.

Claims (1)

1. 10KV outgoing secondary circuit simulator, it is characterized in that: mainly form by casing and electric component, electric component is arranged in the casing, electric component comprises 220V AC power and 220V direct supply, two power supply terminal parallel connections, on the circuit of AC power, be provided with rectifier bridge, on the output loop of rectifier bridge through power safety and be connected to a plurality of illustrative circuitry; Described illustrative circuitry is to be connected to auxiliary reclay through power safety on the output loop of rectifier bridge, hummer, and be connected to multiple switching relay by each contact of gauge tap, jump a position relay, signal relay, after-acceleration relay, anti-trip relay, the time relay, auxiliary reclay, tripping relay, closing relay, quick-break current relay, overcurrent relay.
CN2010205550293U 2010-09-29 2010-09-29 10kV outgoing feeder secondary circuit simulator Expired - Fee Related CN202018764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205550293U CN202018764U (en) 2010-09-29 2010-09-29 10kV outgoing feeder secondary circuit simulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205550293U CN202018764U (en) 2010-09-29 2010-09-29 10kV outgoing feeder secondary circuit simulator

Publications (1)

Publication Number Publication Date
CN202018764U true CN202018764U (en) 2011-10-26

Family

ID=44812432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205550293U Expired - Fee Related CN202018764U (en) 2010-09-29 2010-09-29 10kV outgoing feeder secondary circuit simulator

Country Status (1)

Country Link
CN (1) CN202018764U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103066553A (en) * 2013-01-12 2013-04-24 辽宁省电力有限公司鞍山供电公司 Portable quiescent temporary protecting device and application method
CN103683224A (en) * 2013-11-12 2014-03-26 国家电网公司 Protective device for trip acceleration of common-tower lines
CN104967438A (en) * 2015-06-30 2015-10-07 中国电子科技集团公司第二十四研究所 Current type fuse control circuit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103066553A (en) * 2013-01-12 2013-04-24 辽宁省电力有限公司鞍山供电公司 Portable quiescent temporary protecting device and application method
CN103683224A (en) * 2013-11-12 2014-03-26 国家电网公司 Protective device for trip acceleration of common-tower lines
CN104967438A (en) * 2015-06-30 2015-10-07 中国电子科技集团公司第二十四研究所 Current type fuse control circuit
CN104967438B (en) * 2015-06-30 2017-10-24 中国电子科技集团公司第二十四研究所 A kind of current mode fuse controls circuit

Similar Documents

Publication Publication Date Title
CN109887368B (en) Medium-voltage switch cabinet simulation training platform and logic judgment method of programmable logic controller of medium-voltage switch cabinet simulation training platform
CN103501000B (en) Comprehensive experiment platform device of low-voltage power distribution control system
CN102436773B (en) Analog circuit breaker
CN102928186B (en) Testing method for vibration performance of electronic transducer
CN202018764U (en) 10kV outgoing feeder secondary circuit simulator
CN211826183U (en) Novel simple simulation circuit breaker
CN107356830B (en) Simulation transformer training device
CN202332019U (en) Simulation circuit breaker
CN107202928B (en) Automatic switching-on device analog circuit breaker of standby power supply
CN203849376U (en) Breaker anti-tripping loop testing apparatus
CN113223384A (en) Relay protection and secondary circuit simulation training platform
CN201311721Y (en) Signal detection system of simulation safety early-warning operation button in pipeline substation
CN209947134U (en) Simulation training platform for secondary control loop of medium-voltage switch cabinet
CN204719205U (en) Isolating switch time-parameters test simulator
CN201166934Y (en) Control demonstration machine for circuit breakers
CN203966415U (en) Middle-and-high-ranking low pressure maintenance electrician training checking device
CN115951138A (en) Automatic standby power supply switching device and uninterrupted power supply verification method of outlet loop of automatic standby power supply switching device
CN103077644B (en) Split-phase breaker hydraulic operation mechanism training device
CN207036982U (en) A kind of automatic throw-in equipment of emergency power supply mimic-disconnecting switch
CN113990132B (en) Power transformation and distribution operation and maintenance integrated training system and training method
CN214897192U (en) Relay protection and secondary circuit simulation training platform
CN204229714U (en) A kind of experimental facilities of small electrical system
CN209894928U (en) Device for simulating 10kV high-voltage vacuum permanent magnet circuit breaker
CN101807354B (en) Simulation operation safety early warning method and system of long-distance pipeline substation
CN101807355A (en) Pipeline electric power substation simulate operation safety precaution operation button signal detection method and system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111026

Termination date: 20120929