CN202016716U - Automatic backflow apparatus for pre-treatment hanger - Google Patents

Automatic backflow apparatus for pre-treatment hanger Download PDF

Info

Publication number
CN202016716U
CN202016716U CN2011200481268U CN201120048126U CN202016716U CN 202016716 U CN202016716 U CN 202016716U CN 2011200481268 U CN2011200481268 U CN 2011200481268U CN 201120048126 U CN201120048126 U CN 201120048126U CN 202016716 U CN202016716 U CN 202016716U
Authority
CN
China
Prior art keywords
hanger
support
elevator
guide rail
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200481268U
Other languages
Chinese (zh)
Inventor
段胜国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU LIUSH MACHINERY EQUIPMENT CO Ltd
Original Assignee
SUZHOU LIUSH MACHINERY EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU LIUSH MACHINERY EQUIPMENT CO Ltd filed Critical SUZHOU LIUSH MACHINERY EQUIPMENT CO Ltd
Priority to CN2011200481268U priority Critical patent/CN202016716U/en
Application granted granted Critical
Publication of CN202016716U publication Critical patent/CN202016716U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an automatic backflow apparatus for pre-treatment hanger, comprising a crane, a crane support for hanging the crane, a hanger, a hanger support for suspending the hanger and a control device, wherein the hanger is capable of sliding along the hanger support with the traction of the crane, the hanger support is provided with a member inlet end and a member outlet end, the member inlet end is provided with an inlet member lifting device, the member outlet end is provided with an outlet member lifting device, the crane support is provided with a guide rail on the top, and the hanger, the member inlet lifting device, the hanger support, the member outlet lifting device and the guide rail form a hanger constitution cycle. A pre-treatment hanger is automatically transferred from the pre-treatment member outlet end to the member inlet end by utilizing the power lifting devices and the guide rail, the guide rail locates at the top of the crane support, the whole device is compact in structure, thus greatly simplifying the operation program of the crane, reducing the returning time of an empty hanger, and reducing the number of cranes; in addition, the PLC control system is used for controlling, so the whole system operates more stably.

Description

The automatic recycling device of pre-processing hanger
Technical field
The utility model relates to the pre-processing manufacture field, particularly relates to the automatic recycling device of a kind of pre-processing hanger.
Background technology
At present, all need to use trailer coupling for pre-treating technology such as spray, impregnating, trailer coupling mainly comprises driving, driving support, hanger, hanger support and control setup etc., and workpiece is finished various technologies by the traction of driving and carried out under the clamping of hanger.
In the prior art, hanger can only slidably reciprocate along the length direction of hanger support: advancing the part end, after workpiece enters, be affiliated on hanger, hanger moves at the traction lower edge hanger support of driving, and workpiece then carries out pre-treating technology; After workpiece is finished pre-processing, break away from going out part end and hanger, then hanger need be got back to once more into the part end and carry out next operation, need this moment etc. idle driving with hanger to rear haulage.But when driving is busy, hanger then needs to wait for, has a strong impact on work efficiency, and is higher to the requirement of control setup; Then will certainly improve productive costs if increase the quantity of driving.
Summary of the invention
The utility model provides a kind of pre-processing hanger automatic recycling device.
For achieving the above object, the technical solution adopted in the utility model is:
The automatic recycling device of a kind of pre-processing hanger, comprise driving, the driving support that is used for suspension crane, hanger, be used to hang the hanger support and the control setup of hanger, described hanger can slide by described hanger support in the traction lower edge of described driving, described hanger support has into the part end and goes out the part end, describedly go into the part end and be provided with into the part jacking system, describedly go out the part end and be provided with out the part jacking system, described driving is propped up top of the trellis and is provided with guide rail, and described hanger is gone into the part jacking system by described, the hanger support, go out part jacking system and guide rail and form the circulation of hanger formation.
Preferably, described go into the part jacking system include the part elevator, with described go into that the part elevator is connected go into part cylinder line and with described go into that part cylinder line is connected go into the part elevator of plugging into, described hanger from described guide rail successively by describedly going into the part elevator, go into part cylinder line, going into the part elevator of plugging into and enter described hanger support.
Preferably, described go out the part jacking system comprise the part elevator, with described go out that the part elevator is connected go out part cylinder line and with described go out that part cylinder line is connected go out the part elevator of plugging into, described hanger from described hanger support successively by described go out part plug into elevator, go out part cylinder line, go out the part elevator and enter described guide rail.
Preferably, described control setup is the PLC control setup.
Because the technique scheme utilization, the utility model compared with prior art has following advantage:
The utility model adopts power lift and guide rail that the pre-processing hanger is gone out the part end from pre-processing and transfers to automatically into the part end, guide rail is positioned at the top of handling the driving support, whole apparatus structure compactness, simplified the program of driving operation greatly, occupation space when having reduced empty hanger and returning has reduced the quantity of driving; In addition, adopt the control of PLC control system, make the total system operation more stable.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model;
Accompanying drawing 2 is an A place enlarged drawing in the accompanying drawing 1.
Wherein: 1, driving; 2, driving support; 3, hanger; 4, hanger support; 5, guide rail; 6, go into the part elevator; 7, go into part cylinder line; 8, go into the part elevator of plugging into; 9, go out the part elevator; 10, go out part cylinder line; 11, go out the part elevator of plugging into; 12, workpiece.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further described:
The automatic recycling device of a kind of pre-processing hanger as shown in Figure 1, 2, comprise driving 1, be used for suspension crane 1 driving support 3, hanger 3, be used to hang the hanger support 4 and the PLC control setup of hanger 3.Hanger support 4 have be used for workpiece 12 input go into the part end, be used for workpiece 12 outputs go out the part end, be provided with into the part jacking system going into the part end, go out the part end and be provided with out the part jacking system, the be expert at top of kickstand 2 is provided with guide rail 5, and goes into part jacking system, hanger support 4, goes out the part jacking system and guide rail 5 is formed the circulating system that hangers constitute hangers.
In the present embodiment: go into the part jacking system include part elevator 6, with go into that part elevator 6 is connected go into part cylinder line 7 and with go into that part cylinder line 7 is connected go into the part elevator 8 of plugging into; Go out the part jacking system comprise part elevator 9, with go out that part elevator 9 is connected go out part cylinder line 10 and with go out that part cylinder line 10 is connected go out the part elevator 11 of plugging into.Driving 1, go into the part jacking system, the work that goes out the part jacking system is by the unified control of PLC control setup.
Below the concrete method of operation of present embodiment down of setting forth:
At first, workpiece 12 is affiliated on hanger 3 at the part end place of going into of hanger support 4,3 of hangers are positioned at 1 traction of driving on its top, and along hanger support 4 slide to hanger support 4 go out the part end, workpiece 12 can spray at this segment distance, the impregnating pre-treating technology;
Subsequently, after hanger 3 and workpiece 12 break away from, go out part plug into elevator 11 the traction under rise to certain height after, with with go out the part part cylinder line 10 that goes out that elevator 11 is connected of plugging into and move a segment distance, rise to guide rail 5 places at driving support 1 top again by the traction that goes out part elevator 9, finally move to into part elevator 6 along guide rail 5;
At last, hanger 3 is after decline certain height under the traction of going into part elevator 6, with with go into the part cylinder line 7 of going into that part elevator 6 is connected and move a segment distance, again by go into part plug into drop to hanger support 4 under the traction of elevator 8 again go into the part end, finish the one action circulation of hanger 3, wait for work next time.
The foregoing description only is explanation technical conceive of the present utility model and characteristics, and its purpose is to allow the personage who is familiar with this technology can understand content of the present utility model and enforcement according to this, can not limit protection domain of the present utility model with this.All equivalences of being done according to the utility model spirit change or modify, and all should be encompassed within the protection domain of the present utility model.

Claims (4)

1. automatic recycling device of pre-processing hanger, comprise driving, the driving support that is used for suspension crane, hanger, be used to hang the hanger support and the control setup of hanger, described hanger can slide by described hanger support in the traction lower edge of described driving, it is characterized in that: described hanger support has into the part end and goes out the part end, describedly go into the part end and be provided with into the part jacking system, describedly go out the part end and be provided with out the part jacking system, described driving is propped up top of the trellis and is provided with guide rail, and described hanger is gone into the part jacking system by described, the hanger support, go out part jacking system and guide rail and form the circulation of hanger formation.
2. the automatic recycling device of pre-processing hanger according to claim 1, it is characterized in that: described go into the part jacking system include the part elevator, with described go into that the part elevator is connected go into part cylinder line and with described go into that part cylinder line is connected go into the part elevator of plugging into, described hanger from described guide rail successively by describedly going into the part elevator, go into part cylinder line, going into the part elevator of plugging into and enter described hanger support.
3. the automatic recycling device of pre-processing hanger according to claim 1, it is characterized in that: described go out the part jacking system comprise the part elevator, with described go out that the part elevator is connected go out part cylinder line and with described go out that part cylinder line is connected go out the part elevator of plugging into, described hanger from described hanger support successively by described go out part plug into elevator, go out part cylinder line, go out the part elevator and enter described guide rail.
4. the automatic recycling device of pre-processing hanger according to claim 1 is characterized in that: described control setup is the PLC control setup.
CN2011200481268U 2011-02-25 2011-02-25 Automatic backflow apparatus for pre-treatment hanger Expired - Fee Related CN202016716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200481268U CN202016716U (en) 2011-02-25 2011-02-25 Automatic backflow apparatus for pre-treatment hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200481268U CN202016716U (en) 2011-02-25 2011-02-25 Automatic backflow apparatus for pre-treatment hanger

Publications (1)

Publication Number Publication Date
CN202016716U true CN202016716U (en) 2011-10-26

Family

ID=44810391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200481268U Expired - Fee Related CN202016716U (en) 2011-02-25 2011-02-25 Automatic backflow apparatus for pre-treatment hanger

Country Status (1)

Country Link
CN (1) CN202016716U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102649505A (en) * 2011-02-25 2012-08-29 苏州柳溪机电工程有限公司 Automatic reflow device of pretreatment hanger

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102649505A (en) * 2011-02-25 2012-08-29 苏州柳溪机电工程有限公司 Automatic reflow device of pretreatment hanger
CN102649505B (en) * 2011-02-25 2014-01-22 苏州柳溪机电工程有限公司 Automatic reflow device of pretreatment hanger

Similar Documents

Publication Publication Date Title
CN202016716U (en) Automatic backflow apparatus for pre-treatment hanger
CN202401774U (en) Simple bogie for hoisting unit-type curtain wall plate block
CN201567162U (en) Electromagnet plate loading crane
CN202574660U (en) Device for encasing wall-hanging stove
CN103277104B (en) Hanging equipment and method in sinking platform well
CN203308466U (en) In-well hanging equipment of sinking platform
CN205225102U (en) Automatic workover machine of skid -mounted formula
CN201501739U (en) Self-clamping type horizontal cross coil steel hanging tong
CN201411334Y (en) Simple traveling crane
CN102649505B (en) Automatic reflow device of pretreatment hanger
CN103523648B (en) A kind of slush pump mounting suspension of drilling mud system
CN203640332U (en) Lifting railing for stages
CN104384821A (en) Mounting and elevating method for deep-well pump of liquefied natural gas storage tank
CN201950205U (en) Hydraulic zinc-ingot stripper
CN201292675Y (en) Ribbon board installation apparatus
CN204483582U (en) A kind of can the bed of one-sided lifting
CN203998724U (en) A kind of tower machine attached wall assembling and disassembling stand
CN203821855U (en) Novel telescopic elevating platform with special steel structural inner barrel
CN203655155U (en) Anchor pole drilling machine
CN201200965Y (en) Spray finishing jig
CN201881509U (en) Automatic two-step foaming production line
CN202575751U (en) Portal crane
CN204823980U (en) Internal hoisting device of jar
CN203547112U (en) Electric hoist installation structure for attached lifting scaffold
CN203097758U (en) Oil rod layer board of oil pipe lifting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111026

Termination date: 20140225