CN202009212U - 输电线路地线换位系统 - Google Patents

输电线路地线换位系统 Download PDF

Info

Publication number
CN202009212U
CN202009212U CN2010206576411U CN201020657641U CN202009212U CN 202009212 U CN202009212 U CN 202009212U CN 2010206576411 U CN2010206576411 U CN 2010206576411U CN 201020657641 U CN201020657641 U CN 201020657641U CN 202009212 U CN202009212 U CN 202009212U
Authority
CN
China
Prior art keywords
ground wire
optical fiber
fiber composite
composite overhead
transposition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206576411U
Other languages
English (en)
Inventor
刘玉孝
曹志民
唐明贵
安巍
李轶
潘少成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hennan Electric Power Survey and Design Institute
Original Assignee
Hennan Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hennan Electric Power Survey and Design Institute filed Critical Hennan Electric Power Survey and Design Institute
Priority to CN2010206576411U priority Critical patent/CN202009212U/zh
Application granted granted Critical
Publication of CN202009212U publication Critical patent/CN202009212U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Communication Cables (AREA)

Abstract

一种输电线路地线换位系统,它包括杆塔,在杆塔上架设有普通地线和光纤复合架空地线,所述的普通地线分别由每段连接而成,光纤复合架空地线分别由每段接续而成;所述的普通地线和光纤复合架空地线间隔换位设置在杆塔的两侧;且在整条输电线路中,普通地线和光纤复合架空地线之间至少存在一个换位点。采用上述技术方案的本实用新型,将换位点设置在隔段光纤复合架空地线的端点,30年寿命周期内的地线损耗仅有7500万元;将换位点设置在每段光纤复合架空地线的中点,30年寿命周期内的地线损耗仅有7200万元,可见与常规地线布置方式相比,地线换位布置方式节能效果明显。

Description

输电线路地线换位系统
技术领域
本实用新型涉及一种高压/特高压交流输电线路中的地线系统,具体地说涉及一种降低输电损耗、且地线在杆塔上可以交换位置的杆塔与地线连接系统。
背景技术
输电线路正常运行工况下,导线周围的电磁场会在地线上产生感应电压。如果地线形成环路,地线中就会有感应电流流过,造成电能损耗。
目前,高压/特高压交流输电线路一般采用双地线,一根为普通地线,一根为OPGW光缆,常规地线布置方式有两种,方式一是普通地线和光缆均逐塔接地,如图1所示;方式二是普通地线分段绝缘,光缆逐塔接地,如图2所示。
方式一的两根地线之间、每根地线与大地之间均构成回路,地线能耗很大,方式二仅光缆与大地之间构成回路,地线能耗有所降低。经估算,在30年的寿命周期内,方式一损失的电能达190亿度,折合电费57亿元(0.3元/度),方式二损失的电能达59亿度,折合电费17.7亿元(0.3元/度)。由于特高压线路输送容量很大,采用常规地线布置方式能耗巨大,因此研究节能的地线布置方式是必要的。
方式二中普通地线采取分段绝缘方式,正常工况下无法构成回路,感应电流很小,普通地线上基本没有损耗,但OPGW仍然和大地构成回路,地线能耗主要由OPGW中的感应电流产生,因此限制光缆中的感应电流大小是地线节能的关键。
发明内容
本实用新型的目的是提供一种节能效果好的输电线路地线换位系统。
为实现上述目的,本实用新型采用以下技术方案:
本实用新型包括杆塔,在杆塔上架设有普通地线和光纤复合架空地线,所述的普通地线分别由每段连接而成,光纤复合架空地线分别由每段接续而成;所述的普通地线和光纤复合架空地线间隔换位设置在杆塔的两侧;且在整条输电线路中,普通地线和光纤复合架空地线之间至少存在一个换位点。
所述的换位点设置在隔段光纤复合架空地线的端点。
所述的换位点设置在每段光纤复合架空地线的中点。
采用上述技术方案的本实用新型,将换位点设置在隔段光纤复合架空地线的端点,30年寿命周期内的地线损耗仅有7500万元;将换位点设置在每段光纤复合架空地线的中点,30年寿命周期内的地线损耗仅有7200万元,可见与常规地线布置方式相比,地线换位布置方式节能效果明显。
虽然将换位点设置在每段光纤复合架空地线的中点与设置在隔段光纤复合架空地线的端点的节能效果基本相同,但隔段设置换位点的换位次数比每段设置换位点的次数少一半,施工方法更简单。
附图说明
图1为普通地线和光缆均逐塔接地的连接示意图。
图2为普通地线分段绝缘,光缆逐塔接地的连接示意图。
图3为本实用新型光纤复合架空地线在端点换位的连接示意图。
图4为本实用新型光纤复合架空地线在中点换位的连接示意图。
图5为光纤复合架空地线在端点换位的换位次数示意图。
图6为光纤复合架空地线在中点换位的换位次数示意图。
具体实施方式
本实用新型包括杆塔1,在杆塔1上架设有普通地线2和光纤复合架空地线3,上述的普通地线2和光纤复合架空地线3分别由每段接续而成。且普通地线2和光纤复合架空地线3间隔换位设置在杆塔1的两侧;在整条输电线路中,普通地线2和光纤复合架空地线3至少换位一次。
实施例1
如图3所示,本实施例中,换位点设置在隔段光纤复合架空地线3的端点,两段光纤复合架空地线3换位一次,即:在第一、第二段光纤复合架空地线3之间设置换位点,第三段光纤复合架空地线3与第二段光纤复合架空地线3接续连接,第三段光纤复合架空地线3与第四段光纤复合架空地线3之间设置换位点。
这种方式可简述为普通地线2分段绝缘、一点接地;每段光纤复合架空地线OPGW一端接地、接续,其余部分绝缘,另一端接续、换位。
实施例2
如图4所示,本实施例中,换位点设置在每段光纤复合架空地线3的中点。
如图5、图6所示,实施例1和实施例2的主要区别在于地线的换位次数不同,实施例1的换位次数比方式四的换位次数少一半。假设光缆每段长度均为5km,实施例1在一段光缆的一端换位,两段光缆换位一次,而实施例2在每段光缆的中点换位,一段光缆换位一次。
换位次数对地线节能效果影响很小,实施例1可通过接续光缆长度的方法将换位次数降的更低,但换位次数越少,换位循环长度越长,换位点处地线上的电位也越高,对绝缘设备的要求也越高。另外换位次数过少,会导致地线的接地点太少,不利于地线的防雷功能。

Claims (3)

1.一种输电线路地线换位系统,它包括杆塔(1),在杆塔(1)上架设有普通地线(2)和光纤复合架空地线(3),所述的普通地线(2)分别由每段连接而成,光纤复合架空地线(3)分别由每段接续而成;其特征在于:所述的普通地线(2)和光纤复合架空地线(3)间隔换位设置在杆塔(1)的两侧;且在整条输电线路中,普通地线(2)和光纤复合架空地线(3)之间至少存在一个换位点。
2.根据权利要求1所述的输电线路地线换位系统,其特征在于:所述的换位点设置在隔段光纤复合架空地线(3)的端点。
3.根据权利要求1所述的输电线路地线换位系统,其特征在于:所述的换位点设置在每段光纤复合架空地线(3)的中点。
CN2010206576411U 2010-12-14 2010-12-14 输电线路地线换位系统 Expired - Fee Related CN202009212U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206576411U CN202009212U (zh) 2010-12-14 2010-12-14 输电线路地线换位系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206576411U CN202009212U (zh) 2010-12-14 2010-12-14 输电线路地线换位系统

Publications (1)

Publication Number Publication Date
CN202009212U true CN202009212U (zh) 2011-10-12

Family

ID=44750869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206576411U Expired - Fee Related CN202009212U (zh) 2010-12-14 2010-12-14 输电线路地线换位系统

Country Status (1)

Country Link
CN (1) CN202009212U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102684105A (zh) * 2012-04-23 2012-09-19 中国电力科学研究院 一种光纤复合架空地线和普通地线匹配的设计方法
CN102780176A (zh) * 2012-07-06 2012-11-14 广东电网公司电力科学研究院 一种降低交流输电线路绝缘架空地线感应电压的方法
CN103078313A (zh) * 2012-11-14 2013-05-01 陕西省电力公司规划评审中心 一种抑制750kV并行单回架设线路感应电压和电流的方法
CN105102090A (zh) * 2014-03-19 2015-11-25 大原电机株式会社 利用架空地线和特高压中性线的兼用线的具有特高压中性线和低压中性线的分离设置结构的配电线路的施工方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102684105A (zh) * 2012-04-23 2012-09-19 中国电力科学研究院 一种光纤复合架空地线和普通地线匹配的设计方法
CN102684105B (zh) * 2012-04-23 2014-01-15 中国电力科学研究院 一种光纤复合架空地线和普通分流地线匹配的设计方法
CN102780176A (zh) * 2012-07-06 2012-11-14 广东电网公司电力科学研究院 一种降低交流输电线路绝缘架空地线感应电压的方法
CN102780176B (zh) * 2012-07-06 2015-03-18 广东电网公司电力科学研究院 一种降低交流输电线路绝缘架空地线感应电压的方法
CN103078313A (zh) * 2012-11-14 2013-05-01 陕西省电力公司规划评审中心 一种抑制750kV并行单回架设线路感应电压和电流的方法
CN103078313B (zh) * 2012-11-14 2015-04-29 陕西省电力公司规划评审中心 一种抑制750kV并行单回架设线路感应电压和电流的方法
CN105102090A (zh) * 2014-03-19 2015-11-25 大原电机株式会社 利用架空地线和特高压中性线的兼用线的具有特高压中性线和低压中性线的分离设置结构的配电线路的施工方法
CN105102090B (zh) * 2014-03-19 2017-04-12 大原电机株式会社 利用架空地线和特高压中性线的兼用线的具有特高压中性线和低压中性线的分离设置结构的配电线路的施工方法

Similar Documents

Publication Publication Date Title
CN202134257U (zh) 碳纤维复合芯光电复合架空导线
CN202013446U (zh) 一种500kV线路OPGW光缆绝缘余缆架
CN202009212U (zh) 输电线路地线换位系统
CN201430401Y (zh) 一种杆塔地线换位连接系统
CN201910287U (zh) 基于光电分离复合架空相线
CN204117676U (zh) 一种风力发电用耐扭曲电力电缆
CN205845556U (zh) 一种海上风力发电电缆
CN202549438U (zh) 一种高温高压潜油电力电缆
CN203644462U (zh) 一种中压风能电缆
CN203588740U (zh) 一种智能碳纤维复合电缆芯架空导线
CN201430402Y (zh) 一种杆塔地线连接系统
CN201387745Y (zh) 风能电缆
CN101425666B (zh) 一种同相序同塔同窗双回路输电线路
CN205722873U (zh) 高载流柔软充电桩电缆
CN201278274Y (zh) 耐磨架空电缆
CN203480871U (zh) 耐低温集束石油软电缆
CN202333698U (zh) 一种杆塔地线连接系统
CN203250583U (zh) 一种耐扭曲型风力发电用电缆
CN203260370U (zh) 一种节能环保架空光电导线
CN203242419U (zh) 自承式数字通信电缆
CN203351288U (zh) 一种光纤复合型风能电缆
CN105006280A (zh) 一种多芯中压风力发电用耐扭曲橡套软电缆
CN202275610U (zh) 耐恶劣气候环境光伏系统连接用电缆
CN215342023U (zh) 一种智能交通地感线圈线
CN201788749U (zh) 抗冰雪用梯形型线同心绞架空导线

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111012

Termination date: 20161214