CN202003827U - 铁芯窗口双头顶杆 - Google Patents

铁芯窗口双头顶杆 Download PDF

Info

Publication number
CN202003827U
CN202003827U CN2011200449192U CN201120044919U CN202003827U CN 202003827 U CN202003827 U CN 202003827U CN 2011200449192 U CN2011200449192 U CN 2011200449192U CN 201120044919 U CN201120044919 U CN 201120044919U CN 202003827 U CN202003827 U CN 202003827U
Authority
CN
China
Prior art keywords
handle
core window
iron
sides
dual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200449192U
Other languages
English (en)
Inventor
邵杨
花虹
褚晓东
钮秀荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wujiang Transformer Co Ltd
Original Assignee
Wujiang Transformer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wujiang Transformer Co Ltd filed Critical Wujiang Transformer Co Ltd
Priority to CN2011200449192U priority Critical patent/CN202003827U/zh
Application granted granted Critical
Publication of CN202003827U publication Critical patent/CN202003827U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Iron Core Of Rotating Electric Machines (AREA)

Abstract

本实用新型涉及一种铁芯窗口双头顶杆,适用于大型铁芯不叠上轭的情况。一种铁芯窗口双头顶杆,具有手柄,所述手柄两侧设有管套,所述管套内设有螺杆,所述螺杆的端头裸露在管套外,所述螺杆的端头两侧设有固定板,所述两固定板的上部横安装有一尼龙垫板,所述管套未与手柄接触端上固定有一螺套,所述螺杆贯穿于该螺套。本装置简单的结构,简单的设计,简单的操作,操作方便,保证两边硅钢片与中间硅钢片的间距,使整个大型铁芯(不叠上轭)保持相对稳定。达到了很好的效果,保证了质量。

Description

铁芯窗口双头顶杆
技术领域
本实用新型涉及一种铁芯窗口双头顶杆,适用于大型铁芯不叠上轭的情况。
背景技术
变压器生产工序中,每一个步骤都是重要环节之一,而叠片又是重中之重,相当与人体的心脏,不仅影响着变压器的最终质量,也是接下来套装等一系列工序的基础,影响到其他步骤的进行。在此特别强调大型铁芯(不叠上轭的)。由于开始不叠上轭,叠完后将其竖起定会造成两边硅钢片和中间硅钢片的位置偏差,影响上轭插片及套装过程,最重要是影响了质量。
发明内容
本实用新型的目的在于提供一种铁芯窗口双头顶杆,其结构简单,操作方便,保证两边硅钢片与中间硅钢片的间距,使整个大型铁芯(不叠上轭)保持相对稳定。
本实用新型解决其技术问题所采用的技术方案是:一种铁芯窗口双头顶杆,具有手柄,所述手柄两侧设有管套,所述管套内设有螺杆,所述螺杆的端头裸露在管套外,所述螺杆的端头两侧设有固定板,所述两固定板的上部横安装有一尼龙垫板,所述管套未与手柄接触端上固定有一螺套,所述螺杆贯穿于该螺套。
进一步的:所述固定板与尼龙垫板之间通过内六角柱头螺钉固定。
为了能在固定铁芯过程中,操作简单快捷,进一步的:所述两螺杆为左右旋,对应的螺套同样为左右旋。
本装置简单的结构,简单的设计,简单的操作,操作方便,保证两边硅钢片与中间硅钢片的间距,使整个大型铁芯(不叠上轭)保持相对稳定。达到了很好的效果,保证了质量。
附图说明
图1为本实用新型的结构示意图。
图2为本实用新型的手柄、管套、螺杆的结构图。
图中:1、手柄;2、管套;3、螺杆;4、固定板;5、尼龙垫板;6、螺套;7、内六角柱头螺钉。
具体实施方式
如图1~2所示的一种铁芯窗口双头顶杆,具有手柄1,所述手柄1两侧设有管套2,所述管套2内设有螺杆3,所述螺杆3的端头裸露在管套2外,所述螺杆3的端头两侧设有固定板4,所述两固定板4的上部横安装有一尼龙垫板5,通过该尼龙垫板5可提高支撑稳定,所述固定板4与尼龙垫板5之间通过内六角柱头螺钉7固定,所述管套2未与手柄1接触端上固定有一螺套6,所述螺杆3贯穿于该螺套2。为了能在固定铁芯过程中,操作简单快捷,所述两螺杆3为左右旋,对应的螺套6同样为左右旋。
使用时,在大型铁芯前后、左右、上下都用专业夹具未完全固定前,使用该铁芯窗口双头顶杆,分别置于两边硅钢片与中间硅钢片间,通过旋转螺套6来调整好距离,再配合其他夹具的固定,在接下来的翻转机翻转过程中,不叠上轭的大型硅钢片也能保持原样,不至于两边硅钢片会向内偏移。
该铁芯窗口双头顶杆装置,简单的结构,简单的设计,简单的操作,达到了很好的效果,保证了质量。

Claims (3)

1.一种铁芯窗口双头顶杆,其特征是:所述铁芯窗口双头顶杆具有手柄(1),所述手柄(1)两侧设有管套(2),所述管套(2)内设有螺杆(3),所述螺杆(3)的端头裸露在管套(2)外,所述螺杆(3)的端头两侧设有固定板(4),所述两固定板(4)的上部横安装有一尼龙垫板(5),所述管套(2)未与手柄(1)接触端上固定有一螺套(6),所述螺杆(3)贯穿于该螺套(2)。
2.根据权利要求1所述的铁芯窗口双头顶杆,其特征是:所述固定板(4)与尼龙垫板(5)之间通过内六角柱头螺钉(7)固定。
3.根据权利要求1所述的铁芯窗口双头顶杆,其特征是:所述两螺杆(3)为左右旋,对应的螺套(6)同样为左右旋。
CN2011200449192U 2011-02-23 2011-02-23 铁芯窗口双头顶杆 Expired - Fee Related CN202003827U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200449192U CN202003827U (zh) 2011-02-23 2011-02-23 铁芯窗口双头顶杆

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200449192U CN202003827U (zh) 2011-02-23 2011-02-23 铁芯窗口双头顶杆

Publications (1)

Publication Number Publication Date
CN202003827U true CN202003827U (zh) 2011-10-05

Family

ID=44706557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200449192U Expired - Fee Related CN202003827U (zh) 2011-02-23 2011-02-23 铁芯窗口双头顶杆

Country Status (1)

Country Link
CN (1) CN202003827U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208276A (zh) * 2011-02-23 2011-10-05 吴江市变压器厂有限公司 一种铁芯窗口双头顶杆

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208276A (zh) * 2011-02-23 2011-10-05 吴江市变压器厂有限公司 一种铁芯窗口双头顶杆

Similar Documents

Publication Publication Date Title
CN201735991U (zh) 减少t型钢翼缘焊接变形的夹具
CN201742029U (zh) 维修线夹时用的提线器
CN202003827U (zh) 铁芯窗口双头顶杆
CN205388932U (zh) 一种带有新型支撑结构的电抗器
CN102208276A (zh) 一种铁芯窗口双头顶杆
CN202894606U (zh) 汽车顶盖激光焊接用压紧机构
CN102145873A (zh) 用于波纹膨胀器的补油装置
CN102170099A (zh) 带电或停电更换35kV~500kV及以上输电线路单片绝缘子装置
CN202003834U (zh) 铁芯线圈套绕模
CN201736173U (zh) 电极帽拆卸工具
CN204127229U (zh) 一种弹簧式驱动装置
CN202405966U (zh) 电机转子磁钢安装工具
CN204382192U (zh) 一种净水器阀头拆除装置
CN202449460U (zh) 用于卧式储罐的鞍座机构
CN202316507U (zh) 一种轧机校正机构
CN205852676U (zh) 卷筒安装拆卸工装
CN201868243U (zh) 一种绕线模具定位装置
CN103137319A (zh) 一种绕线模具
CN202357567U (zh) 一种滚筒式网版印刷机的网点修复补偿装置
CN204113828U (zh) 夹板支撑座
CN204262660U (zh) 一种π形骨架结构的转动工装
CN201856228U (zh) 管套拆卸器
CN203160536U (zh) 用于钢结构的系杆机构
CN202507228U (zh) 电极帽拆卸工具
CN203900824U (zh) 一种磨煤机炭精环安装可调式固定架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111005

Termination date: 20140223