CN201993208U - Bogie pipeline pressure-maintaining testing device - Google Patents

Bogie pipeline pressure-maintaining testing device Download PDF

Info

Publication number
CN201993208U
CN201993208U CN2010206629207U CN201020662920U CN201993208U CN 201993208 U CN201993208 U CN 201993208U CN 2010206629207 U CN2010206629207 U CN 2010206629207U CN 201020662920 U CN201020662920 U CN 201020662920U CN 201993208 U CN201993208 U CN 201993208U
Authority
CN
China
Prior art keywords
pipeline
pressure
bogie
rapid
acting coupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206629207U
Other languages
Chinese (zh)
Inventor
王志
王日艺
杨泽迎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Nanjing Puzhen Co Ltd
Original Assignee
CSR Nanjing Puzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Nanjing Puzhen Co Ltd filed Critical CSR Nanjing Puzhen Co Ltd
Priority to CN2010206629207U priority Critical patent/CN201993208U/en
Application granted granted Critical
Publication of CN201993208U publication Critical patent/CN201993208U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The utility model discloses a bogie pipeline pressure-maintaining testing device, which comprises a quick joint, a ball valve, a manual exhaust valve, a pressure gauge and hoses connected with the quick joint. The quick joint is sequentially and serially connected with the ball valve, the manual exhaust valve and the pressure gauge through steel pipes to form a pressure testing pipeline, the two hoses connected with the quick joint are connected in parallel to form a connecting pipeline, and the pressure testing pipeline is connected with the connecting pipeline in parallel. The bogie pipeline pressure-maintaining testing device is small in size, convenient to carry, conveniently connectable to a pipeline to be tested, simple in structure and low in failure rate.

Description

Bogie pipeline pressure-maintaining test device
Technical field
The utility model relates to a kind of pressure test device, a kind of specifically bogie pipeline pressure-maintaining test device.
Background technology
Bogie air pressure test machine in original production also can be given the abundant pressurize of air spring because purposes is wider; Volume is big, and heavy, and the dirigibility portability is all undesirable, and equipment is prone to software fault; Need direct mounting gauge and blast pipe on brake piping during the pressurize test, it is cumbersome to operate, and manometric installation may need to destroy the integrality of the brake piping that has installed, and labour productivity is not high yet simultaneously, and labor strength is big.
The utility model content
Technical problem to be solved in the utility model is, overcomes the shortcoming of prior art, proposes a kind of bogie pipeline pressure-maintaining test device, and it is little, easy to carry to have a volume; And can be connected to easily in the pipeline of required detection, simple in structure, the characteristics that failure rate is low.
In order to solve above technical matters, the utility model provides a kind of bogie pipeline pressure-maintaining test device, comprises rapid-acting coupling, ball valve, manual exhaust valve, tensimeter and is connected with the flexible pipe of rapid-acting coupling; Described rapid-acting coupling is followed in series to form the pressure measurement pipeline by steel pipe and described ball valve, manual exhaust valve and tensimeter, and is with two described flexible pipe formation in parallel connecting lines that are connected with rapid-acting coupling, again that described pressure measurement pipeline is in parallel with described connecting line.
The technical scheme that the utility model further limits is:
Aforesaid bogie pipeline pressure-maintaining test device in order to make the numerical value that records more accurate, is about 0.6MPa according to the force value of estimating, and selected manometric pressure measurement scope is 0~1MPa.
Further, this device use on bogie easily for convenience, aforesaid bogie pipeline pressure-maintaining test device, described hose length is 16~18m.
In order to be the good sealing effect of whole device, and can overhaul this device easily, aforesaid bogie pipeline pressure-maintaining test device, described connected mode be all for being threaded, and be wound with the sealing property that teflon guarantees pipeline on screw thread mouth.
The beneficial effects of the utility model are: the utility model is easy to be easy-to-use, both satisfies the needs of boosting productivity, and accuracy that again can warranty test has reached the purpose of saving cost simultaneously, meets the principle of lean production.This device mounting means is simply accurate, can shorten workman's built-up time greatly, alleviates labor strength, has obtained reaching satisfied effect after coming into operation.
Description of drawings
Fig. 1 is the utility model principle schematic.
Embodiment
Embodiment 1
A kind of bogie pipeline pressure-maintaining test device that present embodiment provides, structure comprise rapid-acting coupling 1, ball valve 2, manual exhaust valve 3, tensimeter 4 and are connected with the flexible pipe 5 of rapid-acting coupling as shown in Figure 1; Described rapid-acting coupling 1 is followed in series to form the pressure measurement pipeline by steel pipe and described ball valve 2, manual exhaust valve 3 and tensimeter 4, select the two approximately flexible pipe that has rapid-acting coupling 5 formation connecting lines in parallel of long 15 meters, again that described pressure measurement pipeline is in parallel with described connecting line.
Principle of work: pipeline pressurize test: connect air intake opening rapid-acting coupling, the bogie pipeline is connected with the rapid-acting coupling of flexible pipe, can begin test.Observe tensimeter, close ball valve after the pressure stability, the dwell time is as requested carried out pressurize, and the variation that can observe tensimeter numerical value in the pressure maintaining period determines whether to leak out and leakage rate.Carry out the pressurize test again after must filling exhaust three times earlier by operations platoon's air valve before the general pressurize.Close ball valve after test is finished, open vent valve, last detaching device.
Pipeline is revealed test: connect air intake opening rapid-acting coupling, the bogie pipeline is connected with the rapid-acting coupling of flexible pipe, can begin test.Observe tensimeter, must be earlier before the general leak detection fill exhaust three times by operations platoon's air valve after, inflate until tensimeter basicly stable once more.Be the leak case of available leak test fluid inspection pipe system this moment.Close ball valve after having checked, open vent valve, last detaching device.The purpose of this test mainly is to seek the leakage point of pipeline, and the effect of this device provides the quick access of pressure air.
In addition to the implementation, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of the utility model requirement.

Claims (4)

1. bogie pipeline pressure-maintaining test device, the flexible pipe that it is characterized in that comprising rapid-acting coupling, ball valve, manual exhaust valve, tensimeter and be connected with rapid-acting coupling; Described rapid-acting coupling is followed in series to form the pressure measurement pipeline by steel pipe and described ball valve, manual exhaust valve and tensimeter, and is with two described flexible pipe formation in parallel connecting lines that are connected with rapid-acting coupling, again that described pressure measurement pipeline is in parallel with described connecting line.
2. bogie pipeline pressure-maintaining test device according to claim 1 is characterized in that: described manometric pressure measurement scope is 0~1MPa.
3. bogie pipeline pressure-maintaining test device according to claim 1 is characterized in that: described hose length is 16~18m.
4. bogie pipeline pressure-maintaining test device according to claim 1, it is characterized in that: described connected mode all adopts and is threaded.
CN2010206629207U 2010-12-14 2010-12-14 Bogie pipeline pressure-maintaining testing device Expired - Fee Related CN201993208U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206629207U CN201993208U (en) 2010-12-14 2010-12-14 Bogie pipeline pressure-maintaining testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206629207U CN201993208U (en) 2010-12-14 2010-12-14 Bogie pipeline pressure-maintaining testing device

Publications (1)

Publication Number Publication Date
CN201993208U true CN201993208U (en) 2011-09-28

Family

ID=44669694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206629207U Expired - Fee Related CN201993208U (en) 2010-12-14 2010-12-14 Bogie pipeline pressure-maintaining testing device

Country Status (1)

Country Link
CN (1) CN201993208U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104122050A (en) * 2013-04-24 2014-10-29 哈尔滨飞机工业集团有限责任公司 Dynamic pressure and static pressure testing device of helicopter distributed atmospheric engine
CN105466647A (en) * 2015-11-18 2016-04-06 长春轨道客车股份有限公司 Bogie gas tightness detection device and detection method thereof
CN106969882A (en) * 2017-05-17 2017-07-21 中车唐山机车车辆有限公司 Track train airduct adapter and track train
CN107449561A (en) * 2017-06-13 2017-12-08 中车青岛四方机车车辆股份有限公司 The detection method of bogie brakes leakage
CN108572052A (en) * 2017-03-14 2018-09-25 中国石油天然气股份有限公司 Multi-tube quick pressure testing device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104122050A (en) * 2013-04-24 2014-10-29 哈尔滨飞机工业集团有限责任公司 Dynamic pressure and static pressure testing device of helicopter distributed atmospheric engine
CN105466647A (en) * 2015-11-18 2016-04-06 长春轨道客车股份有限公司 Bogie gas tightness detection device and detection method thereof
CN108572052A (en) * 2017-03-14 2018-09-25 中国石油天然气股份有限公司 Multi-tube quick pressure testing device
CN106969882A (en) * 2017-05-17 2017-07-21 中车唐山机车车辆有限公司 Track train airduct adapter and track train
CN107449561A (en) * 2017-06-13 2017-12-08 中车青岛四方机车车辆股份有限公司 The detection method of bogie brakes leakage

Similar Documents

Publication Publication Date Title
CN201993208U (en) Bogie pipeline pressure-maintaining testing device
CN202471374U (en) Multifunctional airtightness detection apparatus
CN209656207U (en) A kind of pressure gauge calibrating installation of included cleaning function
CN203443755U (en) Seal leakage test device for oil-immersed transformer
CN213543979U (en) Test experiment device for simulating leakage fault of aviation hydraulic pipeline
CN205157337U (en) Polylinker pipeline pressure testing device
CN204008030U (en) A kind of pipe adapter leak detection apparatus
CN203688152U (en) Novel gas pressure reducer verifying device
CN206177520U (en) Pipeline pressure testing buffer
CN205532590U (en) Novel two return circuit bi -polar shutoff systems of leaking hunting
CN203979895U (en) Testing device for pipeline plugging effect under pressure
CN203101003U (en) Portable pressure-suppression pressure tester
CN204064559U (en) The stiffening ring leakage testing device that a kind of pressure stability is high
CN206935893U (en) A kind of sulfur absorption tower bellows-type fluid level transmitter rinse-system
CN203375037U (en) Flange gasket
CN103307925A (en) Transverse tube-type cooling tower with leakage testing and overhauling function and overhauling and leakage testing method
CN204405274U (en) A kind of device suppressing instrument for the connection of multiple spot stagnation pressure tube
CN204788831U (en) Device that leaks hunting of high -pressure gas spare part
CN208254552U (en) A kind of thermal test flow differential pressure transmitter attachment device
CN207515986U (en) A kind of oil tank for oil immersion type transformer leakage testing device
CN203259321U (en) Instrument pipeline pressure test device
CN206683847U (en) The complete pressurized equipment performance detection testing bench of secondary water-supply
CN204788836U (en) Engine experiment device that leaks hunting
CN204286671U (en) Ethylene oxide device loading catalyst pressure difference test meter
CN201716166U (en) Novel leakproofness detecting device for connectors of plastic pipes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20151214

EXPY Termination of patent right or utility model