CN201972600U - Drilling device for handling bare rocks - Google Patents

Drilling device for handling bare rocks Download PDF

Info

Publication number
CN201972600U
CN201972600U CN2011200937995U CN201120093799U CN201972600U CN 201972600 U CN201972600 U CN 201972600U CN 2011200937995 U CN2011200937995 U CN 2011200937995U CN 201120093799 U CN201120093799 U CN 201120093799U CN 201972600 U CN201972600 U CN 201972600U
Authority
CN
China
Prior art keywords
drilling
drilling machine
fore
ship
machine platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200937995U
Other languages
Chinese (zh)
Inventor
张超
周瑞杰
肖彬
苏建华
张金连
缪晨辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Port Channel Engineering Co Ltd
Original Assignee
China Railway Port Channel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Port Channel Engineering Co Ltd filed Critical China Railway Port Channel Engineering Co Ltd
Priority to CN2011200937995U priority Critical patent/CN201972600U/en
Application granted granted Critical
Publication of CN201972600U publication Critical patent/CN201972600U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a drilling device for handling bare rocks, which is arranged at the fore part of a rock explosion ship and comprises a plurality of drilling machine platform trusses that are fixedly arranged on the fore part; and a drilling machine guide rail is arranged on each drilling machine platform truss and is provided with a drilling machine, and a sliding device capable of driving the drilling machine to slide on the drilling machine guide rail is arranged between each drilling machine and each drilling machine guide rail. The drilling device is arranged on the fore part of the ship, the drilling machines of the drilling device can slide on the drilling machine guide rails by the sliding devices arranged at the lower parts of the drilling machines so as to drive the drilling machines to move toward the fore part, and the drilling device can conduct rock explosion operation of bare rocks by utilizing a slope space at the lower part of the fore part and the height difference between the drilling machine platform trusses and a deck of the rock explosion ship. The drilling device is used in the field of offshore operation.

Description

A kind of drilling equipment that is used for the bare rock processing
Technical field
The utility model relates to a kind of marine drilling equipment, particularly relates to a kind of drilling equipment that bare rock is handled that is used for.
Background technology
By operation ship or operation at sea platform, utilize drilling tool to pass water layer subaqueous rock is holed, and realize the operation of explosion, be called underwater drilling and blasting.
In recent years,, need Jun Shengangkou and navigation channel, when running into soil property, then adopt the mode of underwater demolition than hard and rock along with the development of water transport industry.Underwater drilling and blasting is a kind of bursting work mode that is most widely used at present, extensively apply to the dredging in port works construction, navigation channel, under water building dismounting and remove obstacles etc.
The job platform of underwater drilling and blasting divides by type, mainly contains following several:
1. simple rack formula operation at sea platform comprises fixed support platform and bank fixed support platform in the water
2. floatation type drilling and blasting operation ship and job platform;
3. supporting leg ascending/decending bore operation platform waterborne.
Existing underwater drilling job platform only is applicable to the reef explosion operation of submerged reef, covers and uncovers rock, all can't handle for bare rocks such as isolated rock that still exposes when the high water spring on sea, lake, the river surface or coral reefs.
The utility model content
For addressing the above problem, the utility model provides a kind of drilling equipment that bare rock is handled that can be used for.
The technical scheme that its technical problem that solves the utility model adopts is:
A kind of drilling equipment that is used for the bare rock processing, drilling equipment is installed on the fore of underwater drilling and blasting ship, drilling equipment comprises the some drilling machine platform truss that are fixedly installed in fore, the drilling machine platform truss is provided with borer rail, rig is installed on the borer rail, is provided with between rig and borer rail and can drives the carriage that rig slides on borer rail.
Be further used as the improvement of technical solutions of the utility model, the height-adjustable of rig.
Be further used as the improvement of technical solutions of the utility model, the fore of underwater drilling and blasting ship is provided with some flange, fixes by Bolt Connection between drilling machine platform truss and flange.
Be further used as the improvement of technical solutions of the utility model, the height-adjustable of drilling machine platform truss.
Be further used as the improvement of technical solutions of the utility model, the fore position of underwater drilling and blasting ship is provided with anchor pole.
The beneficial effects of the utility model: this drilling equipment is arranged at the fore of underwater drilling and blasting ship, the rig of this drilling equipment slides on borer rail by the carriage that is arranged at its underpart and drives it and on the bow move the position, and this drilling equipment can utilize the space, slope of fore bottom and drilling machine platform truss and the tweendeck difference in height of underwater drilling and blasting ship to carry out the reef explosion operation of bare rock simultaneously.
Description of drawings
The utility model is described in further detail below in conjunction with accompanying drawing:
Fig. 1 is the utility model embodiment overall structure schematic diagram;
Fig. 2 is the utility model fore flange schematic layout pattern.
The specific embodiment
With reference to Fig. 1, Fig. 2, the utility model is a kind of drilling equipment that bare rock is handled that is used for, drilling equipment is installed on the fore of underwater drilling and blasting ship, drilling equipment comprises the some drilling machine platform truss 1 that are fixedly installed in fore, drilling machine platform truss 1 is provided with borer rail 2, rig 3 is installed on the borer rail 2, and 2 of rig 3 and borer rails are provided with and can drive the carriage 4 that rig 3 slides on borer rails 2.
This drilling equipment is arranged at the fore of underwater drilling and blasting ship, the rig 3 of this drilling equipment slides on borer rail 2 by the carriage 4 that is arranged at its underpart and drives it and on the bow move the position, and this drilling equipment can utilize the space, slope of fore bottom and drilling machine platform truss 1 and the tweendeck difference in height of underwater drilling and blasting ship to carry out the reef explosion operation of bare rock simultaneously.
As the utility model preferred embodiment, the height-adjustable of rig 3.
Utilize the space, slope of underwater drilling and blasting ship fore bottom can make underwater drilling and blasting ship more be close to the bare rock operation, and owing to the height of bare rock differs, so need under different condition of construction, can adjust the height of rig 3.
As the utility model preferred embodiment, the fore of underwater drilling and blasting ship is provided with some flange 5, and 5 of drilling machine platform truss 1 and flange are fixed by Bolt Connection.
The fore of underwater drilling and blasting ship is provided with that some flange 5 are realized and the screw thread of 1 of drilling machine platform truss is fixedly connected, after underwater drilling and blasting ship is finished dealing with to bare rock, drilling machine platform truss 1 can be dismantled, thereby avoid after bare rock is finished dealing with, drilling equipment still takies the fore space of underwater drilling and blasting ship.
As the utility model preferred embodiment, the height-adjustable of drilling machine platform truss 1.
The height of drilling machine platform truss 1 is unfixing, can reset the height of drilling machine platform truss 1 according to the needs of condition of construction under different construction states.
As the utility model preferred embodiment, the fore position of underwater drilling and blasting ship is provided with anchor pole 6.After underwater drilling and blasting ship rested against the bare rock position, underwater drilling and blasting ship fixed the operating position of underwater drilling and blasting ship by transferring anchor pole 6, strengthens the working security of its reef explosion process.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite of the utility model spirit, modification that these are equal to or replacement all are included in the application's claim institute restricted portion.

Claims (5)

1. one kind is used for the drilling equipment that bare rock is handled, described drilling equipment is installed on the fore of underwater drilling and blasting ship, it is characterized in that: described drilling equipment comprises the some drilling machine platform truss (1) that are fixedly installed in fore, described drilling machine platform truss (1) is provided with borer rail (2), rig (3) is installed on the described borer rail (2), is provided with between described rig (3) and borer rail (2) and can drives described rig (3) is gone up slip at borer rail (2) carriage (4).
2. the drilling equipment that is used for the bare rock processing according to claim 1 is characterized in that: the height-adjustable of described rig (3).
3. the drilling equipment that is used for the bare rock processing according to claim 1, it is characterized in that: the fore of described underwater drilling and blasting ship is provided with some flange (5), fixes by Bolt Connection between described drilling machine platform truss (1) and flange (5).
4. the drilling equipment that is used for the bare rock processing according to claim 1 is characterized in that: the height-adjustable of described drilling machine platform truss (1).
5. the drilling equipment that is used for the bare rock processing according to claim 1, it is characterized in that: the fore position of described underwater drilling and blasting ship is provided with anchor pole (6).
CN2011200937995U 2011-04-01 2011-04-01 Drilling device for handling bare rocks Expired - Fee Related CN201972600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200937995U CN201972600U (en) 2011-04-01 2011-04-01 Drilling device for handling bare rocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200937995U CN201972600U (en) 2011-04-01 2011-04-01 Drilling device for handling bare rocks

Publications (1)

Publication Number Publication Date
CN201972600U true CN201972600U (en) 2011-09-14

Family

ID=44577707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200937995U Expired - Fee Related CN201972600U (en) 2011-04-01 2011-04-01 Drilling device for handling bare rocks

Country Status (1)

Country Link
CN (1) CN201972600U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108725703A (en) * 2018-06-05 2018-11-02 浙江省水利河口研究院 Profundal zone monitoring facilities bury platform and application method
CN110284543A (en) * 2019-07-02 2019-09-27 长江重庆航道工程局 A kind of clear reef ship and its underwater reefs method for cleaning

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108725703A (en) * 2018-06-05 2018-11-02 浙江省水利河口研究院 Profundal zone monitoring facilities bury platform and application method
CN110284543A (en) * 2019-07-02 2019-09-27 长江重庆航道工程局 A kind of clear reef ship and its underwater reefs method for cleaning

Similar Documents

Publication Publication Date Title
EP2252502B1 (en) Offshore pipe and riser handling drilling vessel
RU2405906C2 (en) System for storage and transportation of pipes
CN102913162A (en) Deep-sea sediment continuous pressure maintaining coring submarine drilling machine and operation method
MX2014014850A (en) Offshore drilling installation and method for offshore drilling.
CN113914803B (en) Offshore casing surge compensation double-drive three-layer casing drilling coring device
CN201972600U (en) Drilling device for handling bare rocks
US20130075102A1 (en) Mobile offshore drilling unit
KR101594062B1 (en) Activity mode changeable drilling rig and drilling structure with the same
CN102947534A (en) Subsea completions and well interventions using a vessel of opportunity
CN107939311B (en) Modularized small-sized well repair system suitable for being carried on FPSO
CN103738474A (en) Ship drilling platform
CN207538796U (en) A kind of modular small well workover system for being suitble to be equipped on FPSO
KR200484424Y1 (en) Parking structure of cradle and cradle with the structure in drillship
CN204822017U (en) Dynamic positioning semi -submerged formula marine drilling platform with many well drillings
KR20110094895A (en) Derrick lifting structure and oil prospecting ship including the same
KR20160006479A (en) Bop crane and drillship having the same
KR20200009675A (en) A drillship
KR200490647Y1 (en) Riser Storage Apparatus
KR20160023044A (en) Drilling equipment of offshore and install structure of draw work
CN203716860U (en) Underwater blasting drilling positioning working platform
KR101599393B1 (en) Arrangement structure of drill water tank and drillship having the structure
KR101594102B1 (en) Drillship and loading method of materials
KR20150004035U (en) Well test deck apparatus of drill ship
KR101606698B1 (en) Riser hold drain system of drillship
KR20160000496U (en) Drillship

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110914

Termination date: 20160401

CF01 Termination of patent right due to non-payment of annual fee