CN201966539U - Overhead ground wire mounting lifter of power transmission line - Google Patents

Overhead ground wire mounting lifter of power transmission line Download PDF

Info

Publication number
CN201966539U
CN201966539U CN201120050183XU CN201120050183U CN201966539U CN 201966539 U CN201966539 U CN 201966539U CN 201120050183X U CN201120050183X U CN 201120050183XU CN 201120050183 U CN201120050183 U CN 201120050183U CN 201966539 U CN201966539 U CN 201966539U
Authority
CN
China
Prior art keywords
ground wire
bracket
hook
overhead ground
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120050183XU
Other languages
Chinese (zh)
Inventor
尹志锐
李辉
随学庆
李卫红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co
State Grid Corp of China SGCC
Original Assignee
Hengshui Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengshui Power Supply Co filed Critical Hengshui Power Supply Co
Priority to CN201120050183XU priority Critical patent/CN201966539U/en
Application granted granted Critical
Publication of CN201966539U publication Critical patent/CN201966539U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Light Guides In General And Applications Therefor (AREA)

Abstract

The utility model belongs to the technical field of an overhead ground wire mounting instrument of a power transmission line, and discloses an overhead ground wire mounting lifter of the power transmission line. The main technical characteristics of the lifter are that: the lifter comprises a rope tightener with a handle, a hook and a shell; a bracket is fixed at the lower end of the shell; one end of the bracket is provided with a bent hook, and the other end of the bracket is provided with a folding edge; the folding edge is provided with a threaded hole in which a screw stem is arranged; and the bracket is arranged on a cross arm, the edge of cross arm angle iron is clamped by the bent hook, then the folding edge is clamped on a side face of the angle iron, and the screw stem is turned, so that the bracket is fastened to the cross arm, the hook is hooked on an overhead ground wire, the handle is turned, the ground wire is lifted by the hook to get off a pulley, and then a suspension clamp is arranged. Thus, labor intensity is reduced, the labor intensity is obviously reduced when personnel work at high altitude, danger of working high above the ground is reduced, and mounting efficiency is improved.

Description

输电线路架空地线安装提升器Transmission line overhead ground wire installation riser

技术领域technical field

本实用新型属于输电线路架空地线安装器具技术领域,具体的讲涉及输电线路架空地线安装提升器。The utility model belongs to the technical field of installation equipment for overhead ground wires of transmission lines, in particular to a lifter for installation of overhead ground wires of transmission lines.

背景技术Background technique

架空地线安装时,需要将地线从滑轮上提前,然后撤出滑轮,用悬垂线夹固定在横担上,操作人登塔到横担挂线的位置,把铁丝一端固定在横担的合适位置,另一端挂住地线,进行缠绕,提起地线,摘掉滑车,把地线放到悬垂线夹里面,进行安装附件。此方法应用起来非常不便,当地线安装完毕后,清除紧紧缠绕在地线上的铁丝非常困难。同时在操作过程中存在不安全因素,由于常用铁丝的承重能力有限,在地线提升过程中极易发生铁丝断股,造成工作中断,延误施工进度。以前的施工方法,由于地线自重大,造成劳动强度大,导致工作中断现象时有发生,再重新安装时,还需增加工时和劳动力才能完成。由于此问题的存在,严重影响了高空作业人身安全和企业的经济效益。由于地线都是悬挂在杆塔的最高点,如果使用手扳葫芦,在横担头上悬挂好,链条收到最短时,手扳葫芦的吊钩比地线还低,地线附件中的应用过程,无法用此工具提升地线进行附件安装。When installing the overhead ground wire, it is necessary to advance the ground wire from the pulley, then withdraw the pulley, and fix it on the cross arm with a suspension wire clamp. In the right position, hang the ground wire at the other end, wind it, lift the ground wire, remove the pulley, put the ground wire in the suspension clamp, and install the accessories. This method is very inconvenient to apply. After the ground wire is installed, it is very difficult to remove the iron wire tightly wound on the ground wire. At the same time, there are unsafe factors in the operation process. Due to the limited load-bearing capacity of commonly used iron wires, it is very easy for the wires to break during the ground wire lifting process, causing work interruption and delaying the construction progress. In the previous construction method, due to the heavy weight of the ground wire, the labor intensity was high, resulting in frequent interruptions in work, and when reinstalling, additional man-hours and labor were required to complete. Due to the existence of this problem, the personal safety of high-altitude operations and the economic benefits of enterprises have been seriously affected. Since the ground wire is hung at the highest point of the tower, if a lever block is used, it should be hung on the cross-arm head. When the chain is the shortest, the hook of the lever block is lower than the ground wire. The application of the ground wire accessories process, the tool cannot be used to lift the ground wire for accessory installation.

实用新型内容Utility model content

本实用新型解决的技术问题就是提供一种使用安全、劳动强度低、安装效率高、便于操作的输电线路架空地线安装提升器。The technical problem solved by the utility model is to provide a lifter for installation of overhead ground wires of power transmission lines, which is safe in use, low in labor intensity, high in installation efficiency and easy to operate.

为解决上述技术问题,本实用新型提出的技术方案为:包括带有手柄、挂钩和壳体的紧绳器,在所述壳体下端固定有支架,在所述支架一端设置有弯钩,在其另一端设置有折边,在该折边上设置有螺纹孔,在所述螺纹孔内设置有螺杆。In order to solve the above-mentioned technical problems, the technical solution proposed by the utility model is: a rope tightener with a handle, a hook and a housing, a bracket is fixed at the lower end of the housing, and a hook is arranged at one end of the bracket. The other end is provided with a folded edge, and a threaded hole is arranged on the folded edge, and a screw rod is arranged in the threaded hole.

本实用新型提供的输电线路架空地线安装提升器,同现有技术相比较具有以下优点:由于包括带有手柄、挂钩和壳体的紧绳器,在所述壳体下端固定有支架,在所述支架一端设置有弯钩,在其另一端设置有折边,在该折边上设置有螺纹孔,在所述螺纹孔内设置有螺杆,先将支架置于横担之上,用弯钩卡住横担角铁的边缘,然后将折边卡在角铁的侧面,旋转螺杆,此时支架紧固在横担上,将挂钩挂在架空地线上,转动手柄,挂钩将地线抬高,脱离滑车,然后将悬垂线夹安装即可,减少了劳动强度,每段架空地线的重量大约为120kg,而使用该输电线路架空地线安装提升器,拉力仅为20kg左右,人员在高空的劳动强度明显降低,减少了高空作业的危险性,提高了按照效率。Compared with the prior art, the lifter for installing the overhead ground wire of the transmission line provided by the utility model has the following advantages: because it includes a rope tightener with a handle, a hook and a housing, a bracket is fixed at the lower end of the housing, One end of the bracket is provided with a hook, and the other end is provided with a folded edge, and a threaded hole is arranged on the folded edge, and a screw rod is arranged in the threaded hole. The hook catches the edge of the cross-arm angle iron, then clamps the folded edge on the side of the angle iron, rotates the screw, at this time the bracket is fastened on the cross-arm, hangs the hook on the overhead ground wire, turns the handle, the hook connects the ground wire Elevate, disengage from the pulley, and then install the suspension clamp, which reduces labor intensity. The weight of each overhead ground wire is about 120kg, while using the overhead ground wire of this transmission line to install the lifter, the pulling force is only about 20kg. The labor intensity at high altitude is significantly reduced, reducing the danger of high-altitude operations and improving efficiency.

附图说明Description of drawings

图1为输电线路架空地线安装提升器的结构示意图。Fig. 1 is a schematic structural diagram of a lifter for installing an overhead ground wire of a transmission line.

具体实施方式Detailed ways

下面结合附图对本实用新型所提出的输电线路架空地线安装提升器的结构做进一步说明。The structure of the installation lifter for the transmission line overhead ground wire proposed by the utility model will be further described below in conjunction with the accompanying drawings.

如图1所示,为输电线路架空地线安装提升器的结构示意图。其结构包括带有手柄1、挂钩2和壳体3的紧绳器4,在紧绳器4的壳体3下端固定有支架5,支架5的一端设置有弯钩6,其另一端设置有折边7,在折边7上设置有螺纹孔8,在螺纹孔8内设置有螺杆9。As shown in Figure 1, it is a schematic structural diagram of installing a lifter for the overhead ground wire of a transmission line. Its structure includes a rope tightener 4 with a handle 1, a hook 2 and a housing 3. A bracket 5 is fixed at the lower end of the housing 3 of the rope tightener 4. One end of the bracket 5 is provided with a crotch 6, and the other end is provided with a The flange 7 is provided with a threaded hole 8 , and a screw 9 is provided in the threaded hole 8 .

使用时,先将支架5置于横担之上,用弯钩6卡住横担角铁的边缘,然后将折边7卡在角铁的侧面,旋转螺杆9,此时支架5紧固在横担上,将挂钩2挂在架空地线上,转动手柄1,挂钩2将地线抬高,脱离滑车,然后将悬垂线夹安装即可,减少了劳动强度,每段架空地线的重量大约为120kg,而使用该输电线路架空地线安装提升器,拉力仅为20kg左右,人员在高空的劳动强度明显降低,减少了高空作业的危险性,提高了按照效率。During use, the bracket 5 is placed on the cross arm earlier, the edge of the angle iron of the cross arm is clamped with the crotch 6, then the flanging 7 is stuck on the side of the angle iron, the screw rod 9 is rotated, and the support 5 is fastened on the On the cross arm, hang the hook 2 on the overhead ground wire, turn the handle 1, the hook 2 will raise the ground wire, get off the pulley, and then install the suspension clamp, which reduces labor intensity and the weight of each overhead ground wire It is about 120kg, but using the overhead ground wire of the transmission line to install the lifter, the pulling force is only about 20kg, the labor intensity of personnel at high altitude is significantly reduced, the danger of high-altitude operation is reduced, and the efficiency is improved.

本实用新型的保护范围不仅仅局限于上述实施例,只要结构与本实用新型输电线路架空地线安装提升器结构相同,就落在本实用新型保护的范围。The scope of protection of the utility model is not limited to the above-mentioned embodiments, as long as the structure is the same as that of the lifter for installing the overhead ground wire of the transmission line of the utility model, it falls within the scope of protection of the utility model.

Claims (1)

1. the transmission line overhead ground wire is installed lifter, it is characterized in that: comprise the euphroe that has handle, hook and housing, be fixed with support in described housing lower end, be provided with crotch at described support one end, be provided with flanging at its other end, this flanging is provided with screwed hole, is provided with screw rod in described screwed hole.
CN201120050183XU 2011-02-28 2011-02-28 Overhead ground wire mounting lifter of power transmission line Expired - Fee Related CN201966539U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120050183XU CN201966539U (en) 2011-02-28 2011-02-28 Overhead ground wire mounting lifter of power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120050183XU CN201966539U (en) 2011-02-28 2011-02-28 Overhead ground wire mounting lifter of power transmission line

Publications (1)

Publication Number Publication Date
CN201966539U true CN201966539U (en) 2011-09-07

Family

ID=44529093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120050183XU Expired - Fee Related CN201966539U (en) 2011-02-28 2011-02-28 Overhead ground wire mounting lifter of power transmission line

Country Status (1)

Country Link
CN (1) CN201966539U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638012A (en) * 2012-04-24 2012-08-15 河北省电力公司超高压输变电分公司 External-support steel wire rope anti-abrasion pulley
CN103441453A (en) * 2013-09-03 2013-12-11 杨军 Line suspending device
CN104505771A (en) * 2014-12-31 2015-04-08 国家电网公司 Overhead ground wire lifter
CN105048353A (en) * 2015-08-26 2015-11-11 国网山东高密市供电公司 Electric stay wire overhead device for power line installation
CN105314560A (en) * 2015-11-09 2016-02-10 国家电网公司 Conducting wire lifter
CN105826856A (en) * 2016-04-22 2016-08-03 国网浙江省电力公司嘉兴供电公司 Multifunctional lifter for overhead ground wire
CN106216566A (en) * 2016-09-22 2016-12-14 国家电网公司 The steel tower down conductor easily installed holds curved device
CN109193448A (en) * 2018-08-14 2019-01-11 国网辽宁省电力有限公司辽阳供电公司 A kind of installation tool and installation method promoting aerial earth wire
CN110261726A (en) * 2019-07-25 2019-09-20 国网河北省电力有限公司邢台供电分公司 A discharge coil polarity testing device
CN112624004A (en) * 2020-11-30 2021-04-09 国网河南省电力公司检修公司 Tower climbing device for line maintenance of high-voltage iron tower
CN114899756A (en) * 2022-05-16 2022-08-12 国网山东省电力公司广饶县供电公司 Unmanned aerial vehicle installation formula high altitude anti-falling device for power transmission line

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638012A (en) * 2012-04-24 2012-08-15 河北省电力公司超高压输变电分公司 External-support steel wire rope anti-abrasion pulley
CN103441453A (en) * 2013-09-03 2013-12-11 杨军 Line suspending device
CN103441453B (en) * 2013-09-03 2016-04-20 国家电网公司 A kind of rope hoister
CN104505771A (en) * 2014-12-31 2015-04-08 国家电网公司 Overhead ground wire lifter
CN105048353A (en) * 2015-08-26 2015-11-11 国网山东高密市供电公司 Electric stay wire overhead device for power line installation
CN105314560A (en) * 2015-11-09 2016-02-10 国家电网公司 Conducting wire lifter
CN105826856A (en) * 2016-04-22 2016-08-03 国网浙江省电力公司嘉兴供电公司 Multifunctional lifter for overhead ground wire
CN106216566A (en) * 2016-09-22 2016-12-14 国家电网公司 The steel tower down conductor easily installed holds curved device
CN109193448A (en) * 2018-08-14 2019-01-11 国网辽宁省电力有限公司辽阳供电公司 A kind of installation tool and installation method promoting aerial earth wire
CN110261726A (en) * 2019-07-25 2019-09-20 国网河北省电力有限公司邢台供电分公司 A discharge coil polarity testing device
CN112624004A (en) * 2020-11-30 2021-04-09 国网河南省电力公司检修公司 Tower climbing device for line maintenance of high-voltage iron tower
CN114899756A (en) * 2022-05-16 2022-08-12 国网山东省电力公司广饶县供电公司 Unmanned aerial vehicle installation formula high altitude anti-falling device for power transmission line

Similar Documents

Publication Publication Date Title
CN201966539U (en) Overhead ground wire mounting lifter of power transmission line
CN101409434B (en) ground riser
CN205543953U (en) Multi -functional fixed hoisting point anchor clamps
CN201882804U (en) Hoisting tool for maintenance of electric power line
CN203865866U (en) Remote-control adjusting device for mounting angle of power transformer bushing
WO2016000416A1 (en) Overhead ground wire lifter
CN202474703U (en) Overhead ground wire lifting mechanism
CN207530438U (en) Tangent tower ground wire line lifter
CN202190018U (en) An overhead ground wire ratchet wrench carrying wire tool
CN103199461B (en) Transmission line lightning conducter elevating method
CN202134855U (en) Wire lifting device for overhead ground wire
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN201312084Y (en) Ground wire raiser
CN203278097U (en) Electric pole cross arm erecting device
CN202190019U (en) Aerial earth wire ratchet wrench type two-point lifting tool
CN202373939U (en) Live-working double-conductor lifting device
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN202423997U (en) Combined ground wire lifting mechanism
CN201868786U (en) Special repairing lifter for 220KV lightning wire of power transmission line
CN202856246U (en) Insulator replacement device
CN203607750U (en) Suspension ring device for loosening-tightening line pulley
CN207166026U (en) A kind of ground wire for being used in UHV transmission line is special to carry the Line tool
CN206307942U (en) A kind of lifting device
CN202268651U (en) Fixing device of transmission wire lifter
CN106429935B (en) A kind of lifting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP. HEBEI ELECTRIC POWER CORP

Effective date: 20130308

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130308

Address after: 053000 Hengshui East Road, Hebei, No. 185

Patentee after: Hengshui Power Supply Company

Patentee after: State Grid Corporation of China

Patentee after: Hebei Electric Power Corporation

Address before: 053000 Hengshui East Road, Hebei, No. 185

Patentee before: Hengshui Power Supply Company

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110907

Termination date: 20160228