CN201964709U CN 201120020194 CN201120020194U CN201964709U CN 201964709 U CN201964709 U CN 201964709U CN 201120020194 CN201120020194 CN 201120020194 CN 201120020194 U CN201120020194 U CN 201120020194U CN 201964709 U CN201964709 U CN 201964709U
Authority
CN
China
Prior art keywords
water
collecting tray
condensed water
preheating
header tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120020194
Other languages
Chinese (zh)
Inventor
刘明国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Qutu Thermal Control System Co Ltd
Original Assignee
Suzhou Qutu Thermal Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Qutu Thermal Control System Co Ltd filed Critical Suzhou Qutu Thermal Control System Co Ltd
Priority to CN 201120020194 priority Critical patent/CN201964709U/en
Application granted granted Critical
Publication of CN201964709U publication Critical patent/CN201964709U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The utility model relates to a preheating condensed water vaporizing device, which comprises a water collecting plate and an electric heating vaporization device. The water collecting plate collects condensed water and is provided with a preheating device which preheats the collected condensed water and discharges the condensed water to a limit drainage connector of the electric heating vaporization device after being preheated. The electric heating vaporization device comprises a water collecting tank and a heating element, wherein the water collecting tank is used for collecting the condensed water in the water collecting plate after being preheated and the heating element is used for heating vaporizing the condensed water after being preheated. The device preheats the condensed water before the condensed water is heating vaporized so as to improve vaporization rate, reduce energy consumption and prolong service life of the preheating condensed water vaporizing device.

Description

Can pre-heated condensation water vaporization apparatus and machine cabinet air-conditioner
Technical field
The utility model relates to a kind of condensation water vaporization apparatus, relates in particular to a kind of condensation water vaporization apparatus that is applied to refrigeration plant.
Background technology
Refrigeration plant in the course of the work because the temperature of heat exchanger surface is lower than airborne dew-point temperature, airborne moisture can be at the heat exchanger surface generation condensed water that condenses.The part occasion, the condensed water that refrigeration plant produces pollutes the environment, even needing to cause the damage of cooling system.Common way is that condensed water is directly drained into machine exterior, thereby but might cause ground humidity or ponding to influence the attractive in appearance of environment like this, therefore need to take drainage measure sometimes.Existing condensation water vaporization apparatus adopts high-pressure fog, UTILIZATION OF VESIDUAL HEAT IN, wet film, ultrasonic atomizatio or heating to realize that utilize compressor exhaust pipe waste heat vaporization and condensation water separately, evaporating capacity is less usually; The independent electrical heating vaporization and condensation water that uses, energy consumption was bigger when evaporating capacity increased, so there is certain limitation.
The vapourizing unit that China's utility model patent discloses a kind of air conditioner condensate water CN201022420Y number.This vapourizing unit has condenser, air-conditioner radiator, the pump housing, water leg and connects water pipe.Described water leg has three, and is separately positioned on the upper and lower part of radiator and the bottom of condenser.First water leg bottom that is arranged on radiator top offers dripping hole and this first water leg is connected with pump housing delivery port by connecting water pipe.Second water leg that is arranged on the radiator bottom is communicated with the 3rd water leg by connecting water pipe.The 3rd water leg is communicated with pump housing water inlet and condenser delivery port.During work, the condensed water that air-conditioner condenser produces is transported in first water leg and is dispersed into many droplets by the dripping hole at the bottom of this first water leg by the pump housing and drops onto on the radiator.Radiator temperature is higher when working because of air-conditioner, and radiator heats vaporization to droplet.Steam after the vaporization is blown away by the other cooling fan of radiator, and the fluid drips that is not vaporized is fallen in second water leg, and delivers to the 3rd water leg and be sent to first water leg again by the pump housing and vaporize through connecting water pipe.
Yet it is not enough only relying on the heat of radiator to come vaporization and condensation water, and three water legs add that the design of the extra pump housing needs enough spaces are arranged in the air-conditioner, and needs specially in the pump housing designs pipeline and loop, and cost is than higher and complex structure.
Therefore, be necessary to provide a kind of improved condensation water vaporization apparatus to overcome the shortcoming of prior art.
The utility model content
The purpose of this utility model be to provide a kind of can pre-heated condensation water vaporization apparatus, its compact conformation is simple, energy-saving consumption-reducing also has than the long life.
For achieving the above object, the utility model be about a kind of can pre-heated condensation water vaporization apparatus, it comprises water-collecting tray and electrical heating vapourizing unit.Water-collecting tray is collected condensed water and is had preheating device to condensed water preheating of collecting and the spacing drainage joint that the condensed water after the preheating is expelled to the electrical heating vapourizing unit.The electrical heating vapourizing unit comprises with the header tank of condensed water after above-mentioned spacing drainage joint is connected the preheating that is used to receive in the water-collecting tray and the preheating condensed water in the header tank is heated the heater element of vaporization.
As further improvement of the utility model, described preheating device is the compressor exhaust pipe that is positioned in the water-collecting tray.
As further improvement of the utility model, also be provided with the pressing plate that compressor exhaust pipe is limited to the water-collecting tray bottom in the described water-collecting tray.
As further improvement of the utility model, described water-collecting tray is second water-collecting tray, also has first water-collecting tray that is positioned at second water-collecting tray top, and this first water-collecting tray is directly collected condensed water and had drainage joint condensed water is entered in second water-collecting tray.
As further improvement of the utility model, described electrical heating vapourizing unit also has the heat-insulation layer that is coated on outside the header tank.
As further improvement of the utility model, the header tank of described electrical heating vapourizing unit is provided with water inlet and the steam vent that is connected with the spacing drainage joint of water-collecting tray in its top.
As further improvement of the utility model, the header tank of described electrical heating vapourizing unit bottom is provided with spacing drainage joint and leads to outside.
As further improvement of the utility model, described header tank one sidewall has the installation limit that exceeds its bottom and outwards bend, in order to the electrical heating vapourizing unit is mounted to machine cabinet air-conditioner.
As further improvement of the utility model, described heater element is fixedly installed in header tank one sidewall and has and is positioned at the outer plug of header tank and enters the heating part that the condensed water of header tank after to preheating heats vaporization.
A kind of have a described machine cabinet air-conditioner that can pre-heated condensation water vaporization apparatus, and it has housing, is contained in the evaporimeter in the housing, condenser, compressor.Compressor has blast pipe.Describedly can comprise water-collecting tray and electrical heating vapourizing unit by pre-heated condensation water vaporization apparatus.Water-collecting tray is collected the condensed water of evaporimeter generation and is had preheating device to condensed water preheating of collecting and the spacing drainage joint that the condensed water after the preheating is expelled to the electrical heating vapourizing unit.The electrical heating vapourizing unit comprises with the header tank of condensed water after above-mentioned spacing drainage joint is connected the preheating that is used to receive in the water-collecting tray and the preheating condensed water in the header tank is heated the heater element of vaporization.
The beneficial effects of the utility model are: utilize the heat of compressor exhaust pipe that condensed water is carried out preheating, can improve the vaporization rate and the energy-saving consumption-reducing of condensed water, thereby improve can pre-heated condensation water vaporization apparatus life-span.
Description of drawings
Fig. 1 be the utility model can be pre-heated the assembling schematic perspective view of the machine cabinet air-conditioner used of condensation water vaporization apparatus.
Fig. 2 is another angle assembling schematic perspective view of structure shown in Figure 1.
Fig. 3 be the utility model can be pre-heated the part assembling schematic perspective view of the machine cabinet air-conditioner used of condensation water vaporization apparatus.
Fig. 4 is the schematic perspective view of the electric heater unit that the utility model can pre-heated condensation water vaporization apparatus.
Fig. 5 is another angle schematic perspective view of structure shown in Figure 4.
Fig. 6 is the three-dimensional exploded view of the electric heater unit that the utility model can pre-heated condensation water vaporization apparatus.
Fig. 7 is the schematic perspective view after electric heater unit that the utility model can pre-heated condensation water vaporization apparatus is removed heat-insulation layer.
The specific embodiment
See also Fig. 1 to Fig. 3, the utility model can be applied in the air-conditioner with solving the condensed water problem by pre-heated condensation water vaporization apparatus 200.In the utility model preferred implementation, can be applied to Fig. 1 to machine cabinet air-conditioner 100 shown in Figure 3 by pre-heated condensation water vaporization apparatus 200.This machine cabinet air-conditioner 100 comprises rectangular air-conditioning cabinet and electric control system.In the utility model preferred implementation, this rack special air conditioner device 100 is used to accumulator cell heat preserving cabinet (not shown) to realize refrigeration, guarantees that the accumulator cell heat preserving cabinet normally moves with certain temperature.Yet the utility model can pre-heated condensation water carburetor 200 be not limited in and be applied to the accumulator cell heat preserving cabinet, and it can also be applied to other can adopt the rack that the utility model can pre-heated condensation water carburetor 200.
The air-conditioning cabinet comprises internal circulation heat-exchanging system 21 and the outer circulation heat-exchange system 22 that is separated to form jointly by baffle assembly 4 and shell body 5.
Shell body 5 comprises respectively at its top and bottom and offers back shroud 51, pair of side plates 52, base 54, the top cover 53 of inboard air inlet 511 of cabinet and the inboard air outlet 512 of cabinet and offer the front shroud 55 of cabinet outside air outlet 552 and cabinet outside air inlet 551 respectively at its top and bottom.Mutual screw lock of these assemblies or riveted joint are connected to become shell body 5.Can also organize in the inboard air outlet of cabinet 512 rear portions in the face of the back shroud 51 of accumulator cell heat preserving cabinet inside and to be provided with dust cover (not shown) and to enter the accumulator cell heat preserving cabinet then in order to the hot-air refrigeration back filter dirt that the inboard air inlet 511 of cabinet is introduced.
Internal circulation heat-exchanging system 21 comprises back shroud 51, is assembled in back shroud 51 tops and aligns the inboard blower fan 56 of cabinet of the inboard air inlet 511 of cabinet and is assembled in back shroud 51 and the evaporimeter 6 between inboard air inlet 511 of cabinet and the inboard air outlet 512 of cabinet.Under compressor 9 duties, hot-air in the accumulator cell heat preserving cabinet is introduced in the internal circulation heat-exchanging system 21 by the inboard blower fan 56 of cabinet from the inboard air inlet 511 of cabinet, be expelled to accumulator cell heat preserving cabinet inside from the inboard air outlet 512 of cabinet after passing through the cooling of the cold-producing medium (refrigerant) in the evaporimeter 6 then, thereby reduce accumulator cell heat preserving cabinet temperature inside.The inboard blower fan 56 of cabinet is provided with in the face of the inboard air inlet 511 of cabinet, its role is to make enter hot-air guiding evaporimeter 6 in the internal circulation heat-exchanging system 21 cooling off, thereby and the inboard air outlet 512 of the cabinet that further leads be discharged to the inner space of accumulator cell heat preserving cabinet.Therefore the position of evaporimeter 6 is between the air channel of inboard air inlet 511 of cabinet and inboard air outlet 512 formation of cabinet.
On the condenser 7 that outer circulation heat-exchange system 22 comprises front shroud 52, align with cabinet outside air outlet 552, the base 54 that is assembled in shell body 5 and cabinet outside blower fan 8 and the compressor 9 placed side by side.Cabinet outside blower fan 8 aligns with cabinet outside air inlet 551.
In like manner, under compressor 9 duties, accumulator cell heat preserving cabinet outer air enters in the outer circulation heat-exchange system 22 through cabinet outside blower fan 8 from cabinet outside air inlet 551, and is directed to condenser 7 places.Become the hot blast that temperature raises through the accumulator cell heat preserving cabinet outer air behind the condenser 7, be discharged to the cabinet external space through cabinet outside air outlet 552 then.Condenser 7 is used for carrying out heat exchange with accumulator cell heat preserving cabinet outer air, cold-producing medium (refrigerant) that will heating in internal circulation heat-exchanging system 21 thus heat discharge accumulators insulation cabinet outer air and cooled cold-producing medium (refrigerant) is returned to continue to cool off hot-air in the rack internal circulation heat-exchanging system 21 in.Therefore, the position of condenser 7 is provided with should be between the air channel of cabinet outside air inlet 551 and air outlet 552 formation of the cabinet outside, and in preferred implementation of the present utility model, condenser 7 is arranged at and aligns air outlet 552 places, the cabinet outside.
Enter in the process that the inner air that absorbs the accumulator cell heat preserving cabinet in the evaporimeter 6 absorbs heat at the cold-producing medium of low-temp low-pressure, evaporimeter 6 is because temperature is very low, and the surface can produce the condensation phenomenon, and pools condensation flow.For solving the problem of condensed water, prevent that condensation flow is to the rack outside, contaminated environment is also brought potential safety hazard, see also Fig. 3 to Fig. 7, the utility model can pre-heated condensation water carburetor 200 comprises that being positioned at evaporimeter 6 belows and part accommodates first water-collecting tray 2 of evaporimeter 6, is positioned at second water-collecting tray 3 of first water-collecting tray, 2 belows and is installed on electrical heating vapourizing unit 4 on the base 54.
First water-collecting tray 2 is the rectangle box body, be provided with the drainage joint 20 that passes first water-collecting tray 2 and enter second water-collecting tray, 3 tops in the one end, the condensed water of the evaporimeter 6 that receives in first water-collecting tray 2 surpasses the discharge level of drainage joint 20, and then condensed water can enter second water-collecting tray 3 along drainage joint 20.
Second water-collecting tray 3 is the rectangle box body, its be positioned at first water-collecting tray 2 under, and receive the condensed water of discharging from drainage joint 20.The two bottom sides of second water-collecting tray 3 pushed down and is positioned at respectively by a pair of blast pipe 91 of compressor 9 by the pressing plate 30 of second water-collecting tray 3.Second water-collecting tray 3 also has spacing drainage joint 31, and it is arranged in an end of second water-collecting tray 3 and its inlet and is higher than blast pipe 90 and is pushed down the position of back at second water-collecting tray 3.The entrance height of spacing drainage joint 31 also is higher than the exit position of the drainage joint 20 of first water-collecting tray 2.This spacing drainage joint 31 passes second water-collecting tray 3 and enters the inside of electrical heating vapourizing unit 4 along the water inlet 421 of electrical heating vapourizing unit 4.Because the blast pipe 90 of compressor 9 has higher temperature, the condensed water that second water-collecting tray 3 is collected can be carried out preheating, in the utility model preferred implementation, condensed water can be realized about 50 degrees centigrade preheat temperature.When the height of condensed water surpasses the entrance height of spacing drainage joint 31, then enter in the electrical heating vapourizing unit 4 along spacing drainage joint 31 through the condensed water after the preheating.
Electrical heating vapourizing unit 4 is installed on the base 54 and is positioned at compressor 9 one sides, the condensed water after the preheating that it comprises metal header tank 42, be installed on the header tank 42 and header tank 42 is collected heat vaporization heater element 43, be positioned at header tank 42 1 sides and extend through header tank 42 belows with standby spacing drainage joint 44 and be coated on the header tank 42 outer heat-insulation layers 41 that are incubated.
Header tank 42 is the casing configuration, and it comprises the roof 420 that is parallel to each other and diapire 428, the left side wall 424 that is parallel to each other and right side wall and the antetheca 427 and the rear wall that are parallel to each other.
Left side wall 424 has higher height, therefore extends beyond the diapire 428 of header tank 42.The end of left side wall 424 has the installation limit 425 of outside bending.Installation limit 425 offers a pair of screw spaced apart 426 and is used for base 54 sealed by bolt.Roof 420 offers plurality of rows pore 422 and water inlet 421.Diapire 428 offers delivery port, and spacing drainage joint 44 passes this delivery port and leads to the machine cabinet air-conditioner outside.Left side wall 424 is soldered to header tank 42 other positions.
Heater element 43 is installed on antetheca 427, and it comprises fits with antetheca 427 and by the sealed tabular installation portion 431 of bolt, the heating part 433 that stretches out the outer plug 430 of installation portion 431 and extend into header tank 42 inside.
Heat-insulation layer 41 covers at outside the header tank 42 and has host cavity 410 and open front 412.Wherein, heat-insulation layer 41 bottoms offer opening 413, can allow the installation limit 425 of left side wall 424 to pass, so header tank 42 is bottom-up group and goes into heat-insulation layer 41 and be contained in the host cavity 410.The plug 430 of heater element 43 protrudes into open front 412.
After condensed water after 3 preheatings of second water-collecting tray enters header tank 42 along spacing drainage joint 31, arrive the heating water level that heater element 43 sets after, heater element 43 starts, and condensed water is heated until vaporization.Steam after the vaporization is discharged along steam vent 422.If condensed water produces too much, arrive the inlet of spacing drainage joint 44 after, then unnecessary condensed water is discharged machine cabinet air-conditioners 100 outsides by spacing drainage joint 44.
Therefore, in the utility model, compressor exhaust pipe 91 as the utility model can pre-heated condensation water vaporization apparatus 200 preheating device, earlier condensed water is preheated to about 50 degrees centigrade, and then by heater element 43 to its heating vaporization, it is nearly 1/3rd that the condensing water vapor energy consumption has been reduced, and saved the energy, and prolonged service life of electrical heating vapourizing unit 4, achieve many things at one stroke.
Special needs to be pointed out is, in the utility model specific embodiment only with this can be pre-heated condensation water vaporization apparatus 200 as example, other types can all be suitable for the principle that the utility model discloses by pre-heated condensation water vaporization apparatus in actual applications.For the person of ordinary skill of the art, that is done under instruction of the present utility model changes at equivalence of the present utility model, must be included in the scope that the utility model claim advocated.

Claims (10)

  1. One kind can pre-heated condensation water vaporization apparatus, it is characterized in that: it comprises water-collecting tray and electrical heating vapourizing unit; Water-collecting tray is collected condensed water and is had preheating device to condensed water preheating of collecting and the spacing drainage joint that the condensed water after the preheating is expelled to the electrical heating vapourizing unit; The electrical heating vapourizing unit comprises with the header tank of condensed water after above-mentioned spacing drainage joint is connected the preheating that is used to receive in the water-collecting tray and the preheating condensed water in the header tank is heated the heater element of vaporization.
  2. 2. as claimed in claim 1 can pre-heated condensation water vaporization apparatus, it is characterized in that described preheating device is the compressor exhaust pipe that is positioned in the water-collecting tray.
  3. 3. as claimed in claim 2 can pre-heated condensation water vaporization apparatus, it is characterized in that, also be provided with the pressing plate that compressor exhaust pipe is limited to the water-collecting tray bottom in the described water-collecting tray.
  4. 4. as claimed in claim 1 can pre-heated condensation water vaporization apparatus, it is characterized in that, described water-collecting tray is second water-collecting tray, also has first water-collecting tray that is positioned at second water-collecting tray top, and this first water-collecting tray is directly collected condensed water and had drainage joint condensed water is entered in second water-collecting tray.
  5. 5. as claimed in claim 1 can pre-heated condensation water vaporization apparatus, it is characterized in that described electrical heating vapourizing unit also has and is coated on the outer heat-insulation layer of header tank.
  6. 6. as claimed in claim 5 can pre-heated condensation water vaporization apparatus, it is characterized in that the header tank of described electrical heating vapourizing unit is provided with water inlet and the steam vent that is connected with the spacing drainage joint of water-collecting tray in its top.
  7. 7. as claimed in claim 1 can pre-heated condensation water vaporization apparatus, it is characterized in that the header tank bottom of described electrical heating vapourizing unit is provided with spacing drainage joint and leads to outside.
  8. 8. as claimed in claim 1 can pre-heated condensation water vaporization apparatus, it is characterized in that described header tank one sidewall has and exceeds its bottom and the outside installation limit of bending, in order to the electrical heating vapourizing unit is mounted to machine cabinet air-conditioner.
  9. 9. as claimed in claim 1 can pre-heated condensation water vaporization apparatus, it is characterized in that described heater element is fixedly installed in header tank one sidewall and has and is positioned at the outer plug of header tank and enters the heating part that the condensed water of header tank after to preheating heats vaporization.
  10. 10. one kind has machine cabinet air-conditioner that can pre-heated condensation water vaporization apparatus as claimed in claim 1, and it has housing, is contained in the evaporimeter in the housing, condenser, compressor; Compressor has blast pipe; It is characterized in that: describedly can comprise water-collecting tray and electrical heating vapourizing unit by pre-heated condensation water vaporization apparatus; Water-collecting tray is collected the condensed water of evaporimeter generation and is had preheating device to condensed water preheating of collecting and the spacing drainage joint that the condensed water after the preheating is expelled to the electrical heating vapourizing unit; The electrical heating vapourizing unit comprises with the header tank of condensed water after above-mentioned spacing drainage joint is connected the preheating that is used to receive in the water-collecting tray and the preheating condensed water in the header tank is heated the heater element of vaporization.
CN 201120020194 2011-01-21 2011-01-21 Preheating condensed water vaporizing device and cabinet air-conditioner Expired - Fee Related CN201964709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120020194 CN201964709U (en) 2011-01-21 2011-01-21 Preheating condensed water vaporizing device and cabinet air-conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120020194 CN201964709U (en) 2011-01-21 2011-01-21 Preheating condensed water vaporizing device and cabinet air-conditioner

Publications (1)

Publication Number Publication Date
CN201964709U true CN201964709U (en) 2011-09-07

Family

ID=44527250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120020194 Expired - Fee Related CN201964709U (en) 2011-01-21 2011-01-21 Preheating condensed water vaporizing device and cabinet air-conditioner

Country Status (1)

Country Link
CN (1) CN201964709U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102607153A (en) * 2011-01-21 2012-07-25 苏州昆拓热控系统股份有限公司 Preheating-type condensate water vaporing device
CN103363762A (en) * 2012-03-30 2013-10-23 Bsh博世和西门子家用电器有限公司 Refrigeration device with tiered evaporation stand
CN103512096A (en) * 2012-06-29 2014-01-15 太仓南极风能源设备有限公司 Vertical cabinet type air conditioner
CN105115139A (en) * 2015-09-15 2015-12-02 沈阳市锦金鑫科技有限公司 Cabinet air conditioner free of condensate water discharge
CN105258317A (en) * 2015-09-15 2016-01-20 沈阳市锦金鑫科技有限公司 Device and method for treating air-conditioner condensed water
CN105318509A (en) * 2015-09-15 2016-02-10 沈阳市锦金鑫科技有限公司 Control system and method for cabinet air conditioner
CN106766547A (en) * 2017-01-09 2017-05-31 广州美的华凌冰箱有限公司 The method and apparatus of air humidifying device, refrigerator, monitoring and treatment room air

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102607153A (en) * 2011-01-21 2012-07-25 苏州昆拓热控系统股份有限公司 Preheating-type condensate water vaporing device
CN103363762A (en) * 2012-03-30 2013-10-23 Bsh博世和西门子家用电器有限公司 Refrigeration device with tiered evaporation stand
CN103363762B (en) * 2012-03-30 2017-07-18 Bsh家用电器有限公司 Refrigerating appliance with vaporization layer frame
CN103512096A (en) * 2012-06-29 2014-01-15 太仓南极风能源设备有限公司 Vertical cabinet type air conditioner
CN105115139A (en) * 2015-09-15 2015-12-02 沈阳市锦金鑫科技有限公司 Cabinet air conditioner free of condensate water discharge
CN105258317A (en) * 2015-09-15 2016-01-20 沈阳市锦金鑫科技有限公司 Device and method for treating air-conditioner condensed water
CN105318509A (en) * 2015-09-15 2016-02-10 沈阳市锦金鑫科技有限公司 Control system and method for cabinet air conditioner
CN105318509B (en) * 2015-09-15 2018-01-16 沈阳市锦金鑫科技有限公司 The control system and control method of cabinet air conditioner
CN105258317B (en) * 2015-09-15 2018-05-15 沈阳市锦金鑫科技有限公司 For the device and method to air conditioner condensation water process
CN105115139B (en) * 2015-09-15 2018-12-14 沈阳市锦金鑫科技有限公司 The cabinet air conditioner of discharging evaporated condensation water
CN106766547A (en) * 2017-01-09 2017-05-31 广州美的华凌冰箱有限公司 The method and apparatus of air humidifying device, refrigerator, monitoring and treatment room air

Similar Documents

Publication Publication Date Title
CN201964709U (en) Preheating condensed water vaporizing device and cabinet air-conditioner
US8141379B2 (en) Hybrid solar air-conditioning system
CN109237910A (en) A kind of energy-saving enclosed heat pump sludge drying dehumidification system and technique
CN202927982U (en) Air conditioning system
CN104456786B (en) Evaporation cooling and mechanical refrigeration combined integrated air conditioning unit
CN108224625A (en) Data center's vertical pipe type indirect evaporation natural cooling cold supply system
CN106839494B (en) The double caloic coupling humidification dehumidification vapo(u)rization systems of heat pump and method
CN109798624B (en) Indirect evaporation internal cooling heat pump type solution fresh air dehumidifying device
CN211177289U (en) Heat pump type two-stage evaporation heat recovery fresh air handling unit
CN105466069B (en) A kind of energy-efficient direct-burning type lithium bromide absorption type hot water or cold water machine set system of heating
CN205261805U (en) Evaporation formula condensing equipment based on separated heat pipe precooling
CN201138102Y (en) Novel return energy recovery heat pump device with secondary humidifying cooling condenser
CN102607153A (en) Preheating-type condensate water vaporing device
CN104006470B (en) Evaporative cooling-direct expansion combined air-conditioner for data center
CN205843110U (en) A kind of circulating refrigeration system
CN203216313U (en) Tube indirect evaporative cooler with water film expanding plates
CN201637015U (en) Heat pump air conditioner integrating indoor air humidification and waste heat recycling
CN212108832U (en) Plate-tube indirect and separated heat pipe combined multi-stage evaporative cooling air conditioning unit
CN209512203U (en) A kind of pump type heat evaporative condenser water chiller-heater unit
CN203798185U (en) Novel shell and tube evaporative condenser
CN209588221U (en) A kind of condensate water circulatory reuse type air source heat pump dehumidifying unit
CN202561934U (en) Double-refrigerant integral type air cooling air conditioner
CN218380004U (en) Evaporated water recovery system for refrigeration system and refrigeration system
CN207065938U (en) Automotive air-conditioning condenser lid
CN216481704U (en) Evaporative condenser system capable of dispersing fog

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110907

Termination date: 20200121