CN201962781U - Sewage water inspection well - Google Patents

Sewage water inspection well Download PDF

Info

Publication number
CN201962781U
CN201962781U CN201020612779XU CN201020612779U CN201962781U CN 201962781 U CN201962781 U CN 201962781U CN 201020612779X U CN201020612779X U CN 201020612779XU CN 201020612779 U CN201020612779 U CN 201020612779U CN 201962781 U CN201962781 U CN 201962781U
Authority
CN
China
Prior art keywords
inspection shaft
water inlet
inlet pipe
shaft body
apart
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020612779XU
Other languages
Chinese (zh)
Inventor
周传喜
周伶
周宏�
范杰生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201020612779XU priority Critical patent/CN201962781U/en
Application granted granted Critical
Publication of CN201962781U publication Critical patent/CN201962781U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a sewage water inspection well, which comprises an inspection well body (1), wherein the inspection well body (1) is an integrally-precast cement inspection well, the bottom of the inspection well body (1) is arc-shaped, the radian R of the inspection well body is 550 to 1000 mm, a first water inlet pipe (2), a second water inlet pipe (3), a third water inlet pipe (4) and a water outlet pipe (5) are arranged on the inspection well body (1), and the water outlet pipe (5) is lower than the third water inlet pipe (4) and is arranged in a position opposite to the third water inlet pipe (4). The sewage water inspection well has the advantages of simple structure, convenience in construction, long service life and low cost.

Description

The sewage inspection shaft
Technical field
The utility model belongs to a kind of city and construction area internal drainage field, is specifically related to a kind of sewage inspection shaft.
Background technology
At present, it is to build by laying bricks or stones with common brick that traditional draining inspection shaft and road limit rainwater castor basement advance, and cement is smeared and formed, and not only construction is complicated, and weathering comes off in the inspection shaft body, and the well body sinks, and causes the road surface local collapse easily, and its application life is short, and cost is higher, and maintenance is inconvenient.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of simple in structure, easy construction, long service life, the sewage inspection shaft that cost is low.
The technical solution of the utility model: a kind of sewage inspection shaft, it comprises the inspection shaft body, described inspection shaft body is integral prefabricated good cement inspection shaft, the bottom shape of inspection shaft body is an arc, its radian R is 550~1000mm, basement advances body and is provided with first water inlet pipe, second water inlet pipe the 3rd water inlet pipe and outlet pipe, and outlet pipe is lower than the 3rd water inlet pipe, and is arranged on the position relative with the 3rd water inlet pipe; Outlet pipe is 20~30mm apart from inspection shaft body inwall bottom apart from I, the 3rd water inlet pipe is 30~40mm apart from inspection shaft body inwall bottom apart from J, the equal diameters of first water inlet pipe and the 3rd water inlet pipe, its diameter is 150~250mm, the diameter of the 3rd water inlet pipe is 300~400mm, the diameter of outlet pipe is 250~300mm, and the inner diameter D of inspection shaft body is 1100~2000mm, and the upper end bore C of inspection shaft body is 600mm; The top of inspection shaft body is 800~5000mm apart from its inwall diapire apart from E, first water inlet pipe, second water inlet pipe are 400~3000mm apart from inspection shaft body inwall bottom apart from F, the top of inspection shaft body is 400mm apart from its wall body bending part apart from G, and the thickness H of inspection shaft body wall is 60~140mm.
Described inspection shaft body is provided with plural first water inlet pipe.
The utility model compared with prior art has following beneficial effect: 1, construction cost is lower, and cement one-shot forming goods are saved a large amount of constructional materialss than traditional inspection shaft, have saved cost of manufacture, and the more traditional inspection shaft of construction earth volume reduces; 2, construction period has been shortened in easy construction; 3, non-efflorescing cementitious, do not come off, do not sink, reduced maintenance cost, prolonged application life.
Description of drawings
Fig. 1 is a vertical view of the present utility model;
Fig. 2 is the sectional view of Fig. 1 along the B-B hatching;
Fig. 3 is the sectional view of Fig. 1 along the A-A hatching.
The specific embodiment
A kind of sewage inspection shaft, it comprises inspection shaft body 1, described inspection shaft body 1 is integral prefabricated good cement inspection shaft, the bottom shape of inspection shaft body 1 is an arc, its radian R is 1000mm, basement advances body 1 and is provided with first water inlet pipe 2, second water inlet pipe 3 the 3rd water inlet pipe 4 and outlet pipe 5, and outlet pipe 5 is lower than the 3rd water inlet pipe 4, and is arranged on the position relative with the 3rd water inlet pipe 4; Outlet pipe 5 is 20mm apart from inspection shaft body 1 inwall bottom apart from I, the 3rd water inlet pipe 4 is 40mm apart from inspection shaft body 1 inwall bottom apart from J, the equal diameters of first water inlet pipe 2 and the 3rd water inlet pipe 4, its diameter is 250mm, the diameter of the 3rd water inlet pipe 4 is 400mm, the diameter of outlet pipe 5 is 250mm, and the inner diameter D of inspection shaft body 1 is 2000mm, and the upper end bore C of inspection shaft body 1 is 600mm; The top of inspection shaft body 1 is 5000mm apart from its inwall diapire apart from E, first water inlet pipe 2, second water inlet pipe 3 are 3000mm apart from inspection shaft body 1 inwall bottom apart from F, the top of inspection shaft body 1 is 400mm apart from its wall body bending part apart from G, and the thickness H of inspection shaft body 1 wall is 100mm.The material of described inspection shaft body 1 is the mixture of cement, fibre, silk, sand, stone.

Claims (2)

1. sewage inspection shaft, it comprises inspection shaft body (1), it is characterized in that described inspection shaft body (1) is integral prefabricated good cement inspection shaft, the bottom shape of inspection shaft body (1) is an arc, its radian R is 550~1000mm, basement advances body (1) and is provided with first water inlet pipe (2), second water inlet pipe (3) the 3rd water inlet pipe (4) and outlet pipe (5), and outlet pipe (5) is lower than the 3rd water inlet pipe (4), and is arranged on and the relative position of the 3rd water inlet pipe (4); Outlet pipe (5) is 20~30mm apart from inspection shaft body (1) inwall bottom apart from I, the 3rd water inlet pipe (4) is 30~40mm apart from inspection shaft body (1) inwall bottom apart from J, the equal diameters of first water inlet pipe (2) and the 3rd water inlet pipe (4), its diameter is 150~250mm, the diameter of the 3rd water inlet pipe (4) is 300~400mm, the diameter of outlet pipe (5) is 250~300mm, and the inner diameter D of inspection shaft body (1) is 1100~2000mm, and the upper end bore C of inspection shaft body (1) is 600mm; The top of inspection shaft body (1) is 800~5000mm apart from its inwall diapire apart from E, first water inlet pipe (2), second water inlet pipe (3) are 400~3000mm apart from inspection shaft body (1) inwall bottom apart from F, the top of inspection shaft body (1) is 400mm apart from its wall body bending part apart from G, and the thickness H of inspection shaft body (1) wall is 60~140mm.
2. sewage inspection shaft according to claim 1 is characterized in that inspection shaft body (1) is provided with plural first water inlet pipe (2).
CN201020612779XU 2010-11-16 2010-11-16 Sewage water inspection well Expired - Fee Related CN201962781U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020612779XU CN201962781U (en) 2010-11-16 2010-11-16 Sewage water inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020612779XU CN201962781U (en) 2010-11-16 2010-11-16 Sewage water inspection well

Publications (1)

Publication Number Publication Date
CN201962781U true CN201962781U (en) 2011-09-07

Family

ID=44525316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020612779XU Expired - Fee Related CN201962781U (en) 2010-11-16 2010-11-16 Sewage water inspection well

Country Status (1)

Country Link
CN (1) CN201962781U (en)

Similar Documents

Publication Publication Date Title
CN202324159U (en) Combined prefabricated reinforced concrete sewage and rainwater inspection well
CN201546313U (en) Landscape pebble apron with water drainage ditch
CN201962781U (en) Sewage water inspection well
CN201362857Y (en) Combined type concrete inspection well
CN102296633A (en) Prefabricating pipe shaft
CN102322096A (en) Building drainage energy dissipating plastic manhole
CN205549702U (en) Tertiary sedimentation tank of assembled
CN204530375U (en) Novel interlocked impervious concrete precast curb
CN202280144U (en) Building drainage energy-dissipation plastic inspection well
CN202672331U (en) Prefabricated reinforced concrete circular grit well
CN201738429U (en) Drainage inspection well
CN202577351U (en) Multi-use combined plastic inspection well
CN202000463U (en) Prefabricated reinforced concrete drainage inspection well
CN201292668Y (en) Mold for controlling thickness of concrete inner wall
CN201437581U (en) Reinforced concrete slope-shaped water drainage pipe for highroad
CN201970393U (en) Forming die for drain pipe at rigid joint rabbet
CN206512734U (en) A kind of concrete inspection well with base
CN205776323U (en) Prefabricated information facility pedestal
CN203383317U (en) Vertical rainwater pipeline with easiness of settling silt on outer side
CN202529960U (en) Reinforced concrete precasting socket connector fast-assembly septic tank
CN101725177A (en) Drainage inspection well
CN203769044U (en) Waterproof floor drain structure with secondary water discharge pipe
CN202450614U (en) Precast concrete inspection shaft
CN202913505U (en) Sewage treatment unit of reinforced concrete prefabricating wedge-shaped port
CN202247822U (en) Drain pipe for farmlands

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110907

Termination date: 20131116