CN201943749U - Underground waste rock high-pressure concrete pumping filling system - Google Patents

Underground waste rock high-pressure concrete pumping filling system Download PDF

Info

Publication number
CN201943749U
CN201943749U CN2011200168042U CN201120016804U CN201943749U CN 201943749 U CN201943749 U CN 201943749U CN 2011200168042 U CN2011200168042 U CN 2011200168042U CN 201120016804 U CN201120016804 U CN 201120016804U CN 201943749 U CN201943749 U CN 201943749U
Authority
CN
China
Prior art keywords
filling
concrete
hopper
waste rock
concrete pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200168042U
Other languages
Chinese (zh)
Inventor
袁梅芳
邓家军
薛峰
杨文忠
李印洪
刘伟强
郭世伟
黄建旗
曹哓平
杨自然
姚银佩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Baoshan Nonferrous Metals & Minerals Co Ltd
HUNAN LABOUR PROTECTION INSTITUTE OF NONFERROUS METALS
Original Assignee
Hunan Baoshan Nonferrous Metals & Minerals Co Ltd
HUNAN LABOUR PROTECTION INSTITUTE OF NONFERROUS METALS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Baoshan Nonferrous Metals & Minerals Co Ltd, HUNAN LABOUR PROTECTION INSTITUTE OF NONFERROUS METALS filed Critical Hunan Baoshan Nonferrous Metals & Minerals Co Ltd
Priority to CN2011200168042U priority Critical patent/CN201943749U/en
Application granted granted Critical
Publication of CN201943749U publication Critical patent/CN201943749U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to an underground waste rock high-pressure concrete pumping filling system which comprises a vibration feeder, a hopper, a slide rail, a stirrer, a concrete pump and a filling pipe; a groove-type channel at the lower part of the vibration feeder is communicated with the hopper; the slide rail communicates the hopper and the stirrer; the lower part of the stirrer is communicated with the concrete pump through a pipeline; the concrete pump and the filling pipe are connected through the pipeline; and the underground waste rock high-pressure concrete pumping filling system directly uses crushed waste rock for an underground concrete high-pressure pumping filling gob, so that the pollution of waste rock solid to the ground surface environment can be avoided, the strength of a stope filling body is improved, and the filling water is reduced.

Description

A kind of deads high pressure pumping concrete filling system
Technical field
The utility model relates to barren rock high pressure pumping concrete filling system, is specially a kind of deads high pressure pumping concrete filling system.
Background technology
Underground metal mine generally the Filling Station construction on ground, casting resin is transported to the goaf by filling pipe under the effect of casting resin deadweight.Owing to the filling pipeline is longer, the tube washing water after lead the way water and the filling before the filling is more, causes strength of filling mass low, reduces the intensity of country rock, increases the pressure of draining, and filling pipeline gravity flow conveying filling concentration can not be too high, and water content is also bigger.Present homemade all kinds of sand pumps, the casting resin of long-term delivery high concentration has certain difficulty, and it mainly is to utilize a times line deadweight to carry that homogeneous flow is carried.Build Filling Station because stowing gradient is less in the down-hole, so the conveying casting resin of can not flowing automatically needs to adopt mechanical high-pressure delivery.General Filling Station need excavate bigger chamber when building in the down-hole greatly.
The utility model content
The technical problem that the utility model solved is to provide a kind of deads high pressure pumping concrete filling system, to solve the shortcoming in the above-mentioned background technology.
The technical problem that the utility model solved realizes by the following technical solutions:
A kind of deads high pressure pumping concrete filling system, involving vibrations feeder, hopper, slide rail, mixer, concrete pump and filling pipe, the slot type passage of described oscillating feeder bottom is communicated with hopper, described slide rail is communicated with hopper with mixer, described mixer bottom is communicated with by pipeline with concrete pump, described concrete pump is connected by pipeline with filling pipe, and the high-pressure blast purge means is arranged in the concrete pump between described mixer and the filling pipe.
Beneficial effect
The utility model is directly used in High Pressure Reinforced Concrete pumping bashing in down-hole to broken barren rock, can stop barren rock solid pollution ground surface environment, improves stope filling body intensity, has reduced the filling water.
Description of drawings
Fig. 1 is a schematic diagram of the present utility model.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
A kind of deads high pressure pumping concrete filling system, involving vibrations feeder 1, hopper 2, slide rail 3, mixer 4, concrete pump 5 and filling pipe 6, the slot type passage of described oscillating feeder 1 bottom is communicated with hopper 2, described slide rail 3 is communicated with hopper 2 with mixer 4, described mixer 4 bottoms and concrete pump 5 are communicated with by pipeline, described concrete pump 5 and filling pipe 6 are connected by pipeline, in the concrete pump 5 between described mixer 4 and the filling pipe 6 the high-pressure blast purge means are arranged.
During operation, raw material comes out from the flute profile passage of oscillating feeder 1 lower end, the slot type passage of described oscillating feeder 1 bottom can up-down adjustment, guarantee rational filler transportation, the filler that comes out from the flute profile passage of oscillating feeder 1 lower end enters into hopper 2, when filler runs up to a certain degree, slide rail 3 can be transported to filler the last end entrance of mixer 4, the filler that enters in the mixer 4 fully stirs in mixer 4, the filler that stirs from the exit, lower end of mixer 4 by pipeline transport to concrete pump 5, under the effect of concrete pump 5, filler is processed into the concrete-like material, and be transported in the filling pipe 6, the mass transport of coming out from filling pipe 6 realizes the stope filling operation to stope.
More than show and described basic principle of the present utility model and principal character and advantage of the present utility model; the technician of the industry should understand; the utility model is not restricted to the described embodiments; that describes in the foregoing description and the manual just illustrates principle of the present utility model; under the prerequisite that does not break away from the utility model spirit and scope; the utility model also has various changes and modifications; these changes and improvements all fall in claimed the utility model scope, and the claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (2)

1. deads high pressure pumping concrete filling system, involving vibrations feeder, hopper, slide rail, mixer, concrete pump and filling pipe, it is characterized in that, the slot type passage of described oscillating feeder bottom is communicated with hopper, described slide rail is communicated with hopper with mixer, described mixer bottom is communicated with by pipeline with concrete pump, and described concrete pump is connected by pipeline with filling pipe.
2. a kind of deads high pressure pumping concrete filling system according to claim 1 is characterized in that the high-pressure blast purge means is arranged in the concrete pump between described mixer and the filling pipe.
CN2011200168042U 2011-01-19 2011-01-19 Underground waste rock high-pressure concrete pumping filling system Expired - Fee Related CN201943749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200168042U CN201943749U (en) 2011-01-19 2011-01-19 Underground waste rock high-pressure concrete pumping filling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200168042U CN201943749U (en) 2011-01-19 2011-01-19 Underground waste rock high-pressure concrete pumping filling system

Publications (1)

Publication Number Publication Date
CN201943749U true CN201943749U (en) 2011-08-24

Family

ID=44471098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200168042U Expired - Fee Related CN201943749U (en) 2011-01-19 2011-01-19 Underground waste rock high-pressure concrete pumping filling system

Country Status (1)

Country Link
CN (1) CN201943749U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590851A (en) * 2013-10-25 2014-02-19 玉溪矿业有限公司 Underground waste-rock concrete preparation, pumping and filling system and method
CN113685226A (en) * 2021-07-20 2021-11-23 北京科技大学 Layered filling body protection device and method suitable for upward horizontal access filling method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590851A (en) * 2013-10-25 2014-02-19 玉溪矿业有限公司 Underground waste-rock concrete preparation, pumping and filling system and method
CN113685226A (en) * 2021-07-20 2021-11-23 北京科技大学 Layered filling body protection device and method suitable for upward horizontal access filling method
CN113685226B (en) * 2021-07-20 2022-03-29 北京科技大学 Layered filling body protection device and method suitable for upward horizontal access filling method

Similar Documents

Publication Publication Date Title
CN102418555A (en) Method for filling mine goaf by utilizing high-concentration all tailing cement
CN102182468B (en) Method and device for solidifying water-filling cracking surrounding rocks of tunnel by adopting high-pressure air water-dispelling grouting
CN112814732A (en) Preparation of mixed ground paste of barren rock and tailings and pump sending filling device
CN105834012A (en) Continuous preparation system and preparation technology of whole grain grade tailing cemented filling slurry
CN102434204A (en) Mine waste rock and all tailing pipeline conveying filling system and filling method using same
CN103306719B (en) Coal mine underground drilled hole filling and reinforcing device and method
CN102628352A (en) Multi-section fixed point hydraulic fracturing method
CN103133033A (en) Mine phosphogypsum cemented fill slurrying process
CN107191222B (en) A kind of device and method using pressure-air conveying lotion
CN201943749U (en) Underground waste rock high-pressure concrete pumping filling system
CN201041053Y (en) Quarry filling pipeline quick cleaning device
CN105525945A (en) High-concentration full-tailing cementing continuous filling device and method
CN205628313U (en) Wholegrain level tailings consolidated fill ground paste is system of preparing in succession
CN105064974B (en) Static mixing system and fracturing blender truck
CN113460562A (en) Method for sealing coal-electricity fly ash in abandoned mined-out space of coal mine
CN210875766U (en) Tailless mine separation and filling system based on skid-mounted all-in-one machine
CN201763388U (en) Foam mortar preparation device
CN214303937U (en) Preparation of mixed ground paste of barren rock and tailings and pump sending filling device
CN207740012U (en) A kind of synchronous grouting mortar vehicle for shield-tunneling construction
CN203223249U (en) Deep well slurry full-pipe gravity-flow mobile pumped filling system
CN204199712U (en) A kind of device preventing Plugging Accident of Pump Concrete
CN205558931U (en) Automatic slip casting device of underground mine
CN209510385U (en) One kind, which is adopted, fills integral type goaf filling system
CN211900690U (en) Paste filling and mining complete equipment
CN205297644U (en) Device is filled in succession in full tailings gluing of high concentration on non - colliery mountain

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110824