CN201943749U - Underground waste rock high-pressure concrete pumping filling system - Google Patents
Underground waste rock high-pressure concrete pumping filling system Download PDFInfo
- Publication number
- CN201943749U CN201943749U CN2011200168042U CN201120016804U CN201943749U CN 201943749 U CN201943749 U CN 201943749U CN 2011200168042 U CN2011200168042 U CN 2011200168042U CN 201120016804 U CN201120016804 U CN 201120016804U CN 201943749 U CN201943749 U CN 201943749U
- Authority
- CN
- China
- Prior art keywords
- filling
- concrete
- hopper
- waste rock
- concrete pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to an underground waste rock high-pressure concrete pumping filling system which comprises a vibration feeder, a hopper, a slide rail, a stirrer, a concrete pump and a filling pipe; a groove-type channel at the lower part of the vibration feeder is communicated with the hopper; the slide rail communicates the hopper and the stirrer; the lower part of the stirrer is communicated with the concrete pump through a pipeline; the concrete pump and the filling pipe are connected through the pipeline; and the underground waste rock high-pressure concrete pumping filling system directly uses crushed waste rock for an underground concrete high-pressure pumping filling gob, so that the pollution of waste rock solid to the ground surface environment can be avoided, the strength of a stope filling body is improved, and the filling water is reduced.
Description
Technical field
The utility model relates to barren rock high pressure pumping concrete filling system, is specially a kind of deads high pressure pumping concrete filling system.
Background technology
Underground metal mine generally the Filling Station construction on ground, casting resin is transported to the goaf by filling pipe under the effect of casting resin deadweight.Owing to the filling pipeline is longer, the tube washing water after lead the way water and the filling before the filling is more, causes strength of filling mass low, reduces the intensity of country rock, increases the pressure of draining, and filling pipeline gravity flow conveying filling concentration can not be too high, and water content is also bigger.Present homemade all kinds of sand pumps, the casting resin of long-term delivery high concentration has certain difficulty, and it mainly is to utilize a times line deadweight to carry that homogeneous flow is carried.Build Filling Station because stowing gradient is less in the down-hole, so the conveying casting resin of can not flowing automatically needs to adopt mechanical high-pressure delivery.General Filling Station need excavate bigger chamber when building in the down-hole greatly.
The utility model content
The technical problem that the utility model solved is to provide a kind of deads high pressure pumping concrete filling system, to solve the shortcoming in the above-mentioned background technology.
The technical problem that the utility model solved realizes by the following technical solutions:
A kind of deads high pressure pumping concrete filling system, involving vibrations feeder, hopper, slide rail, mixer, concrete pump and filling pipe, the slot type passage of described oscillating feeder bottom is communicated with hopper, described slide rail is communicated with hopper with mixer, described mixer bottom is communicated with by pipeline with concrete pump, described concrete pump is connected by pipeline with filling pipe, and the high-pressure blast purge means is arranged in the concrete pump between described mixer and the filling pipe.
Beneficial effect
The utility model is directly used in High Pressure Reinforced Concrete pumping bashing in down-hole to broken barren rock, can stop barren rock solid pollution ground surface environment, improves stope filling body intensity, has reduced the filling water.
Description of drawings
Fig. 1 is a schematic diagram of the present utility model.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
A kind of deads high pressure pumping concrete filling system, involving vibrations feeder 1, hopper 2, slide rail 3, mixer 4, concrete pump 5 and filling pipe 6, the slot type passage of described oscillating feeder 1 bottom is communicated with hopper 2, described slide rail 3 is communicated with hopper 2 with mixer 4, described mixer 4 bottoms and concrete pump 5 are communicated with by pipeline, described concrete pump 5 and filling pipe 6 are connected by pipeline, in the concrete pump 5 between described mixer 4 and the filling pipe 6 the high-pressure blast purge means are arranged.
During operation, raw material comes out from the flute profile passage of oscillating feeder 1 lower end, the slot type passage of described oscillating feeder 1 bottom can up-down adjustment, guarantee rational filler transportation, the filler that comes out from the flute profile passage of oscillating feeder 1 lower end enters into hopper 2, when filler runs up to a certain degree, slide rail 3 can be transported to filler the last end entrance of mixer 4, the filler that enters in the mixer 4 fully stirs in mixer 4, the filler that stirs from the exit, lower end of mixer 4 by pipeline transport to concrete pump 5, under the effect of concrete pump 5, filler is processed into the concrete-like material, and be transported in the filling pipe 6, the mass transport of coming out from filling pipe 6 realizes the stope filling operation to stope.
More than show and described basic principle of the present utility model and principal character and advantage of the present utility model; the technician of the industry should understand; the utility model is not restricted to the described embodiments; that describes in the foregoing description and the manual just illustrates principle of the present utility model; under the prerequisite that does not break away from the utility model spirit and scope; the utility model also has various changes and modifications; these changes and improvements all fall in claimed the utility model scope, and the claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (2)
1. deads high pressure pumping concrete filling system, involving vibrations feeder, hopper, slide rail, mixer, concrete pump and filling pipe, it is characterized in that, the slot type passage of described oscillating feeder bottom is communicated with hopper, described slide rail is communicated with hopper with mixer, described mixer bottom is communicated with by pipeline with concrete pump, and described concrete pump is connected by pipeline with filling pipe.
2. a kind of deads high pressure pumping concrete filling system according to claim 1 is characterized in that the high-pressure blast purge means is arranged in the concrete pump between described mixer and the filling pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200168042U CN201943749U (en) | 2011-01-19 | 2011-01-19 | Underground waste rock high-pressure concrete pumping filling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200168042U CN201943749U (en) | 2011-01-19 | 2011-01-19 | Underground waste rock high-pressure concrete pumping filling system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201943749U true CN201943749U (en) | 2011-08-24 |
Family
ID=44471098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200168042U Expired - Fee Related CN201943749U (en) | 2011-01-19 | 2011-01-19 | Underground waste rock high-pressure concrete pumping filling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201943749U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590851A (en) * | 2013-10-25 | 2014-02-19 | 玉溪矿业有限公司 | Underground waste-rock concrete preparation, pumping and filling system and method |
CN113685226A (en) * | 2021-07-20 | 2021-11-23 | 北京科技大学 | Layered filling body protection device and method suitable for upward horizontal access filling method |
-
2011
- 2011-01-19 CN CN2011200168042U patent/CN201943749U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590851A (en) * | 2013-10-25 | 2014-02-19 | 玉溪矿业有限公司 | Underground waste-rock concrete preparation, pumping and filling system and method |
CN113685226A (en) * | 2021-07-20 | 2021-11-23 | 北京科技大学 | Layered filling body protection device and method suitable for upward horizontal access filling method |
CN113685226B (en) * | 2021-07-20 | 2022-03-29 | 北京科技大学 | Layered filling body protection device and method suitable for upward horizontal access filling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102418555A (en) | Method for filling mine goaf by utilizing high-concentration all tailing cement | |
CN102182468B (en) | Method and device for solidifying water-filling cracking surrounding rocks of tunnel by adopting high-pressure air water-dispelling grouting | |
CN112814732A (en) | Preparation of mixed ground paste of barren rock and tailings and pump sending filling device | |
CN105834012A (en) | Continuous preparation system and preparation technology of whole grain grade tailing cemented filling slurry | |
CN102434204A (en) | Mine waste rock and all tailing pipeline conveying filling system and filling method using same | |
CN103306719B (en) | Coal mine underground drilled hole filling and reinforcing device and method | |
CN102628352A (en) | Multi-section fixed point hydraulic fracturing method | |
CN103133033A (en) | Mine phosphogypsum cemented fill slurrying process | |
CN107191222B (en) | A kind of device and method using pressure-air conveying lotion | |
CN201943749U (en) | Underground waste rock high-pressure concrete pumping filling system | |
CN201041053Y (en) | Quarry filling pipeline quick cleaning device | |
CN105525945A (en) | High-concentration full-tailing cementing continuous filling device and method | |
CN205628313U (en) | Wholegrain level tailings consolidated fill ground paste is system of preparing in succession | |
CN105064974B (en) | Static mixing system and fracturing blender truck | |
CN113460562A (en) | Method for sealing coal-electricity fly ash in abandoned mined-out space of coal mine | |
CN210875766U (en) | Tailless mine separation and filling system based on skid-mounted all-in-one machine | |
CN201763388U (en) | Foam mortar preparation device | |
CN214303937U (en) | Preparation of mixed ground paste of barren rock and tailings and pump sending filling device | |
CN207740012U (en) | A kind of synchronous grouting mortar vehicle for shield-tunneling construction | |
CN203223249U (en) | Deep well slurry full-pipe gravity-flow mobile pumped filling system | |
CN204199712U (en) | A kind of device preventing Plugging Accident of Pump Concrete | |
CN205558931U (en) | Automatic slip casting device of underground mine | |
CN209510385U (en) | One kind, which is adopted, fills integral type goaf filling system | |
CN211900690U (en) | Paste filling and mining complete equipment | |
CN205297644U (en) | Device is filled in succession in full tailings gluing of high concentration on non - colliery mountain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |