CN201943417U - Positioning device for installing cross arm - Google Patents

Positioning device for installing cross arm Download PDF

Info

Publication number
CN201943417U
CN201943417U CN2010206726438U CN201020672643U CN201943417U CN 201943417 U CN201943417 U CN 201943417U CN 2010206726438 U CN2010206726438 U CN 2010206726438U CN 201020672643 U CN201020672643 U CN 201020672643U CN 201943417 U CN201943417 U CN 201943417U
Authority
CN
China
Prior art keywords
hasp
frame plate
carrier frame
anchor ear
hoop band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206726438U
Other languages
Chinese (zh)
Inventor
刘力中
张歆炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qiqihaer Electric Power Bureau
State Grid Corp of China SGCC
Original Assignee
Qiqihaer Electric Power Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qiqihaer Electric Power Bureau filed Critical Qiqihaer Electric Power Bureau
Priority to CN2010206726438U priority Critical patent/CN201943417U/en
Application granted granted Critical
Publication of CN201943417U publication Critical patent/CN201943417U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a positioning device for installing cross arms and is suitable for positioning the cross arms when a table bracket of a power distribution system wire rod is installed. The positioning device comprises a hoop band (4), a hasp (1), a bracket plate (2), a buckling hook (3) in the shape of a closed E and a bracket plate (5), wherein the hoop band (4) is provided with a spring hasp so that the hoop band is convenient to disassemble, assemble and reuse; the hasp and the bracket plate (2) are fixed at one end head of the hoop band; one surface of the bracket plate (2) is stuck on a wire rod after the hoop band is tightly buckled, and the other surface is vertical to the wire rod to form a horizontal plane to play the role of lifting the cross arm; one surface of the other bracket plate (5) is annularly sheathed on the hoop band to adjust the position of the bracket plate along with the hoop band; after the hoop band is tightly buckled, two sides of an electric pole are ensured to be provided with the bracket plates; the other end of the hoop band is provided with the buckling hook in the shape of the closed E, and the buckling hook is penetrated on the hoop band; and a hook on the buckling hook in the shape of the closed E is hooked and connected with the hasp on the other end and is tightly buckled after length is adjusted, so that a spring in the hasp is under a pressing state, and the hoop band is tightly hooped on the wire rod which amounts to tie a hoop on the wire rod.

Description

A kind of cross-arm is installed and is used positioner
Technical field
The utility model is applicable to the cross-arm location when electrical distribution system line bar becomes the installation of platform carriage.
Background technology
At present, the difficult control in location when known cross-arm is in the past installed, in cross-arm work is installed, particularly become long heavier cross-arms such as platform carriage cross-arm, cross-arm is fixing difficult by the precalculated position exactly on individual bar, all be that cross-arm is placed on the waist rope in the past, it is fastening to penetrate screw then, because action of gravity, cross-arm is always to downslide, when surpassing the installation site, upwards lift difficulty more.
Summary of the invention
In order to overcome the deficiency of above-mentioned work on hand method, the utility model provides a kind of cross-arm to install hereby and uses positioner, this device is easy to use, efficient is high, accurate positioning, laborsaving, be easy to carry.
The technical scheme that its technical problem that solves the utility model adopts is: adopt a kind of cross-arm to install with location anchor ear band, comprise and use automobile railway carriage or compartment snap lock on the anchor ear band, easy disassembly is repeatedly used, hasp is fixed on the termination of anchor ear band with a carrier frame plate, carrier frame plate curves 90 degree right angles, after the anchor ear bracelet is tight carrier frame plate simultaneously is attached on the line bar, another side and line bar be vertical to become a horizontal plane, play the effect of lifting cross-arm, another carrier frame plate simultaneously circularizes cover and is through on the anchor ear band, can adjust the position along the anchor ear band, the tight back of anchor ear bracelet guarantees that all there is carrier frame plate the both sides of electric pole, the anchor ear band other end is provided with one " day " font clasp, be through on the anchor ear band, promptly can on the anchor ear band, adjust extension position, can guarantee that again position, the tight back of anchor ear bracelet is motionless, hook on " day " font clasp, link with the hasp of the other end, adjust the length fastening, make the spring in the hasp be in impaction state, because the effect of elastic force, the anchor ear band binds round on the online bar tightly, be difficult to be equivalent to anchor ear on the line leverage to lower slider.This cross-arm is installed and with location anchor ear band carrier frame plate installed securely to do positioning supports for cross-arm, thereby cross-arm is installed rapidly and accurately, treat that cross-arm installs after, open snap lock and can unload cross-arm and install with locating the anchor ear band and prepare against and reuse.
This cross-arm is installed with positioner and is comprised anchor ear band (4), hasp (1), carrier frame plate (2), " day " font clasp (3), carrier frame plate (5) composition, snap lock (1) is fixed on the termination of anchor ear band (4) with carrier frame plate (2), carrier frame plate (5) cover is through on the anchor ear band, and anchor ear band (4) other end passes " day " font clasp (3); Middle in working order anchor ear band (4) fastening, carrier frame plate (2) one side is attached on the line bar, and another side and line bar be vertical to become a horizontal plane, and carrier frame plate (5) overlaps to be through on the anchor ear band adjusts the position, all there is carrier frame plate the both sides that guarantee the line bar, and two carrier frame plate supports are on same horizontal plane; " day " font clasp (3) links with the hasp (1) of the other end in working order, adjust hasp (1) fastening after the length, on the online bar of anchor ear band (4) lock ring (5) under the effect of hasp (1), do positioning supports for the cross-arm installation on the fastening online bar in carrier frame plate (2) and (5).
The beneficial effects of the utility model are: compare with prior art easy to use, efficient is high, accurate positioning, laborsaving, be easy to carry.
Below in conjunction with the drawings and specific embodiments the utility model is described further, but not as to qualification of the present utility model.
Description of drawings
Fig. 1 is the utility model embodiment overall work view;
Fig. 2 is a cross-arm working state schematic representation on the hasp place carrier frame plate;
Fig. 3 overlaps cross-arm working state schematic representation on the carrier frame plate that is through on the anchor ear band;
1. snap locks among the figure; 2. hasp place carrier frame plate; 3. " day " font clasp; 4. anchor ear band; 5. the carrier frame plate of can transposing; 6. line bar; 7. angle steel formula cross-arm; 8. angle steel formula cross-arm; 9. fixing cross-arm bolt.
The specific embodiment
On the online bar of anchor ear strap, carrier frame plate (2) one side is attached on the line bar, another side and line bar be vertical to become a horizontal plane, another carrier frame plate (5) one side cover is through on the anchor ear band, adjust the position along the anchor ear band, buckle well the back and guarantee that all there is carrier frame plate the both sides of electric pole, two carrier frame plate supports are on same horizontal plane, " day " font clasp (3) of the anchor ear band other end, be through on the anchor ear band (4), link with hasp (1), adjust length hasp (1) fastening, make the spring in the hasp (1) be in impaction state, under the effect of elastic force, anchor ear band (4) binds round on the online bar (5) tightly, carrier frame plate (2) and (5) are installed for cross-arm securely and are done positioning supports, thereby cross-arm (8) is installed rapidly and accurately, treat that cross-arm (8) installs after, open snap lock (1) and unload cross-arm and install to prepare against and reuse with location anchor ear band.

Claims (3)

1. a cross-arm is installed and is used positioner, it is characterized in that: comprise anchor ear band (4), hasp (1), carrier frame plate (2), " day " font clasp (3), carrier frame plate (5) composition, hasp (1) is fixed on the termination of anchor ear band (4) with carrier frame plate (2), carrier frame plate (5) cover is through on the anchor ear band, and anchor ear band (4) other end passes " day " font clasp (3).
2. a kind of cross-arm according to claim 1 is installed and is used positioner, it is characterized in that: anchor ear band (4) fastening in working order, carrier frame plate (2) one side is attached on the line bar, another side and line bar be vertical to become a horizontal plane, carrier frame plate (5) cover is through on the anchor ear band adjusts the position, all there is carrier frame plate the both sides that guarantee the line bar, and two carrier frame plate supports are on same horizontal plane.
3. a kind of cross-arm according to claim 1 is installed and is used positioner, it is characterized in that: " day " font clasp (3) links with the hasp (1) of the other end in working order, adjust hasp (1) fastening after the length, on the online bar of anchor ear band (4) lock ring (5) under the effect of hasp (1), do positioning supports for the cross-arm installation on the fastening online bar in carrier frame plate (2) and (5).
CN2010206726438U 2010-12-21 2010-12-21 Positioning device for installing cross arm Expired - Lifetime CN201943417U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206726438U CN201943417U (en) 2010-12-21 2010-12-21 Positioning device for installing cross arm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206726438U CN201943417U (en) 2010-12-21 2010-12-21 Positioning device for installing cross arm

Publications (1)

Publication Number Publication Date
CN201943417U true CN201943417U (en) 2011-08-24

Family

ID=44470766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206726438U Expired - Lifetime CN201943417U (en) 2010-12-21 2010-12-21 Positioning device for installing cross arm

Country Status (1)

Country Link
CN (1) CN201943417U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535933A (en) * 2010-12-21 2012-07-04 齐齐哈尔电业局 Positioning device for cross arm mounting
CN102664377A (en) * 2012-05-09 2012-09-12 重庆市电力公司市区供电局 Double-cross arm assembler for single lever and double-cross arm mounting method
CN102701107A (en) * 2012-06-20 2012-10-03 吉林省电力有限公司吉林供电公司 Lifting bracket for installation of disconnecting switch mechanism
CN106351502A (en) * 2016-10-27 2017-01-25 国网福建省电力有限公司 10kV electric power tower moving type T-connection cross arm and use method thereof
CN108730733A (en) * 2017-04-24 2018-11-02 国网新疆电力公司塔城供电公司 Holding pole device and measurement assembly
CN110315264A (en) * 2019-07-16 2019-10-11 江南造船(集团)有限责任公司 A kind of positioning device and localization method of cable tray
CN111633601A (en) * 2020-06-11 2020-09-08 姚超 Installation and construction method for power fittings of overhead line power engineering

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535933A (en) * 2010-12-21 2012-07-04 齐齐哈尔电业局 Positioning device for cross arm mounting
CN102535933B (en) * 2010-12-21 2014-06-04 齐齐哈尔电业局 Positioning device for cross arm mounting
CN102664377A (en) * 2012-05-09 2012-09-12 重庆市电力公司市区供电局 Double-cross arm assembler for single lever and double-cross arm mounting method
CN102664377B (en) * 2012-05-09 2014-11-12 重庆市电力公司市区供电局 Double-cross arm assembler for single lever and double-cross arm mounting method
CN102701107A (en) * 2012-06-20 2012-10-03 吉林省电力有限公司吉林供电公司 Lifting bracket for installation of disconnecting switch mechanism
CN106351502A (en) * 2016-10-27 2017-01-25 国网福建省电力有限公司 10kV electric power tower moving type T-connection cross arm and use method thereof
CN108730733A (en) * 2017-04-24 2018-11-02 国网新疆电力公司塔城供电公司 Holding pole device and measurement assembly
CN110315264A (en) * 2019-07-16 2019-10-11 江南造船(集团)有限责任公司 A kind of positioning device and localization method of cable tray
CN110315264B (en) * 2019-07-16 2021-06-15 江南造船(集团)有限责任公司 Positioning device and positioning method of cable bracket
CN111633601A (en) * 2020-06-11 2020-09-08 姚超 Installation and construction method for power fittings of overhead line power engineering

Similar Documents

Publication Publication Date Title
CN201943417U (en) Positioning device for installing cross arm
CN102535933B (en) Positioning device for cross arm mounting
CN201315445Y (en) Slinger fixing device for hanging iron tower angle steel pulley
CN202379595U (en) Hoisting tool for C-shaped web of wind-driven generator blade
CN201774185U (en) Adjustable lifter of power transmission line overhead ground wire
CN204538469U (en) Diagonal-bracing type line lever switch support
CN202178529U (en) Jack-up fixture for tower
CN204597302U (en) A kind of regulator cubicle erecting device
CN203596548U (en) Replacing work tool for power transmission line stockbridge damper
CN203308166U (en) Cross arm dismounting and mounting aid
CN203428741U (en) Rail clamping device
CN201964100U (en) Hanging and connecting device
CN101934985A (en) Windproof stay rope device
CN204243620U (en) A kind of pre-twisting type overhang installation wire lifting device
CN209025460U (en) A kind of efficient prestress wire tensioning equipment
CN204068021U (en) Line of power wedge line arc device
CN203474223U (en) Hoisting tool for steam generator of nuclear power plant
CN107285245A (en) Assembly type blade tip clamps apparatus for examination and repair
CN206859799U (en) Special purpose device is changed in a kind of 500kV Guywire towers bracing wire
CN204904721U (en) A perfect after -sales service tablet ware for overhead transmission line iron tower
CN209730646U (en) A kind of vibration damper on power transmission line mounting device
CN203284092U (en) Transformer substation insulator lifting frame
CN204112748U (en) Roof truss secondary member suspender
CN203598389U (en) High-altitude falling prevention device
CN202400775U (en) Movable anti-slip multifunctional manual hoisting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: QIQIHAR ELECTRIC POWER BUREAU

Effective date: 20130729

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: QIQIHAR ELECTRIC POWER BUREAU

Effective date: 20130729

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 161005 QIQIHAR, HEILONGJIANG PROVINCE TO: 100031 DONGCHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130729

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Patentee after: State Grid Corporation of China

Patentee after: Qiqihaer Electric Power Bureau

Address before: 161005 No. 288 South Road, Heilongjiang, Qigihar

Patentee before: Qiqihaer Electric Power Bureau

AV01 Patent right actively abandoned

Granted publication date: 20110824

Effective date of abandoning: 20140604

RGAV Abandon patent right to avoid regrant