CN201943064U - 一种排水管桩 - Google Patents

一种排水管桩 Download PDF

Info

Publication number
CN201943064U
CN201943064U CN2010206497725U CN201020649772U CN201943064U CN 201943064 U CN201943064 U CN 201943064U CN 2010206497725 U CN2010206497725 U CN 2010206497725U CN 201020649772 U CN201020649772 U CN 201020649772U CN 201943064 U CN201943064 U CN 201943064U
Authority
CN
China
Prior art keywords
pile
tubular pile
apertures
aperture
pile tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206497725U
Other languages
English (en)
Inventor
徐小庆
谭祥韶
薜威
许发明
王业荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRCC Harbour and Channel Engineering Bureau Group Co Ltd
Original Assignee
GUANGDONG HANGSHENG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG HANGSHENG CONSTRUCTION GROUP CO Ltd filed Critical GUANGDONG HANGSHENG CONSTRUCTION GROUP CO Ltd
Priority to CN2010206497725U priority Critical patent/CN201943064U/zh
Application granted granted Critical
Publication of CN201943064U publication Critical patent/CN201943064U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本实用新型涉及一种排水管桩,该排水管桩是在预制管桩桩壁设置一定数量的贯穿管壁的小孔,小孔的直径为5~15mm,小孔的孔间距为0.3~1.0m,同一横断面上小孔的数量不超过3个,地基中地下水可以通过小孔流入管桩桩孔内,并通过管桩桩孔排走,但地基中土体不会通过小孔进入管桩桩孔内;采用该种排水管桩,促进了地基中超静孔隙水压力的消散,减少了挤土效应和减少了工后沉降,提高了工程质量,降低了工程造价。

Description

一种排水管桩
技术领域
本实用新型涉及一种排水管桩,具体涉及一种可以消散超静孔隙水压力、减少挤土效应和工后沉降的排水管桩,属于地基处理技术领域。
背景技术
预制管桩由于自身的质量容易保证,单桩的承载力高,而被广泛的应用于施工工程中,经常被用于地基处理施工中,在黏性土地基中施工管桩时,会在地基中产生超静孔隙水压力,造成侧向位移或地面隆起,可能造成断桩、桩身倾斜等工程事故,对工程施工质量产生很大的影响,甚至造成不可弥补的损失。
预制管桩复合地基桩间土承担荷载较大时或地基土是欠固结时,桩间土存在超静孔隙水压力,如果不在桩间设置竖向排水体,地基工后沉降可能较大。
为了避免或减少上述不利影响,通常需要先在地基中设置竖向排水体,并采取跳桩施工工艺等措施,跳桩施工工艺相对比较复杂,使得施工操作复杂、施工成本高。
发明内容
本实用新型的目的是提供一种操作简单,能有效消散超静孔隙水压力,减少挤土效应和工后沉降的排水管桩。
为了解决上述问题,本实用新型所采用的技术方案是:
排水管桩(3)是在预制管桩管壁(2)开设一定数量的贯穿管壁的小孔(4),地下水可通过小孔(4)流入管桩桩孔(1)内,然后可以通过管桩桩孔(1)排走,因此排水管桩可促进管桩施工、地面荷载、地基自重等在地基中产生的超静孔隙水压力的消散,从而减少挤土效应和减少工后沉降,提高工程质量。
本实用新型的技术特点是:预制管桩的管壁开设一定数量的贯穿管壁的小孔,孔直径为5~15mm,孔距0.3~1.0m,同一横断面上小孔数量不超过3个;地下水可通过小孔流入管桩桩孔内,但地基中土体不会通过小孔进入管桩桩孔内。
本实用新型优点是:地下水可以通过管桩管壁上的小孔进入管桩桩孔内,然后通过管桩桩孔排走,从而促进地基中超静孔隙水压力的消散,减少挤土效应和减少工后沉降,提高工程质量,降低工程造价。
附图说明
    图1为排水管桩结构示意图,图中1为管桩桩孔,2为管桩桩壁,3为排水管桩,4为小孔。
具体实施方式
下面通过实施例对本实用新型做进一步详细说明,这些实施例仅用来说明本实用新型,并不限制本实用新型的范围。
实施例1
排水管桩(3)是在预制管桩桩壁(2)开设一定数量的贯穿管壁的小孔(4),孔直径为5mm,孔距0.3m,同一横断面上小孔数量为3个;地下水可通过小孔(4)流入管桩桩孔(1)内,但地基中土体不会通过小孔进入管桩桩孔(1)内。
实施例2
排水管桩(3)是在预制管桩桩壁(2)开设一定数量的贯穿管壁的小孔(4),孔直径为15mm,孔距1.0m,同一横断面上小孔数量为1个;地下水可通过小孔(4)流入管桩桩孔(1)内,但地基中土体不会通过小孔进入管桩桩孔(1)内。
实施例3
排水管桩(3)是在预制管桩桩壁(2)开设一定数量的贯穿管壁的小孔(4),孔直径为10mm,孔距0.8m,同一横断面上小孔数量为2个;地下水可通过小孔(4)流入管桩桩孔(1)内,但地基中土体不会通过小孔进入管桩桩孔(1)内。

Claims (4)

1.一种排水管桩,其特征在于该排水管桩是在预制管桩桩壁(2)开设一定数量的贯穿管壁的小孔(4)。
2.根据权利要求1所述的一种排水管桩,其特征在于所述的小孔(4)的直径为5~15mm。
3.根据权利要求1所述的一种排水管桩,其特征在于所述的小孔(4)的孔间距为0.3~1.0m。
4.根据权利要求1所述的一种排水管桩,其特征在于所述的小孔(4)在同一横断面上的数量为1~3个。
CN2010206497725U 2010-12-09 2010-12-09 一种排水管桩 Expired - Lifetime CN201943064U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206497725U CN201943064U (zh) 2010-12-09 2010-12-09 一种排水管桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206497725U CN201943064U (zh) 2010-12-09 2010-12-09 一种排水管桩

Publications (1)

Publication Number Publication Date
CN201943064U true CN201943064U (zh) 2011-08-24

Family

ID=44470412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206497725U Expired - Lifetime CN201943064U (zh) 2010-12-09 2010-12-09 一种排水管桩

Country Status (1)

Country Link
CN (1) CN201943064U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392445A (zh) * 2011-10-21 2012-03-28 中铁十七局集团第六工程有限公司 带有竖向排水凹槽的预应力管桩的施工方法
CN103643691A (zh) * 2013-12-24 2014-03-19 山东大学 一种烧结透水桩地基处理方法
CN105350514A (zh) * 2015-11-16 2016-02-24 南京电力工程设计有限公司 一种可伸缩超孔隙水消散套管及其施工方法
CN108999177A (zh) * 2018-08-06 2018-12-14 宁波市交通规划设计研究院有限公司 加速排水固结和加大承载力的软土地基处理结构和方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392445A (zh) * 2011-10-21 2012-03-28 中铁十七局集团第六工程有限公司 带有竖向排水凹槽的预应力管桩的施工方法
CN102392445B (zh) * 2011-10-21 2013-10-30 中铁十七局集团第六工程有限公司 带有竖向排水凹槽的预应力管桩的施工方法
CN103643691A (zh) * 2013-12-24 2014-03-19 山东大学 一种烧结透水桩地基处理方法
CN103643691B (zh) * 2013-12-24 2015-07-29 山东大学 一种烧结透水桩地基处理方法
CN105350514A (zh) * 2015-11-16 2016-02-24 南京电力工程设计有限公司 一种可伸缩超孔隙水消散套管及其施工方法
CN105350514B (zh) * 2015-11-16 2017-04-05 南京电力工程设计有限公司 一种可伸缩超孔隙水消散套管及其施工方法
CN108999177A (zh) * 2018-08-06 2018-12-14 宁波市交通规划设计研究院有限公司 加速排水固结和加大承载力的软土地基处理结构和方法

Similar Documents

Publication Publication Date Title
CN101845820B (zh) 沉井下沉的助沉施工方法
CN202881958U (zh) 一种含有降水功能的基坑支护结构
CN203821412U (zh) 一种疏排桩连续墙支护结构
CN201943064U (zh) 一种排水管桩
CN202865828U (zh) 一种快速排水管桩
CN202323962U (zh) 疏排管桩与土钉墙复合支护结构
CN102134861B (zh) 土体内预制桩试桩方法
CN206337556U (zh) 一种后注浆预制空心桩
CN205676882U (zh) 一种新型的支护结构
CN201665875U (zh) 轻型重力式抗震混凝土挡土墙
CN205591212U (zh) 多功能预制管桩
CN205501983U (zh) 减压排水管桩
CN201567566U (zh) 预制装配式预应力地下连续墙
CN105569063A (zh) 地下室挡土墙周边地下水的收集利用方法及集水结构
CN101161947A (zh) 一种用于基坑支护的护壁桩与降水井合一的方法
CN201202114Y (zh) 承载桩
CN101748749B (zh) 预制装配式预应力地下连续墙及其施工方法
CN204000856U (zh) 内撑灌浆式水平抗侧变刚度桩基
CN103669334A (zh) 一种快速排水管桩
CN201874006U (zh) 输电线路铁塔插管注浆基础
CN206015511U (zh) 一种植桩钢管柱
CN102061695A (zh) 一种排水管桩复合地基处理方法
CN204676586U (zh) 一种吸力桶型输电线路基础
CN205501991U (zh) 防堵塞多功能预制管桩
CN204715385U (zh) 地下室挡土墙周边地下水的集水结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160505

Address after: 519070 Guangdong city in Zhuhai Province before the mountain Verde Street No. 189

Patentee after: China iron Jian Ganghangju Group Co.,Ltd

Address before: 511442 Guangdong Province, Guangzhou City Southern towns Panyu District Hungnam Avenue No. 118 Building No. 2 6 floor

Patentee before: Guangdong Hangsheng Construction Group Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20110824

CX01 Expiry of patent term