CN201942584U - Continuous treatment device for petroleum and natural gas drilling sewage - Google Patents

Continuous treatment device for petroleum and natural gas drilling sewage Download PDF

Info

Publication number
CN201942584U
CN201942584U CN2010205465515U CN201020546551U CN201942584U CN 201942584 U CN201942584 U CN 201942584U CN 2010205465515 U CN2010205465515 U CN 2010205465515U CN 201020546551 U CN201020546551 U CN 201020546551U CN 201942584 U CN201942584 U CN 201942584U
Authority
CN
China
Prior art keywords
angle steel
pipe
pond
wall
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205465515U
Other languages
Chinese (zh)
Inventor
杨学锋
李辉
陈文斌
蒋学彬
李萍
陈立荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN2010205465515U priority Critical patent/CN201942584U/en
Application granted granted Critical
Publication of CN201942584U publication Critical patent/CN201942584U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Water Treatment By Sorption (AREA)

Abstract

The utility model discloses an oil and gas well drilling sewage continuous processing device relates to oil and gas well drilling environmental pollution administers technical field, including the control room, handle pond and reverse osmosis unit, still include chlorine dioxide generater, chlorine dioxide generater includes cross piece, and the upper end of cross piece is connected with the reaction tube, and cross piece left end is connected with the first union formula ball valve of receiving pump income chemical feedstock, and the right-hand member of cross piece is connected with the second union formula ball valve of receiving pump income chemical feedstock, and the lower extreme of cross piece is connected with the third union formula ball valve that is in normally closed state, and the lower extreme of third union formula ball valve and the upper end intercommunication of first tee bend piece, the reaction tube is through the middle-end intercommunication of conveyer pipe with first tee bend piece, the lower extreme of first tee bend piece directly communicates sewage treatment main line. The chlorine dioxide generator has low cost and easy manufacture, and is particularly suitable for the continuous dosing treatment of petroleum and natural gas drilling sewage.

Description

A kind of oil and gas well drilling sewage apparatus for continous treatment
Technical field
The utility model relates to oil and gas well drilling environmental pollution treatment technology field and exactly relates to a kind of oil and gas well drilling sewage apparatus for continous treatment, is used for the continuous processing of oil and gas well drilling sewage.
Background technology
In the oil and gas well drilling, need handle continuously, occur on the market thus carrying out processed continuously device at sewage to sewage.
In the prior art, publication number is CN101139147, the Chinese patent file that open day is on March 12nd, 2008 discloses a kind of petroleum drilling continuous processing technique, comprise the steps: stone oil well drilling sullage continuous processing technique, comprise the steps: coagulation-help coagulate-precipitation-filtration-oxidation adsorbs qualified discharge.The present invention efficiently solves between the cell processing of stone oil well drilling sullage in conjunction with difficult, not good, the discontinuous problem of disposing of sewage of treatment effect, not only reduce sewage colourity and other pollution substances, especially can effectively remove being dissolved in pollutants in sewage matter, and chemical coagulation sedimentation, catalyzed oxidation and physical adsorption are applied in the cover flow process, realize that sewage continuously, after the advanced treatment, meet the qualified discharge standard.
Simultaneously, publication number is CN201074193, and the Chinese patent file that open day is June 18 in 2008 discloses a kind of petroleum drilling apparatus for continous treatment.Comprise the coagulation basin that is communicated with by pipeline successively, help pond, settling tank with fixed attention, also comprise the filtering basin that are communicated with the settling tank pipeline, the oxidation adsorption tank that is communicated with the filtering basin pipeline.The utility model efficiently solves between each cell processing pond of stone oil well drilling sullage in conjunction with difficult, not good, the discontinuous problem of disposing of sewage of treatment effect, not only reduce sewage colourity and other pollution substances, especially can effectively remove being dissolved in pollutants in sewage matter, and each one treatment unit is integrated, realize that sewage continuously, after the advanced treatment, meet the qualified discharge standard.
At present, usually use the CN101139147 treatment process, with the CN201074193 treatment unit sewage is handled continuously, above-mentioned apparatus for continous treatment is divided by function and is comprised watch-keeping cubicle, treating pond, reverse osmosis unit three parts substantially, but there is following shortcoming in above-mentioned oil and gas well drilling sewage apparatus for continous treatment:
1, the Chi Kou of each treating pond of drilling waste water apparatus for continous treatment end face is the open type state.In the treating pond top-side one narrower passageway is installed, in the design and installation of both sides, passageway railing is arranged, operator operate very inconvenient in the above, when needs clear a fence when operating, the risk that crashes into treating pond are just arranged.
2, in the drilling waste water apparatus for continous treatment each processing unit, each unit cells notch portion does not have the design of reinforcing, carrying out drilling waste water when handling continuously, because each unit water level is not at sustained height, along with the passing of duration of service, each unit cells oralia distortion is comparatively serious, and each processing unit pond oralia can become waviness, had a strong impact on work-ing life, thereby influenced the trouble-free operation of whole apparatus for continous treatment.
3, the water inlet pipe and water outlet pipe of the each processing unit of drilling waste water apparatus for continous treatment and blow-off pipe layout is comparatively messy, at first, seems not attractive in appearance, secondly, the import and export joint that is easy to stretch out when carrying breaks, and simultaneously, the structure formation of blow-off pipe exists such problem too.
4, in the drilling waste water apparatus for continous treatment precipitation unit, header is to be placed on the angle steel shelf that is welded on the pool wall, such structure formation makes the space below the shelf just can not place the bigger parts of volume, and because the precipitation unit swash plate is contained in the tilting box, as still adopting aforesaid way to place header, tilting box just can not be in place on request.
5, in the prior art, it is the glass wood tile that precipitation unit is used more corrugated panel, and the form of plastic honeycomb board as swash plate that adopt also arranged, and general the employing approaches stainless steel plate.But the said structure form because fixing not firm, causes corrugated panel along with being flowing in the settling tank of sewage swung, and after sewage was static, swash plate was in original position, thereby influenced sedimentation effect.
6, drilling waste water apparatus for continous treatment watch-keeping cubicle did not have the design of wall coil, and all pipelines all stretch out by the rectangular opening of leaving at the watch-keeping cubicle body of wall, connected the PVC armoured hose outside body of wall again.Cross the fixing of wall coil for each, on ground, watch-keeping cubicle, be welded with the tube support frame.But because each pipeline stretches out side by side, distance is very little between the tube and tube, just there is not the position that nameplate is installed, make that each pipeline sign is unclear, and because drilling operation in the open air, animalcule such as mouse, snake will creep into from the rectangular opening that the watch-keeping cubicle body of wall is left in the watch-keeping cubicle, can cause mouse to bite the equipment electric wire broken, and snake is taken place the accident that personnel damage.
7, existing drilling waste water apparatus for continous treatment is provided with various PVC steel wires and reinforces flexible pipe, is used for each pump in each pond for the treatment of pond and watch-keeping cubicle is coupled together.Various pvc pipe bulk storages are on the ground, and are very messy, on the one hand influenced the apparatus for continous treatment overall appearance and not attractive in appearance, on the other hand, when the people need be from the zone of these bulk storage pipes by the time, very inconvenient, even may be tripped and tumble injury.
8, used dioxide peroxide maker in the apparatus for continous treatment, all are the commercially available chlorine dioxide generators that adopt, price height, volume are big, hydrochloric acid and two kinds of reagent of sodium chlorate are added the container reaction, be difficult to controls reaction speed and dioxide peroxide generation, and be not suitable for the continuous dosing processing, be not suitable for the continuous processing of oil and gas well drilling sewage, therefore it is low to be badly in need of a kind of cost, is easy to make, and can be suitable for the chlorine dioxide reaction device that continuous dosing is handled
The utility model content
For solving the problems of the technologies described above, the utility model proposes a kind of processed continuously device that is used for oil and gas well drilling sewage, the utility model has solved when needs and has cleared a fence when operating, the technical problem that the risk that crashes into treating pond is just arranged, realized operator's safety operation, the dioxide peroxide maker is with low cost, is easy to make, and You Ji is applicable to the continuous dosing processing of oil and gas well drilling sewage; Simultaneously, passing along with duration of service, the pond oralia also can be prolonged indeformable, long service life, for the trouble-free operation of whole apparatus for continous treatment provides good assurance, when carrying, the joint of water inlet pipe and water outlet pipe and blow-off pipe can not broken, having solved tilting box can not technical problem in place on request, after sewage is static, the corrugated panel original position of still can returning, sedimentation effect is very good, does not need that the mounting pipe resting support fixed wall coil in the watch-keeping cubicle, has saved cost, and also avoided mouse, cause the accident of structure deteriorate and loss of life and personal injury to take place in the animalcule inlet chambers such as snake, eliminate potential safety hazard, do not needed that the mounting pipe resting support fixed wall coil in the watch-keeping cubicle, saved cost, and also avoided mouse, cause the accident of structure deteriorate and loss of life and personal injury to take place in the animalcule inlet chambers such as snake, eliminated potential safety hazard.
The utility model is realized by adopting following technical proposals:
A kind of oil and gas well drilling sewage apparatus for continous treatment, comprise the watch-keeping cubicle, treating pond and reverse osmosis unit, it is characterized in that: also comprise the dioxide peroxide maker, the dioxide peroxide maker comprises four-way spare, the upper end of four-way spare is connected with reaction tubes, four-way spare left end is connected with and receives the first union formula ball valve that pumps into chemical feedstocks, the right-hand member of four-way spare is connected with and receives the second union formula ball valve that pumps into chemical feedstocks, the lower end of four-way spare is connected with the 3rd union formula ball valve that is in normally off, the lower end of the 3rd union formula ball valve is communicated with the upper end of first three-way piece, reaction tubes is communicated with through the middle-end of transfer lime with first three-way piece, and the lower end of described first three-way piece directly is communicated with the sewage disposal Trunk Line.
Be provided with the pipe bent structure between control room, treatment pond and the reverse osmosis unit; The pipe bent structure comprises pipe row support; Described pipe row support comprises two sole bar angles; The top is fixedly connected with at least two located lateral angle steel between two sole bar angles; On the sole bar angle between the two located lateral angle steel; Be fixedly installed equally distributed a plurality of dividing plate; The dividing plate setting party is to identical with the located lateral angle steel; Respective diaphragms position consistency on two sole bar angles; Form the groove that to place pvc pipe on each sole bar angle between any two dividing plates
The pipe bent structure also comprises pipe row passageway, described pipe row passageway comprises at least two horizontal angle steel, two horizontal angle steel and described two transverse orientation angle steel are complementary, and laterally angle steel is provided with steady brace, have U-lag on the described transverse orientation angle steel, steady brace matches with U-lag, be set with guidance tape between the two horizontal angle steel, a plurality of pvc pipes are crossed in the space that forms between guidance tape and the described sole bar angle described, the outside of two horizontal angle steel respectively is provided with two inclination sole bar angles, one end of two inclination sole bar angles contacts with ground, and the other end is fixed on the horizontal angle steel, also is fixed with guidance tape between the two inclination sole bar angles.
The treating pond top structure comprises pond, end mouth body of wall and pond, side mouth body of wall, between the mouth body of wall of pond, two sides, the support square steel is installed, on pond, described end mouth body of wall and support square steel, the passageway bracket is installed, fixedly connected with described passageway bracket in embedded passageway between pond, end mouth body of wall and support square steel, be provided with the sole bar angle that is fixed between support square steel and pond, the end mouth body of wall along pond, side mouth wall direction, the plane that the special-shaped angle steel at sole bar angle and edge, embedded passageway forms is provided with the loose-leaf cover net cover that covers treating pond, and closed guardrailing is installed around treating pond.
Treating pond comprises pond oralia structure, and the side of each unitary pond oralia is provided with angle steel, and the cross section of angle steel is isosceles triangle, and the base of isosceles triangle is welded on the side of described pond oralia.
Treating pond comprises water inlet pipe and water outlet pipe structure and blow-off pipe structure; Described water inlet pipe and water outlet pipe structure comprises rapid-acting coupling, tube support folder, two union formula ball valve, CPVC pipe, X-over, 90 ° of elbows, union loose joint and stainless steel bends, have prosopyle and water vent on the treating pond body of wall, stainless steel bend is welded in described prosopyle and the water vent, X-over, CPVC pipe, two union formula ball valve, tube support folder are connected successively with rapid-acting coupling, and loose joint is connected 90 ° of elbows successively with union; Described blow-off pipe structure comprises wash water valve outlet connection, CPVC joint flange, threeway, big union loose joint, big CPVC pipe, bassoon holding clamp and wash water valve, wherein, wash water valve is installed on the flange of settling tank lower box, threeway, big union loose joint, big CPVC pipe, CPVC joint flange connect successively, the bassoon holding clamp is welded on the skid base flat board, and the wash water valve outlet connection is installed on the CPVC joint flange.
The treating pond precipitation unit comprises that header is with folding resting support, folding resting support comprises the hinge seat that is welded on the precipitation unit pool wall, be fixed on the joint pin on the hinge seat, with the supporting plate that is connected with joint pin, described supporting plate is around the reciprocal 180 degree rotations of described joint pin.
The treating pond precipitation unit comprises corrugated board box, corrugated board box comprises the corrugated board box main body that is formed by the angle steel rectangular frame, be welded with two root bottom part angle steel in described angle steel rectangular frame bottom, be welded with four both sides angle steel respectively in angle steel rectangular frame both sides, on the angle steel of described both sides, be welded with the stainless steel round steel, a plurality of stainless steel round steel dislocation welding are fixing and form inclined spaces in the angle steel rectangular frame, angle steel rectangular frame top is provided with spacing angle steel, corrugated panel is spacing in described inclined spaces through bottom angle steel, both sides angle steel, stainless steel round steel and spacing angle steel.
The watch-keeping cubicle was provided with the wall coil structure, be included in the porthole of offering on the interior wall of watch-keeping cubicle of crossing, passed the wall coil of crossing of porthole, with the wall coil web plate excessively that is threaded with the indoor end of mistake wall coil, describedly cross wall coil and cross the porthole wringing fit, the sectional area of crossing the wall coil web plate is greater than the described sectional area of crossing porthole, and the watch-keeping cubicle is outside equipped with the lengthening joint pipe, the lengthening joint pipe runs through described to be crossed in the wall coil, and the pipe that inputs or outputs in the watch-keeping cubicle is connected with described lengthening joint gas thread through X-over.
Compared with prior art, the technique effect that the utility model reached is as follows:
1, in the utility model, the dioxide peroxide maker adopts parts such as union formula ball valve, 90 ° of elbows, four-way spare, reaction tubes, transfer lime, three-way piece to constitute the dioxide peroxide maker, and is simple in structure, with low cost, convenient and practical; And, regulate the first union formula ball valve, the second union formula ball valve just can be regulated the chemical feedstocks amount of pumping into, and the 3rd union formula ball valve is in normal off status, in the time will cleaning to the oxygenant maker, the 3rd union formula ball valve is opened, the chemical feedstocks of maker can be emitted, conveniently the dioxide peroxide maker be cleaned with clear water; And by first three-way piece and second three-way piece, just can realize the continuous dosing of oil and gas well drilling sewage is handled.
Simultaneously, be provided with the pipe bent structure between watch-keeping cubicle, treating pond and the reverse osmosis unit, each groove that the concrete structure of pipe row support makes each pvc pipe all can be formed between the dividing plate is put in order, can put in order each very messy pipe very regular, has improved the aesthetic property of apparatus for continous treatment.The concrete structure in pipe row passageway makes that operator need be from this zone through out-of-date, only need from cross guidance tape through and the pvc pipe of can not stepping on, very convenient easily, stopped to occur being tripped and the situation of tumble injury takes place by pipe.Pipe row passageway is provided with the inclination sole bar angle, is provided with guidance tape between the inclination sole bar angle, and with regard to the up and down whole pipe row of energy handled easily personnel passageway, whole pipe bent structure also seems very attractive in appearance like this.
2, in the utility model, the treating pond top structure, because the structure of embedded passageway of employing and loose-leaf cover net cover covers in the Chi Kou top for the treatment of pond fully, and not busy guardrailing is sealed in design and installation around treating pond, make the treating pond top form a platform, solved when needs and cleared a fence when operating, the technical problem of the risk that crashes into treating pond has just been arranged, realized operator's safety operation.
3, in the utility model, pond oralia structure adopts cross section to be the angle steel of isosceles triangle and the side welding of pond oralia is fixed, such consolidation process, after permanent the use, the pond oralia can not be out of shape yet, and prolonged work-ing life, each Chi Kou carries out drilling waste water under different water levels handles continuously, each unit cells oralia produces distortion all the time, has satisfied design requirements, for the trouble-free operation of whole apparatus for continous treatment provides good assurance.
4, in the utility model, water inlet pipe and water outlet pipe structure and blow-off pipe structure, very both artistic and practical, simple in structure, when carrying, owing to have prosopyle and water vent on the bay wall body, stainless steel bend is welded in prosopyle and the water vent, so the joint of water inlet pipe and water outlet pipe and blow-off pipe can not broken.
5, in the utility model, precipitation unit comprises that header is with folding resting support, hinge seat and precipitation unit pool wall are fixed in employing, supporting plate can around reciprocal 180 degree of joint pin promptly about the mode of each 90 degree rotation, when needs prevent tilting box, can supporting plate is folding to the pool wall face, after placing tilting box, supporting plate is turned back original position again and be used to place header tank, tilting box can be in place as requested, the utility model is simple in structure, and is convenient and practical.
6, in the utility model, precipitation unit comprises corrugated board box, owing to adopt and be welded with two root bottom part angle steel in base of frame, can make corrugated panel not fall down at the bottom of the precipitation unit, because stainless steel round steel dislocation welding, in framework, just formed the space of an inclination, the stupefied plate of Herba Chloranthi Henryi (Herba Choranthi seu Lysimachiae) is put into these spaces respectively, again the spacing angle steel of frame roof is fixed with the bolt two ends, corrugated panel just is limited in by the bottom angle steel, the both sides angle steel, front and back stainless steel round steel, in the inclined spaces that the spacing angle steel at top forms, when sewage transport to precipitation unit, along with the flowing and roll of sewage, corrugated panel is all the time in inclined spaces, can not drift with the tide, after sewage was static, corrugated panel was got back to original position under the effect of gravity, and sedimentation effect is very good.
7, in the utility model, the watch-keeping cubicle was provided with the wall coil structure, owing in control, offered porthole, with mistake porthole wringing fit wall coil was arranged, and outdoor equipment passed behind the wall coil with indoor CPVC pipe by the lengthening joint pipe and was connected by X-over, such mode, separately each pipe all has one and crosses porthole and wall coil is crossed in one of configuration, cross wall coil and cross porthole, the gap of crossing between wall coil and the lengthening joint pipe is all very little, so just do not need the tube support frame of design specialized to fix the CPVC pipe in the watch-keeping cubicle, various animalcules can not enter the watch-keeping cubicle from crossing wall coil, have eliminated potential safety hazard; Each pump inputs or outputs pipe and arrange comparatively dispersion on the body of wall of watch-keeping cubicle, and body of wall has each pump of enough space mounting to input or output the Sign Board of pipe outside the watch-keeping cubicle.
Description of drawings
The utility model is described in further detail below in conjunction with specification drawings and specific embodiments, wherein:
Fig. 1 is the utility model treating pond structural representation
Fig. 2 is a vertical view among Fig. 1
Fig. 3 is a left view among Fig. 1
Fig. 4 is pipe bent structure synoptic diagram
Fig. 5 is a vertical view among Fig. 4
Fig. 6 is a left view among Fig. 4
Fig. 7 is pipe row supporting structure synoptic diagram
Fig. 8 is a vertical view among Fig. 7
Fig. 9 is a left view among Fig. 7
Figure 10 is pipe row passageway structural representation
Figure 11 is a vertical view among Figure 10
Figure 12 is a left view among Figure 10
Reference numeral among Fig. 4-12: 1, pipe row's support, 2, pvc pipe, 3, pipe row passageway, 4, the transverse orientation angle steel, 5, sole bar angle, 6, dividing plate, 7, the inclination sole bar angle, 8, horizontal angle steel, 9, cross guidance tape, 10, steady brace.
Figure 13 is that embedded passageway is placed on the local schematic top plan view in the bracket of passageway
Figure 14 is the local schematic top plan view that installs embedded passageway and loose-leaf cover net cover
Local schematic side view when Figure 15 raises for loose-leaf cover net cover
Reference numeral among Figure 13 to 15: 11, passageway bracket, 12, sole bar angle, 13, embedded passageway, 14, support square steel, 15, handle, 16, hinge assemblies, 17, loose-leaf cover net cover, 18, hook, 19, joint bolt, 110, treating pond, 111, pond, end mouth body of wall, 112, pond, side mouth body of wall.
Figure 16 is a pond oralia structural representation
Figure 16 a is a k-k sectional view among Figure 16
Reference numeral among Figure 16-16a: 21, pond oralia, 22, angle steel.
Figure 17 arranges synoptic diagram for treating pond right side pipe
Figure 17 a is a plan structure synoptic diagram among Figure 17
Figure 18 is that treating pond left side pipe is arranged synoptic diagram
Figure 18 a is a plan structure synoptic diagram among Figure 18
Figure 19 arranges synoptic diagram for the precipitation unit blow-off pipe
Figure 19 a is a plan structure synoptic diagram among Figure 19
Reference numeral among Figure 17-19a: 31, rapid-acting coupling, 32, tube support folder, 33, two union formula ball valve 34, CPVC pipe, 35, X-over, 36,90 ° of elbows, 37, the union loose joint, 38, stainless steel bend, 39, the wash water valve outlet connection, 310, the CPVC joint flange, 311, threeway, 312, big union loose joint, 313, big CPVC pipe, 314, the bassoon holding clamp, 315, wash water valve, 316, the treating pond body of wall.
Figure 20 is folding branching bolster structure synoptic diagram
Figure 21 is a schematic top plan view among Figure 20
Reference numeral among Figure 20-21: 41, hinge seat, 42, joint pin, 43, supporting plate.
Figure 22 is the structural representation of corrugated panel
Figure 23 is a schematic top plan view among Figure 22
Figure 24 is the corrugated board box structural representation
Figure 25 is Figure 24 schematic top plan view
Figure 26 is Figure 24 schematic side view
Reference numeral among Figure 22-26: 51, corrugated panel, 52, the angle steel rectangular frame, 53, the bottom angle steel, 54, the both sides angle steel, 55, the stainless steel round steel, 56, spacing angle steel, 57, bolt.
Figure 27 was the structural representation of wall coil
Figure 28 is a left view among Figure 27
Figure 29 was a wall coil web plate synoptic diagram
Figure 30 is a left view among Figure 29
Figure 31 was a wall coil structural entity structural representation
Figure 32 is that each crosses wall coil distribution and home position synoptic diagram outside the watch-keeping cubicle
Reference numeral among Figure 27-32: 61, cross wall coil, 62, cross the wall coil web plate, 63, the lengthening joint pipe, 64, X-over, 65, the CPVC pipe, 66, pump, 67, the output tube sign, 68, the input tube sign, 69, limited step.
Figure 33 is the structural representation of dioxide peroxide maker
Figure 34 is a left diagrammatic sketch among Figure 33
Mark among the figure among Figure 33-34: 71, reaction tubes, 72, the input X-over, 73, the first union formula ball valve, 74, union loose joint, 75, the 1 ° of elbows, 76, four-way spare, 77, the 3rd union formula ball valve, 78, joint, 79, second three-way piece, 710, the 2 90 ° of elbow, 711, transfer lime, 712, the 3 90 ° of elbows, 713, first three-way piece, 714, output tube, 715, pump into chemical feedstocks, 716, the sewage disposal Trunk Line.
Embodiment
Embodiment 1
As Figure 1-3, the utility model discloses a kind of oil and gas well drilling sewage apparatus for continous treatment, comprise watch-keeping cubicle, treating pond and reverse osmosis unit.
Shown in Figure 33-34, the dioxide peroxide maker, comprise four-way spare 76, the upper end of four-way spare 76 is connected with reaction tubes 71, four-way spare 76 left ends are connected with and receive the first union formula ball valve 73 that pumps into chemical feedstocks, the right-hand member of four-way spare 76 is connected with and receives the second union formula ball valve that pumps into chemical feedstocks, the lower end of four-way spare 76 is connected with the 3rd union formula ball valve 77 that is in normally off, the lower end of the 3rd union formula ball valve 77 is communicated with the upper end of first three-way piece 713, reaction tubes 71 is communicated with through the middle-end of transfer lime 711 with first three-way piece 713, and the lower end of described first three-way piece 713 directly is communicated with the sewage disposal Trunk Line.The lower end of described first three-way piece 713 connects the upper end of second three-way piece 79, and the left and right two ends of second three-way piece 79 are communicated with the sewage disposal pipeline.The described first union formula ball valve 73 and the second union formula ball valve are communicated with four-way spare 76 through 90 ° of elbows respectively.The junction of described reaction tubes 71 and transfer lime 711, the bending place of transfer lime 711 all are connected with 90 ° of elbows.
Embodiment 2
Shown in Fig. 4-12, be provided with the pipe bent structure between watch-keeping cubicle, treating pond and the reverse osmosis unit, comprise pipe row support 1, described pipe row support 1 comprises two sole bar angles 5, upper fixed connects at least two transverse orientation angle steel 4 between two sole bar angles 5, on the sole bar angle 5 between the two transverse orientation angle steel 4, be set with equally distributed a plurality of dividing plate 6, it is identical with transverse orientation angle steel 4 that dividing plate 6 is provided with direction, respective diaphragms 6 position consistency on two sole bar angles 5 form the groove that can place pvc pipe 2 between any two dividing plates 6 on each sole bar angle 5.Also comprise pipe row passageway 3, described pipe row passageway 3 comprises at least two horizontal angle steel 8, two horizontal angle steel 8 are complementary with described two transverse orientation angle steel 4, and laterally angle steel 8 is provided with steady brace 10, have U-lag on the described transverse orientation angle steel 4, steady brace 10 matches with U-lag, is set with guidance tape 9 between the two horizontal angle steel 8, and a plurality of pvc pipes 2 are crossed in the space that forms between guidance tape 9 and the described sole bar angle 5 described.The end that the outside that also comprises two horizontal angle steel 8 respectively is provided with two inclination sole bar angles, 7, two inclination sole bar angles 7 contacts with ground, and the other end is fixed on the horizontal angle steel 8, also is fixed with guidance tape 9 between the two inclination sole bar angles 7.All the other are with embodiment 1.
Embodiment 3
As the utility model one better embodiment, shown in Figure 13-15, the treating pond top structure, comprise pond, end mouth body of wall 111 and pond, side mouth body of wall 112, between pond, two sides mouth body of wall 112, be equipped with and support square steel 14, on pond, described end mouth body of wall 111 and support square steel 14, passageway bracket 11 is installed, fixedly connected with described passageway bracket 11 in embedded passageway 13 between pond, end mouth body of wall 111 and support square steel 14, be provided with the sole bar angle 12 that is fixed between support square steel 14 and pond, the end mouth body of wall 111 along pond, side mouth body of wall 112 directions, the plane that the special-shaped angle steel at sole bar angle 12 and 13 edges, embedded passageway forms is provided with the loose-leaf cover net cover 17 that covers treating pond 110, and closed guardrailing is installed around treating pond 110.All the other are with embodiment 2.
Embodiment 4
As the utility model one better embodiment, as shown in figure 16, pond oralia structure comprises pond oralia 21, is provided with angle steel 22 in the side of each unitary pond oralia 21, the cross section of angle steel 22 is isosceles triangle, and the base of isosceles triangle is welded on the side of described pond oralia 21.All the other are with embodiment 3.
Embodiment 5
As the utility model one better embodiment, shown in Figure 17-19a, water inlet pipe and water outlet pipe comprises compositions (the right side pipe arranges and see Fig. 1 that the left side pipe is arranged and seen Fig. 2) such as rapid-acting coupling 31, tube support folder 32, two union formula ball valve 33, CPVC pipe 34,35,90 ° of elbows 36 of X-over, union loose joint 37, stainless steel bend 38.Blow-off pipe comprises compositions (Fig. 3) such as wash water valve outlet connection 39, CPVC joint flange 310, threeway 311, big union loose joint 312, big CPVC pipe 313, bassoon holding clamp 314, wash water valve 315.It is characterized in that: on the treating pond body of wall, drive water hole and water vent into respectively by design, soldering stainless steel elbow 38, from top to bottom, X-over 35, CPVC pipe 34,37,90 ° of elbows 36 of union loose joint, two union formula ball valve 33, rapid-acting coupling 31 are installed respectively from right to left, at last tube support folder 32 is welded on the treating pond body of wall, load onto pipe clamp, load onto bolt and screw nut, make the pipe location.During on-the-spot the use, in rapid-acting coupling 31, connect the PVC armoured hose and just can use.
The installation of blow-off pipe is to use bolt to be installed on the flange of settling tank lower box wash water valve 315, threeway 311, big union loose joint 312, big CPVC pipe 313, CPVC joint flange 310 are installed respectively again, bassoon holding clamp 314 is welded on the skid base flat board, load onto pipe clamp, load onto bolt and screw nut, pipe is fixed.Use bolt that wash water valve outlet connection 39 is installed on the CPVC joint flange 310 at last.During on-the-spot the use, on wash water valve outlet connection 39, connect the PVC armoured hose and just can use.All the other are with embodiment 4.
Embodiment 6
As the utility model one better embodiment, shown in Figure 20-21, folding resting support comprises hinge seat 41, hinge seat 42, supporting plate 43.It is characterized in that: become a folding resting support by hinge seat 41, joint pin 42, supporting plate 43 group welding pieces, supporting plate 43 can be around 90 ° of joint pin 42 left rotation and right rotation.During installation, measure good each size, the hinge seat 1 of the folding resting support that assembles is welded on the precipitation unit pool wall, in the time will placing tilting box, can be folding to the pool wall face with folding resting support, place tilting box after, resting support is turned back original position again and place header, all the other are with embodiment 5.
Embodiment 7
As the utility model better embodiment, shown in Figure 22-26, the corrugated board box main body is made up of angle steel rectangular frame 52, is welded with 2 root bottom part angle steel 53 in base of frame, and corrugated panel is not fallen down at the bottom of the precipitation unit.Be welded with 4 both sides angle steel 54 respectively in the framework both sides, on angle steel 54, be welded with stainless steel round steel 55, because stainless steel round steel dislocation welding, in framework, just formed the space of an inclination, 4 corrugated panels 51 are put into these spaces respectively, spacing angle steel 56 usefulness bolts 57 two ends of frame roof are fixed, corrugated panel 51 just is limited in the space that the spacing angle steel 56 by bottom angle steel 53, both sides angle steel 54, front and back stainless steel round steel 55, top forms again.When sewage transport to precipitation unit, along with the flowing and roll of sewage, corrugated panel 51 in the space, can not drift with the tide all the time.After sewage was static, corrugated panel was got back to original position under the effect of gravity, and all the other are with embodiment 6.
Embodiment 8
As the utility model preferred forms, shown in Figure 27-32, cross the wall coil structure, be included in the porthole of offering on the interior wall of watch-keeping cubicle of crossing, passed the wall coil 61 excessively of porthole, with the wall coil web plate 62 excessively that is threaded with mistake wall coil 61 indoor ends, described wall coil 61 excessively and mistake porthole wringing fit, the sectional area of crossing wall coil web plate 62 is greater than the described sectional area of crossing porthole, the watch-keeping cubicle is outside equipped with the lengthening joint pipe, lengthening joint pipe 63 runs through described to be crossed in the wall coil 61, and the pipe that inputs or outputs in the watch-keeping cubicle is threaded with described lengthening joint pipe 63 through X-over 64.Because the gap of crossing between wall coil 61 and the lengthening joint pipe 63 is very little, so just do not need the tube support frame of design specialized to fix CPVC pipe 65 in the watch-keeping cubicle, various animalcules can not enter the watch-keeping cubicle from crossing wall coil 61 yet, have eliminated potential safety hazard; Each pump 66 inputs (or output) pipe arranges on the body of wall of watch-keeping cubicle comparatively and disperses that body of wall has the Sign Board of each pump 66 inputs (or output) pipe of enough space mounting outside the watch-keeping cubicle.All the other are with embodiment 7.

Claims (9)

1. oil and gas well drilling sewage apparatus for continous treatment, comprise the watch-keeping cubicle, treating pond and reverse osmosis unit, it is characterized in that: also comprise the dioxide peroxide maker, the dioxide peroxide maker comprises four-way spare, the upper end of four-way spare is connected with reaction tubes, four-way spare left end is connected with and receives the first union formula ball valve that pumps into chemical feedstocks, the right-hand member of four-way spare is connected with and receives the second union formula ball valve that pumps into chemical feedstocks, the lower end of four-way spare is connected with the 3rd union formula ball valve that is in normally off, the lower end of the 3rd union formula ball valve is communicated with the upper end of first three-way piece, reaction tubes is communicated with through the middle-end of transfer lime with first three-way piece, and the lower end of described first three-way piece directly is communicated with the sewage disposal Trunk Line.
2. a kind of oil and gas well drilling sewage apparatus for continous treatment according to claim 1, it is characterized in that: the watch-keeping cubicle, be provided with the pipe bent structure between treating pond and the reverse osmosis unit, the pipe bent structure comprises pipe row support, described pipe row support comprises two sole bar angles, upper fixed connects at least two transverse orientation angle steel between two sole bar angles, on the sole bar angle between the two transverse orientation angle steel, be set with equally distributed a plurality of dividing plate, it is identical with the transverse orientation angle steel that dividing plate is provided with direction, respective diaphragms position consistency on two sole bar angles, form the groove that to place pvc pipe on each sole bar angle between any two dividing plates
3. a kind of oil and gas well drilling sewage apparatus for continous treatment according to claim 1 and 2, it is characterized in that: the pipe bent structure also comprises pipe row passageway, described pipe row passageway comprises at least two horizontal angle steel, two horizontal angle steel and described two transverse orientation angle steel are complementary, and laterally angle steel is provided with steady brace, have U-lag on the described transverse orientation angle steel, steady brace matches with U-lag, be set with guidance tape between the two horizontal angle steel, a plurality of pvc pipes are crossed in the space that forms between guidance tape and the described sole bar angle described, the outside of two horizontal angle steel respectively is provided with two inclination sole bar angles, one end of two inclination sole bar angles contacts with ground, the other end is fixed on the horizontal angle steel, also is fixed with guidance tape between the two inclination sole bar angles.
4. a kind of oil and gas well drilling sewage apparatus for continous treatment according to claim 3, it is characterized in that: the treating pond top structure comprises pond, end mouth body of wall and pond, side mouth body of wall, between the mouth body of wall of pond, two sides, the support square steel is installed, on pond, described end mouth body of wall and support square steel, the passageway bracket is installed, fixedly connected with described passageway bracket in embedded passageway between pond, end mouth body of wall and support square steel, be provided with the sole bar angle that is fixed between support square steel and pond, the end mouth body of wall along pond, side mouth wall direction, the plane that the special-shaped angle steel at sole bar angle and edge, embedded passageway forms is provided with the loose-leaf cover net cover that covers treating pond, and closed guardrailing is installed around treating pond.
5. a kind of oil and gas well drilling sewage apparatus for continous treatment according to claim 4, it is characterized in that: treating pond comprises pond oralia structure, the side of each unitary pond oralia is provided with angle steel, the cross section of angle steel is isosceles triangle, and the base of isosceles triangle is welded on the side of described pond oralia.
6. a kind of oil and gas well drilling sewage apparatus for continous treatment according to claim 5, it is characterized in that: treating pond comprises water inlet pipe and water outlet pipe structure and blow-off pipe structure; Described water inlet pipe and water outlet pipe structure comprises rapid-acting coupling, tube support folder, two union formula ball valve, CPVC pipe, X-over, 90 ° of elbows, union loose joint and stainless steel bends, have prosopyle and water vent on the treating pond body of wall, stainless steel bend is welded in described prosopyle and the water vent, X-over, CPVC pipe, two union formula ball valve, tube support folder are connected successively with rapid-acting coupling, and loose joint is connected 90 ° of elbows successively with union; Described blow-off pipe structure comprises wash water valve outlet connection, CPVC joint flange, threeway, big union loose joint, big CPVC pipe, bassoon holding clamp and wash water valve, wherein, wash water valve is installed on the flange of settling tank lower box, threeway, big union loose joint, big CPVC pipe, CPVC joint flange connect successively, the bassoon holding clamp is welded on the skid base flat board, and the wash water valve outlet connection is installed on the CPVC joint flange.
7. a kind of oil and gas well drilling sewage apparatus for continous treatment according to claim 6, it is characterized in that: the treating pond precipitation unit comprises that header is with folding resting support, folding resting support comprises the hinge seat that is welded on the precipitation unit pool wall, be fixed on the joint pin on the hinge seat, with the supporting plate that is connected with joint pin, described supporting plate is around the reciprocal 180 degree rotations of described joint pin.
8. a kind of oil and gas well drilling sewage apparatus for continous treatment according to claim 7, it is characterized in that: the treating pond precipitation unit comprises corrugated board box, corrugated board box comprises the corrugated board box main body that is formed by the angle steel rectangular frame, be welded with two root bottom part angle steel in described angle steel rectangular frame bottom, be welded with four both sides angle steel respectively in angle steel rectangular frame both sides, on the angle steel of described both sides, be welded with the stainless steel round steel, a plurality of stainless steel round steel dislocation welding are fixing and form inclined spaces in the angle steel rectangular frame, angle steel rectangular frame top is provided with spacing angle steel, corrugated panel is through the bottom angle steel, the both sides angle steel, stainless steel round steel and spacing angle steel are spacing in described inclined spaces.
9. a kind of oil and gas well drilling sewage apparatus for continous treatment according to claim 8, it is characterized in that: the watch-keeping cubicle was provided with the wall coil structure, be included in the porthole of offering on the interior wall of watch-keeping cubicle of crossing, passed the wall coil of crossing of porthole, with the wall coil web plate excessively that is threaded with the indoor end of mistake wall coil, described wall coil excessively and mistake porthole wringing fit, the sectional area of crossing the wall coil web plate is greater than the described sectional area of crossing porthole, the watch-keeping cubicle is outside equipped with the lengthening joint pipe, the lengthening joint pipe runs through described to be crossed in the wall coil, and the pipe that inputs or outputs in the watch-keeping cubicle is connected with described lengthening joint gas thread through X-over.
CN2010205465515U 2010-09-28 2010-09-28 Continuous treatment device for petroleum and natural gas drilling sewage Expired - Lifetime CN201942584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205465515U CN201942584U (en) 2010-09-28 2010-09-28 Continuous treatment device for petroleum and natural gas drilling sewage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205465515U CN201942584U (en) 2010-09-28 2010-09-28 Continuous treatment device for petroleum and natural gas drilling sewage

Publications (1)

Publication Number Publication Date
CN201942584U true CN201942584U (en) 2011-08-24

Family

ID=44469931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205465515U Expired - Lifetime CN201942584U (en) 2010-09-28 2010-09-28 Continuous treatment device for petroleum and natural gas drilling sewage

Country Status (1)

Country Link
CN (1) CN201942584U (en)

Similar Documents

Publication Publication Date Title
CN206024742U (en) Novel irrigator is used to agricultural
CN205296112U (en) Surface of water ware of removing contamination for environmental management
CN204676627U (en) Intelligence is drawn water jet douche device
CN210915465U (en) Inclined plate precipitator
CN201942584U (en) Continuous treatment device for petroleum and natural gas drilling sewage
CN101973649B (en) Continuous treatment device for petroleum and natural gas drilling sewage
CN208732755U (en) A kind of factory's treatment tank
CN216337028U (en) Low-cost temporary sewage treatment equipment
CN207211259U (en) Water tank
CN206127038U (en) Energy -concerving and environment -protective effluent treatment plant
CN205295025U (en) Sewage treating pond
CN211069140U (en) Sedimentation tank sedimentation unit and folded plate horizontal flow sedimentation tank
CN207267823U (en) A kind of underwater aeration device for rainwater-collecting processing and reuse
CN106824337A (en) A kind of portable chemical classroom instruction experiment frame
CN206931328U (en) Outdoor abacterial water tank with advertisement hanger
CN206934920U (en) It is a kind of can sludge salvage work wastewater treatment equipment
CN202785792U (en) Bio-contact oxidation pond
CN201561889U (en) Settlement plate on cell preparation staining machine
CN110550761A (en) Environment-friendly sewage treatment device for municipal plant
CN216358839U (en) Sewage treatment integrated equipment capable of automatically discharging sewage
CN206245399U (en) A kind of industrial water tank automatic flushing device
CN210558123U (en) Biogas slurry tank inclined plate loading device
CN105366886B (en) A kind of modularization complex ecological sewage disposal settling apparatus
CN208486466U (en) A kind of rainwater drainage pipe for building
CN210133935U (en) High-efficient ecological bed that floats suitable for still water view

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110824