CN201940597U - Construction structure between wall and bottom of steel ladle - Google Patents

Construction structure between wall and bottom of steel ladle Download PDF

Info

Publication number
CN201940597U
CN201940597U CN2011200268093U CN201120026809U CN201940597U CN 201940597 U CN201940597 U CN 201940597U CN 2011200268093 U CN2011200268093 U CN 2011200268093U CN 201120026809 U CN201120026809 U CN 201120026809U CN 201940597 U CN201940597 U CN 201940597U
Authority
CN
China
Prior art keywords
wall
prefabricated section
bag
working lining
prefabricated block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200268093U
Other languages
Chinese (zh)
Inventor
顾汉华
蒋鹏
陈卫荣
郁继平
王涛
俞平
伍春芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoshan Iron and Steel Co Ltd
Original Assignee
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Iron and Steel Co Ltd filed Critical Baoshan Iron and Steel Co Ltd
Priority to CN2011200268093U priority Critical patent/CN201940597U/en
Application granted granted Critical
Publication of CN201940597U publication Critical patent/CN201940597U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

A construction structure between the wall and the bottom of a steel ladle comprises a steel ladle steel casing, a wall permanent lining and a wall working lining, and the wall working lining is constructed by a first rectangular prefabricated block. The construction structure is characterized in that a second prefabricated block for a lowest working lining layer of the wall working lining is perpendicular to the bottom, the wall thickness of the second prefabricated block is smaller than that of the first prefabricated block, and the upper surface of the second prefabricated block is parallel to the first prefabricated block. The second prefabricated block is staggered with the first prefabricated block in the width direction, the second prefabricated block and the first prefabricated block are curved or stepped after integral pouring, so that the bottom and the wall are tightly gripped with each other, and the purposes that the bottom cannot easily fall and cold steel cannot seep into the steel ladle are achieved when the steel ladle is overturned. In addition, the permanent lining is tightly attached to the prefabricated blocks of the wall of the steel ladle, so that pouring materials of the bottom cannot be loosened and fall off when slag of the steel ladle is poured.

Description

A kind of ladle wall and the masonry construction of bag between the end
Technical field
The utility model relates to the masonry technology field of casting fused mass container lining, particularly a kind of ladle wall and the masonry construction of bag between the end.
Background technology
Along with the development of iron and steel cause, the demand of high-grade clean steel is increased day by day.The smelting condition harshness of clean steel, and require the content of impurity such as C in the molten steel, N, S, P few, this selection to clean steel ladle working lining refractories has proposed baptism.At present, corundum spinel water material feeding and prefabricated section proved clean steel ladle working lining material than good material, its bag wall is generally built by laying bricks or stones with the prefabricated section form, and generally build by laying bricks or stones to water the material feeding form at the bag end.But, it can not be fitted tightly with bag wall permanent liner, and also there is the hidden danger of loose or dislocation when ladle is toppled over slag in the material feeding of bag bottom pour mold because prefabricated section adopts single brick type for a long time.
Summary of the invention
The purpose of this utility model is to design a kind of ladle wall and the masonry construction of bag between the end, makes the ladle wall prefabricated section be close to permanent liner, can also make the material feeding of bag bottom pour mold can loose or dislocation when ladle is toppled over slag.
For achieving the above object, the technical solution of the utility model is:
A kind of ladle wall and the masonry construction of bag between the end comprise ladle box hat, bag wall permanent liner and bag wall working lining; Bag wall working lining adopts first prefabricated section of rectangular shape to build by laying bricks or stones; It is characterized in that bag wall working lining basecoat working lining is straight with the bag dolly with second prefabricated section, the second prefabricated section wall thickness is less than first prefabricated section, and the second prefabricated section upper surface is parallel with first prefabricated section.
Further, described second prefabricated section and first prefabricated section have dislocation on width, and bag wall working lining cast back forms curved surface shape or stepped.
In addition, described bag wall working lining basecoat working lining is built into the ring brick by laying bricks or stones by second prefabricated section, and the second prefabricated section height is less than first prefabricated section 1/2nd, and width is less than first prefabricated section 1/3rd.
The beneficial effects of the utility model
The utility model ladle wall working lining adopts first prefabricated section of same rectangular shape to build by laying bricks or stones, second prefabricated section of bag wall basecoat working lining, and straight with the bag dolly, wall thickness is less than first prefabricated section, and upper surface is parallel with first prefabricated section.This masonry construction can make the ladle wall prefabricated section be close to permanent liner, can also make the bag bottom pour mold material feeding can loose or dislocation when ladle is toppled over slag.
The ladle wall prefabricated section is close to permanent liner, make its molten steel wash away with static pressure under the unlikely depression that is subjected to displacement, the utility model can also make the bag bottom pour mold material feeding can loose or dislocation when ladle is toppled over slag in addition, thereby significantly reduced the anti-material of bag wall because of damage that non-material factors caused, from adopting this kind structure to wrap building by laying bricks or stones of wall, from having the phenomenon that the end comes off did not take place to wrap.
Description of drawings
Fig. 1 is the structure cutaway view of the utility model one embodiment.
The specific embodiment
Referring to Fig. 1, an embodiment of the utility model ladle wall and the masonry construction of bag between the end, it comprises ladle box hat 1, bag wall permanent liner 2 and bag wall working lining 3; Bag wall working lining 3 adopts first prefabricated section 4 of same rectangular shape to build by laying bricks or stones except the major part such as the top 31 of basecoat working lining 32, bag wall working lining 3 basecoat working linings 32 usefulness second prefabricated section 5 is vertical with the bag end 6, second prefabricated section, 5 wall thickness are parallel with first prefabricated section 4 less than first prefabricated section, 2, the second prefabricated sections, 5 upper surfaces.
In the present embodiment, brick is encircled with the bottommost one that the binding site that wraps wall just wraps wall in the bag end, second prefabricated section, 5 height of building usefulness by laying bricks or stones are less than first prefabricated section 1/4th two, width is less than first prefabricated section 1/2nd three simultaneously, form with first prefabricated section and on width, have dislocation, top bag wall working lining 31 adopts first prefabricated section 4 by normally building by laying bricks or stones, it is integrated poured that material feeding 7 is watered in the bag ends 6 employing, formed curved surface shape or stepped after the cast, make and reach the bag end and the tight interlock of bag wall ladle and in tumbling, wrap end difficult drop-off and infiltrate cold steel.

Claims (3)

1. ladle wall and the masonry construction of bag between the end comprise ladle box hat, bag wall permanent liner and bag wall working lining; Bag wall working lining adopts first prefabricated section of rectangular shape to build by laying bricks or stones, it is characterized in that, bag wall working lining basecoat working lining is straight with the bag dolly with second prefabricated section, and the second prefabricated section wall thickness is less than first prefabricated section, and the second prefabricated section upper surface is parallel with first prefabricated section.
2. ladle wall as claimed in claim 1 and the masonry construction of bag between the end is characterized in that described second prefabricated section and first prefabricated section have dislocation on width, bag wall working lining cast back forms curved surface shape or stepped.
3. ladle wall as claimed in claim 1 or 2 and the masonry construction of bag between the end, it is characterized in that, described bag wall working lining basecoat working lining is built into the ring brick by laying bricks or stones by second prefabricated section, and the second prefabricated section height is less than first prefabricated section 1/2nd, and width is less than first prefabricated section 1/3rd.
CN2011200268093U 2011-01-27 2011-01-27 Construction structure between wall and bottom of steel ladle Expired - Fee Related CN201940597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200268093U CN201940597U (en) 2011-01-27 2011-01-27 Construction structure between wall and bottom of steel ladle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200268093U CN201940597U (en) 2011-01-27 2011-01-27 Construction structure between wall and bottom of steel ladle

Publications (1)

Publication Number Publication Date
CN201940597U true CN201940597U (en) 2011-08-24

Family

ID=44467948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200268093U Expired - Fee Related CN201940597U (en) 2011-01-27 2011-01-27 Construction structure between wall and bottom of steel ladle

Country Status (1)

Country Link
CN (1) CN201940597U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108044090A (en) * 2018-01-19 2018-05-18 山东钢铁集团日照有限公司 A kind of method for constructing bottom of steel ladle
CN115415510A (en) * 2022-09-16 2022-12-02 包头钢铁(集团)有限责任公司 Steel ladle bottom and building method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108044090A (en) * 2018-01-19 2018-05-18 山东钢铁集团日照有限公司 A kind of method for constructing bottom of steel ladle
CN115415510A (en) * 2022-09-16 2022-12-02 包头钢铁(集团)有限责任公司 Steel ladle bottom and building method

Similar Documents

Publication Publication Date Title
CN203956035U (en) The ingot mould of cast vanadium iron
CN103302280B (en) A kind of building method of steel ladle bottom for ultra-low carbon steel
CN101683690B (en) Method for constructing bottom of ladle
CN201940597U (en) Construction structure between wall and bottom of steel ladle
CN202845769U (en) Heat-preserving steel ladle lining and steel ladle
CN100389911C (en) Casing patch method for ladle brickwork neck bush
CN105618725A (en) Compositely-bricked small-medium-sized steel ladle work lining
CN203725754U (en) Laying structure of prefabricated bricks of steel ladle wall
CN205387692U (en) Dam body and river course drop
CN101386898B (en) Repairing method of molten iron chute for mixer furnace
CN204075177U (en) A kind of continuous casting pouring basket slag bridging wall
CN202182612U (en) Lining structure of vertical lime pit
CN202648376U (en) Transportation chute of rotary kiln
CN201960126U (en) Built-in air-permeable brick formed by blowing argon at bottom of steel ladle
CN202804168U (en) Reinforced ladle lining
CN104128596B (en) The ramming process method of middle-size and small-size refining ladle permanent layer
CN2743064Y (en) Steel ladle working layer structure
CN203831550U (en) Die for manufacturing high-purity corundum crucible
CN205475987U (en) Two female public button head T shape building blocks and brickwork of building by laying bricks or stones thereof
RU2011135147A (en) METHOD OF LAYING LAYING OF THE STEEL FILLING BUCKET AND STEEL FILLING BUCKET
CN201785348U (en) Novel bifurcated chute of coke dry quenching (CDQ) once dust remover
CN104399959A (en) Masonry construction capable of increasing service cycle of bottom of steel ladle
CN203586808U (en) Leveling wall used in receiving hopper, and receiving hopper with same
CN202786290U (en) Blast-furnace tapping channel with bonding slurry capable of being repaired
CN205368424U (en) Submerged RH dip pipe structure of lining brick in preventing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110824

Termination date: 20200127

CF01 Termination of patent right due to non-payment of annual fee