CN201923798U - Arm support system for novel crawler crane - Google Patents
Arm support system for novel crawler crane Download PDFInfo
- Publication number
- CN201923798U CN201923798U CN2010206260870U CN201020626087U CN201923798U CN 201923798 U CN201923798 U CN 201923798U CN 2010206260870 U CN2010206260870 U CN 2010206260870U CN 201020626087 U CN201020626087 U CN 201020626087U CN 201923798 U CN201923798 U CN 201923798U
- Authority
- CN
- China
- Prior art keywords
- wind rope
- arm support
- arm
- support system
- jib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses an arm support system for a novel crawler crane, consisting of an arm support and a wind rope, wherein the wind rope consists of a pulling cable and a balancing structure; one end of the wind rope is hinged with the end part of the arm support, and the other end of the wind rope is hinged with a rotatable platform; the wind rope is arranged at two sides of the root of the arm support; and the rotary planes of the arm support are respectively provided with two wind rope centrosymmetric arm support axes. The arm support system has the advantages of effectively reducing the lateral displacement of an arm head, increasing the lateral stability of the arm support system, and improving the lifting performance of a long arm weakened due to lateral load. When the section of a single arm support system achieves the limit due to the restriction of the transporting dimension, the lifting weight can be effectively improved by additionally arranging the wind rope, and a dual arm-support system is not required, so that the arm support system has a simple structure and strong economy.
Description
Technical field
The utility model relates to engineering machinery field, particularly a kind of novel crawler crane boom system.
Background technology
Along with the development of technology, hoisting structure spare is tending towards maximizing, and the large-scale mobile weight-lifting equipment market demand increases day by day.For promoting lifting performance, large-tonnage crawler crane boom system adopts dual mode to design at present: a traditional single armed, two innovation both arms.
The tradition single arm method is by increasing the jib cross section, increasing the caliber wall thickness and improve lifting performance, for example LR13000 etc.This mode can cause transporting over-wide behind certain size, increase traffic cost, if adopt the split-type jib can increase mounting complexity.
Innovation both arms mode adopts compound type jib mode to improve lifting performance by modular design concept, for example CC8800-1 TWIN etc.This mode can obviously promote lifting performance, but design is complicated, from great, and the cost height, the synchronism problem is outstanding.
Above-mentioned design all has problems in transportation and assembling, and design is complicated.
Summary of the invention
The purpose of this utility model is that the boom system design that overcomes prior art is complicated, from great, and the cost height, poor synchronization is difficult for technical matterss such as transportation, and a kind of novel crawler crane boom system is provided.
In order to achieve the above object, the novel crawler crane boom system that provides of the utility model is made up of traditional single armed frame and wind rope.The wind rope is become with the balance structural group by drag-line.Wind rope one end is articulated in the jib end, and an end is articulated in turntable, is positioned at jib root both sides, and the jib plane of rotation respectively has two cover wind rope center symmetry jib axis.During the work of tradition jib, jib bears and hangs lateral loading and the lateral loading of jib under wind effect that the loading beat causes, jib arm head place will produce side travel.
Have two kinds with the turntable ways of connecting, a kind of is when the turntable width is enough, and the wind rope can directly be connected with the turntable bearing pin.Another kind of mode is to stretch out bracing frame at the jib root to be connected with the wind rope.The present invention is after arm head increases the wind rope, when one crosswind rope was stressed when jib is carried by side, another crosswind rope was in relaxed state, can effectively reduce the side travel of arm head, increase the lateral stability of boom system, the lifting performance that long-armed length is weakened by lateral loading in the raising.When being reached capacity by transportation clearance restriction in the single boom system cross section, increase the wind rope and can effectively improve hoisting capacity, need not to escalate into the both arms frame system, simple in structure, economy is strong.
This project organization is simple, and is practical, in light weight, improves lifting performance, good economy performance.
Description of drawings
Fig. 1 is embodiment 1 a complete machine structure lateral plan.
Fig. 2 is embodiment 1 a complete machine structure front elevation.
Fig. 3 is embodiment 1 a wind rope structure front view.
Fig. 4 is embodiment 1 a wind rope structure lateral plan.
Fig. 5 is embodiment 1 an adjustable drag-line partial enlarged drawing.
Fig. 6 is that embodiment 1 wind rope epimerite connects partial enlarged drawing.
Fig. 7 is that embodiment 1 wind rope coxopodite connects partial enlarged drawing.
Fig. 8 is embodiment 2 little turntable complete machine front elevations.
Fig. 9 is that embodiment 2 little turntable wind ropes connect the left-half front view.
Figure 10 is that embodiment 2 little turntable wind ropes connect lateral plan.
Accompanying drawing sign: 1, wind rope; 2, suspension hook; 3, principal arm system; 4, connect crossbeam; 5, following truck system; 6, turret systems; 7, Weighting system; 8, counterweight arm-tie; 9, Shears system; 10, surpassed arm-tie behind the mast; 11, surpassed the mast system; 12, surpassed the principal arm arm-tie; 1.1 wind rope principal arm epimerite equalizing bar; 1.2 common drag-line; 1.3 the adjustable drag-line of wind rope; 1.4 wind rope principal arm coxopodite crossbeam; 1.5 wind rope bracing frame; 1.6 wind rope coxopodite link span; 3.1 principal arm epimerite; 3.2 principal arm coxopodite.
The specific embodiment
The present invention is described in detail below in conjunction with drawings and Examples.
Present large-tonnage crawler crane boom system, if adopt single armed frame integral type pattern transporting over-wide, and it is poor to increase the wall thickness welding process; If adopt the single armed frame to split pattern, the working accuracy height is installed complicated; Form if adopt the parallel pattern of both arms frame to be rigidly connected by the independent jib of two covers, complex structure, less economical; As adopt both arms frame A font formula, jib design and installation complexity when brachium changes, precision height.Existing scheme is different from traditional single armed frame pattern, and the complexity that is different from the both arms frame, scheme is the single armed frame with the boom system design and adds wind rope pattern, reduces the arm head lateral deflection by increasing the wind rope, increase the lateral stability of boom system, improve lifting performance.
Please refer to Fig. 1 to Fig. 7, whole crawler crane surpassed type principal arm operating mode by wind rope 1, suspension hook 2, principal arm system 3, connect crossbeam 4, down truck system 5, turret systems 6, Weighting system 7, counterweight arm-tie 8, Shears system 9, surpassed arm-tie 10 behind the mast, surpassed mast system 11, surpassed principal arm arm-tie 12 and form.
Wind rope principal arm epimerite equalizing bar 1.1 connects with principal arm epimerite 3.1 corresponding hinge ears by bearing pin 1.5.Wherein principal arm epimerite 3.1 vertically transports if transporting over-wide can consider to make the 3m joint.
Wind rope principal arm coxopodite crossbeam 1.4 is connected crossbeam 4 by bearing pin and links to each other with turntable.For guaranteeing jib luffing synchronism, wind rope principal arm coxopodite crossbeam 1.4 bearing pins are coaxial with principal arm coxopodite 3.2 bearing pins.
Embodiment 2
Please refer to Fig. 8 to Figure 10, embodiment 1 is based on the big turntable structure of large-tonnage and proposes, can adopt as shown in Figure 8 complete machine structure for the little turntable structure of medium tonnage, promptly change the connection mode of wind rope root, original turntable connection is made into to be connected with the principal arm root, and the principal arm corresponding site should locally be strengthened.
Little turntable wind rope scheme comprises wind rope principal arm epimerite equalizing bar 1.1, several groups of common drag-lines 1.2, the wind rope is adjustable drag-line 1.3, wind rope bracing frame 1.5, wind rope coxopodite link span 1.6 are formed.Change angle between wind rope and the jib by the length that changes bracing frame, have more alerting ability.Wind rope bracing frame 1.5, wind rope coxopodite link span 1.6 all can be designed to adjustable-length, while wind rope coxopodite link span 1.6 is connected bearing pin with principal arm coxopodite 3.2 and can makes the slideway pattern into, the mismatch problem when remedying bracing frame 1.5 and wind rope coxopodite link span 1.6 length adjustment.But the entire length that should control the wind rope should be greater than inefficacy length (maximum displacement of arm head side direction beat).
Consider that the jib deflection causes luffing plane two with the drag-line unbalance stress,, guarantee that wind rope drag-line is stressed evenly on the same group at principal arm epimerite place design wind rope principal arm epimerite equalizing bar 1.1.Consider that the jib beat causes wind rope elongation or compression, the adjustable drag-line 1.3 of design wind rope can be regulated by slotted hole or spring mechanical, or carry out electronic control by pulling force sensor.
After principal arm system 3 was subjected to the lateral loading arm head to produce side travel, a crosswind rope was in tension state, a crosswind rope is in relaxed state, reduces the arm head side travel.
Claims (2)
1. a novel crawler crane boom system is characterized in that, described boom system is made up of jib and wind rope; The wind rope is become with the balance structural group by drag-line; Wind rope one end is articulated in the jib end, and an end is articulated in turntable, is positioned at jib root both sides, and the jib plane of rotation respectively has two cover wind rope center symmetry jib axis.
2. novel crawler crane boom system according to claim 1 is characterized in that, described wind rope has two kinds with the turntable ways of connecting: a kind of is that the wind rope directly is connected with the turntable bearing pin; Another kind of mode is to stretch out bracing frame at the jib root to be connected with the wind rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206260870U CN201923798U (en) | 2010-11-26 | 2010-11-26 | Arm support system for novel crawler crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206260870U CN201923798U (en) | 2010-11-26 | 2010-11-26 | Arm support system for novel crawler crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201923798U true CN201923798U (en) | 2011-08-10 |
Family
ID=44427662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206260870U Expired - Fee Related CN201923798U (en) | 2010-11-26 | 2010-11-26 | Arm support system for novel crawler crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201923798U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102020208A (en) * | 2010-11-26 | 2011-04-20 | 大连益利亚工程机械有限公司 | Novel arm support system for crawler crane |
-
2010
- 2010-11-26 CN CN2010206260870U patent/CN201923798U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102020208A (en) * | 2010-11-26 | 2011-04-20 | 大连益利亚工程机械有限公司 | Novel arm support system for crawler crane |
CN102020208B (en) * | 2010-11-26 | 2013-05-22 | 大连益利亚工程机械有限公司 | Novel arm support system for crawler crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2639196B1 (en) | TOWER CRANE AND TIE ROD STRUCTURE of balance boom THEREOF, AND method for MOUNTING tie rod structure of balance boom | |
CN201943007U (en) | Constant amplitude frame beam crane capable of being used in combination with movable support frame | |
CN102795555B (en) | Large slalom crane for offshore platform | |
CN102020208B (en) | Novel arm support system for crawler crane | |
CN103466472A (en) | Auxiliary arm system and crawler crane | |
CN203112390U (en) | Super-lifting device of crane and all-terrain crane | |
CN110271954A (en) | Hoisting system and engineering machinery | |
CN103663190A (en) | Cantilever crane and crane | |
CN201923798U (en) | Arm support system for novel crawler crane | |
CN203095407U (en) | Multifunctional lifting hook counterweight device | |
CN202022678U (en) | Connecting device of crane jib and crane with same | |
CN2644490Y (en) | Hoisting, installing and adjusting device for large tonnage arch rib | |
CN204778268U (en) | A special lifting device for hoist and mount of large -tonnage precast box girder | |
CN202657871U (en) | Waist rope connecting structure of crane and crane comprising waist rope connecting structure | |
CN100484859C (en) | Hook balancing pulley set of large tonnage crane | |
CN201882810U (en) | Tower crane provided with jib loading boom lateral stay cables | |
CN210001478U (en) | Arm frame assembly and crane | |
CN202449768U (en) | Counterweight strap device for crane and crane | |
CN205076725U (en) | Revolving stage structure and have hoist of wind -powered electricity generation installation ship of this revolving stage structure | |
CN216272825U (en) | Triangular boom frame and prestressed steel cable combined crane boom structure | |
CN201082850Y (en) | Crawler crane main boom head | |
CN103508331B (en) | A kind of Fast-assembly/disassoffshorepe offshorepe crane | |
CN207608202U (en) | A kind of double-machine lifting crane carrying pole device | |
CN102602822B (en) | Crane superlift connection bracket and crane | |
CN220149078U (en) | Connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110810 Termination date: 20111126 |