CN201923704U - Embedded part for heavy rail of rotary lifting platform of conductor take-up system - Google Patents
Embedded part for heavy rail of rotary lifting platform of conductor take-up system Download PDFInfo
- Publication number
- CN201923704U CN201923704U CN2010206442173U CN201020644217U CN201923704U CN 201923704 U CN201923704 U CN 201923704U CN 2010206442173 U CN2010206442173 U CN 2010206442173U CN 201020644217 U CN201020644217 U CN 201020644217U CN 201923704 U CN201923704 U CN 201923704U
- Authority
- CN
- China
- Prior art keywords
- embedded part
- fixing seat
- bottom plate
- conductor
- lifting platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model discloses an embedded part for a heavy rail of a rotary lifting platform of a conductor take-up system. The embedded part comprises a bottom plate; the front end of the bottom plate is provided with a plurality of positioning holes; a fixing seat is mounted on the upper portion of the rear end of the bottom plate; a pair of stop levers is fixedly connected to the rear end of the fixing seat; the bottom plate is a galvanized steel plate; the fixing seat is L-shaped angle steel; and the stop levers are L-shaped levers made of threaded steel. By the aid of the structure that the fixing seat is mounted on the bottom plate and the stop levers are mounted on the fixing seat, the embedded part is capable of effectively bearing load and fixed into cement, the mechanical strength of the embedded part meets design requirements, and stability in operation of the integral rotary lifting platform is ensured.
Description
Technical field:
The utility model relates to conductor take-up system equipment, a kind of specifically conductor take-up system rotation and lifting flat-bed heavy rail built-in fitting.
Background technology:
Along with the development of atomic fusion technology, the ITER project is extensively carried out in the world, and the ITER conductor also progressively is applied.In the manufacturing process of ITER conductor, need earlier conductor to be carried out undergauge, successively conductor is carried out pre-bending then and receive around so that detect and transport.Conductor pre-bending and receive around process in, because multimachine synchronous interaction, necessarily there is nonsynchronous factor between the equipment, as: drive of motor gear error, each active transmission node wheel footpath manufacturing errors, the big mass motion inertia of rotation and lifting platform etc., these errors will cause the conductor motion asynchronous, equipment is damaged, and conductor sustains damage.
Design ITER conductor take-up system equipment and technology purpose are intended to solve the asynchronous danger that brings of above-mentioned conductor operation, thus realize to the continuity of conductor, inhomogeneity receipts around, provide powerful support for for the smooth implementation of ITER project provides.This complete equipment becomes safety protection mechanism, prebending machine, multi-functional arc stand, take-up tube, rotation and lifting platform and turn-key system six major parts by the take-up bullet and forms.Wherein the rotation and lifting terrace part is provided with rotation platform diameter 5.6M, rotation platform plane and floor level 0.5M; Lifting platform height 5.6M is set; Rotation platform load capacity 36T is set; Platform rotational line speed is set: 0.5M/MIN ~ 3M/MIN(refers on the 4M diameter), descending speed: 20MM ~ 60MM/R (turn table rotates a week, coil pitch 20MM~60MM); Rotation and lifting platform extreme higher position can be born: the moment of flexure of 3T/M, and extreme lower position can be born: the moment of flexure of 18T/M, the moment of flexure state is for increasing gradually and to walk around the synchronous regime of each driving mechanism of journey relevant with receipts; The lifting table most significant bit installs lockout mechanism, and middle optional position can reliably stop, and extreme lower position is supported with damping, and the 1.7M service clearance is arranged at the bottom; The rotation and lifting platform bearer that the take-up tube is done rotation and the take-up of conductor is finished in descending motion.
Conductor take-up system rotation and lifting flat-bed heavy rail, its diameter is big, and weight is very high, adopts common built-in fitting, and therefore the requirement of mechanical strength out of reach need provide a kind of new construction to come load-bearing.
Summary of the invention:
For solving the problem that prior art exists, the utility model provides a kind of conductor take-up system rotation and lifting flat-bed heavy rail built-in fitting, by on base plate, installing and fixing seat, and the frame mode of lever is installed on permanent seat, effectively load-bearing and being fixed in the cement, mechanical strength reaches designing requirement, has guaranteed whole rotation and lifting flat-bed stable operation.
The technical solution adopted in the utility model:
A kind of conductor take-up system rotation and lifting flat-bed heavy rail built-in fitting, comprise base plate: the base plate front end has some knock holees, and base plate rear end top is equipped with permanent seat, and the permanent seat rear end is fixedly connected with a pair of pin.
Described base plate is a zincing steel sheet, and described permanent seat is L shaped angle steel, and described pin is the L shaped bar of screw-thread steel material.
Advantage of the present utility model:
The utility model is by installing and fixing seat on base plate, and the frame mode of lever is installed on permanent seat, effectively load-bearing and being fixed in the cement, and mechanical strength reaches designing requirement, has guaranteed whole rotation and lifting flat-bed stable operation.
Description of drawings:
Fig. 1 is the utility model structural representation lateral plan;
Fig. 2 is the utility model structural representation birds-eye view;
The specific embodiment:
A kind of conductor take-up system rotation and lifting flat-bed heavy rail built-in fitting, comprise base plate 1: base plate 1 front end has some knock holees 2, base plate 1 upper rear end is equipped with permanent seat 3, permanent seat 3 rear ends are fixedly connected with a pair of pin 4, base plate 1 is a zincing steel sheet, permanent seat 3 is L shaped angle steel, and pin 4 is the L shaped bar of screw-thread steel material.
Claims (2)
1. a conductor take-up system rotation and lifting flat-bed heavy rail built-in fitting comprises base plate, and it is characterized in that: the base plate front end has some knock holees, and base plate rear end top is equipped with permanent seat, and the permanent seat rear end is fixedly connected with a pair of pin.
2. conductor take-up according to claim 1 system rotation and lifting flat-bed heavy rail built-in fitting, it is characterized in that: described base plate is a zincing steel sheet, and described permanent seat is L shaped angle steel, and described pin is the L shaped bar of screw-thread steel material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206442173U CN201923704U (en) | 2010-12-07 | 2010-12-07 | Embedded part for heavy rail of rotary lifting platform of conductor take-up system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206442173U CN201923704U (en) | 2010-12-07 | 2010-12-07 | Embedded part for heavy rail of rotary lifting platform of conductor take-up system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201923704U true CN201923704U (en) | 2011-08-10 |
Family
ID=44427568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206442173U Expired - Lifetime CN201923704U (en) | 2010-12-07 | 2010-12-07 | Embedded part for heavy rail of rotary lifting platform of conductor take-up system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201923704U (en) |
-
2010
- 2010-12-07 CN CN2010206442173U patent/CN201923704U/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108700023B (en) | Bearing structure for multi-rotor wind turbine | |
CN103423105A (en) | Wind generation set impeller assembling device and impeller assembling method | |
CN103511179B (en) | A kind of wind wheel structure of vertical-axis wind driven generator and installation method thereof | |
CN201923704U (en) | Embedded part for heavy rail of rotary lifting platform of conductor take-up system | |
CN201334328Y (en) | Lower support saddle component for ultra-large type tower crane | |
CN201895986U (en) | Fixed pulley block of rotary lifting platform of conductor cable collection system | |
CN208633975U (en) | A kind of three wind wheel type wind power plants | |
CN201923705U (en) | Counterweight guide wheel component for rotary lifting platform of conductor take-up system | |
CN201896052U (en) | Guide shoe of rotary lifting platform of conductor cable twisting system | |
CN201923699U (en) | Steel cable tensioner of rotary lifting platform of conductor cable-winding system | |
CN201896929U (en) | Turbine box of rotated lifting platform of conductor cable-collection system | |
CN204187214U (en) | A kind of load-bearing fixed component of multifunctional lifting system | |
CN202732230U (en) | Tower-type vertical axis windmill generator set | |
CN202571649U (en) | Rack of steel pipe assembling and welding device | |
CN202765518U (en) | Steel bar support frame | |
CN202384693U (en) | Multifunctional member formed on-pole live-line operation platform | |
CN202117863U (en) | Multi-layer tower barrel supporting device | |
CN206620023U (en) | Motor pole dismantling device | |
CN201742338U (en) | Multipoint bearing structure of solar double-axis automatic tracking photovoltaic power station | |
CN201645461U (en) | Megawatt-stage wind power generator integral assembling platform | |
CN201940422U (en) | Double-memorial arch adjusting device | |
CN204334434U (en) | Mounting bracket | |
CN205251399U (en) | Wipe window machine plurality of pendulums peak of staff wheel mechanism | |
CN204455850U (en) | The interim suspension connection device of Large Steel box beam erection | |
CN203192811U (en) | Base and support for photovoltaic module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200911 Address after: No.218, Jinxiu Avenue, Feixi economic and Technological Development Zone, Hefei City, Anhui Province Patentee after: Anhui Hongyuan Steel Structure Co., Ltd Address before: 230031 Anhui province Hefei Dayang Industrial Park Chong Road No. 6 Patentee before: ANHUI HONGYUAN LINE EQUIPMENT Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110810 |