CN201915421U CN2010206477399U CN201020647739U CN201915421U CN 201915421 U CN201915421 U CN 201915421U CN 2010206477399 U CN2010206477399 U CN 2010206477399U CN 201020647739 U CN201020647739 U CN 201020647739U CN 201915421 U CN201915421 U CN 201915421U
Authority
CN
China
Prior art keywords
steel pipe
flange
pile
pipe pile
interface structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206477399U
Other languages
Chinese (zh)
Inventor
沈求良
卢慧清
周辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai South Power Supply Design Co., Ltd.
Original Assignee
SHANGHAI JINXUAN CONSTRUCTION ENGINEERING Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JINXUAN CONSTRUCTION ENGINEERING Co Ltd, Shanghai Municipal Electric Power Co filed Critical SHANGHAI JINXUAN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN2010206477399U priority Critical patent/CN201915421U/en
Application granted granted Critical
Publication of CN201915421U publication Critical patent/CN201915421U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a top interface structure for a press-in flange pile. The top interface structure comprises a steel pipe pile and a steel pipe fixed with the steel pipe pile, wherein the steel pipe pile is a press-in flange pile; and the steel pipe pile and the steel pipe are fixedly connected with each other through a flange plate. In the utility model, the flange plate is adopted to be in close connection with the top of the steel pipe pile, and is stressed uniformly; and the steel pipe pile is the press-in flange pile capable of being directly butted with the steel pipe at the bottom of which the flange plate is fixed. The top interface structure provided by the utility model is simple to operate, has short construction period, and can be used repeatedly as the steel pipe can not be damaged when removed.

Description

A kind of top interface structure that is used for forced flange stake
Technical field
The utility model relates to field of electrical equipment, relates in particular to a kind of top interface structure that is used for forced flange stake.
Background technology
Firm electric pole uses suspension cable usually, but use suspension cable to tend to hinder the unimpeded of sidewalk with clean and tidy, also influence simultaneously passerby's normal walking, in today of science and technology prosperity, be not have suspension cable only could firm electric pole, at present normally used is that the combination of steel pipe and steel pipe pile substitutes this suspension cable structure.But in work progress, there is following two large problems:
1. for steel pipe, when removing steel pipe, steel pipe can't be pulled up from steel pipe pile, the method of having to take to cut is cut off the back dismounting with steel pipe, and the steel pipe after removing can't utilize once more, this is undoubtedly huge waste for the steel pipe that can reach 30 years application life, run counter to the theory of energy-conserving and environment-protective.
2. for steel pipe pile, need carry out soil excavation, can use a large amount of concrete, and the outer National Games of earth impact to surrounding enviroment, simultaneously, owing to need concreting in the construction, curing time was generally 15 to 28 days, will greatly influence construction speed, for tighter engineering of duration, steel pipe pile has become to influence the first difficult problem of construction speed undoubtedly, and this can reduce the efficient of construction greatly.
Therefore, in order to shorten construction period, and reach the purpose of economical with materials, make when steel pipe is pulled out, do not damage steel pipe, steel pipe can utilize once more, through comparing, consider to adopt the structure of forced flange stake, promptly at place, electric pole stake position, cutting depth is 1 to 2 meter bar hole, and the flange stake is stood in the bar hole, static pressure vertically downward is pressed among the earth in addition, and then fixes with steel pipe.Can fix in the following way between steel pipe pile and the steel pipe:
The electric welding connected mode, this mode closely is connected with steel pipe by the foundation bolt of flange stake, but because foundation bolt will bear the power of overturning of very big electric pole body and the tension force of lead, therefore require very high to welding and bolt material, and, bolt exposes and is not easy to transportation and carrying, and the pile body overall structure is relatively poor;
Primary screw connects, and this mode city is fixed by this mode by burrowing on steel pipe pile, but in this mode, the stress point of whole foundation foot bolt concentrates on several stove bolt places, and stress point is uniform distribution not, so this scheme can not adopt.
Adopting which kind of interface structure between steel pipe pile and the steel pipe is that the present inventor is devoted to the problem studying and solve.
Summary of the invention
The purpose of this utility model is to overcome the defective of prior art and a kind of top interface structure that is used for forced flange stake is provided, and it can shorten construction period, and economical with materials, when steel pipe is pulled out, does not damage steel pipe, and can utilize once more.
The technical scheme that realizes above-mentioned purpose is: a kind of top interface structure that is used for forced flange stake, comprise steel pipe pile and the steel pipe of fixing with this steel pipe pile, wherein, described steel pipe pile is forced flange stake, fixedlys connected by a flange disk between described steel pipe pile and the described steel pipe.
The above-mentioned top interface structure that is used for forced flange stake, wherein, the size of described flange disk is big or small consistent with described steel pipe bottom, and fixing with this steel pipe bottom.
The above-mentioned top interface structure that is used for forced flange stake, wherein, the top of described steel pipe pile size is big or small consistent with described flange disk.
The beneficial effects of the utility model are: the utility model is by adopting the flange disk, make the flange disk closely to be connected with the top of steel pipe pile, stressed even, steel pipe pile has adopted forced flange stake, can directly achieve a butt joint with the steel pipe that the bottom is fixed with the flange disk, simple to operate, short construction period.
Description of drawings
Fig. 1 is the split schematic diagram that is used for the top interface structure of forced flange stake of the present utility model.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
See also Fig. 1, there is shown a kind of top interface structure that is used for forced flange stake of the present utility model, comprise steel pipe pile 1 and with the fixing steel pipe 2 of this steel pipe pile 1, steel pipe pile 1 is forced flange stake, fixedlys connected by a flange disk 3 between steel pipe pile 1 and the steel pipe 2.
The size of flange disk 3 is big or small consistent with steel pipe 2 bottoms, and fixes with these steel pipe 2 bottoms, and the top size of steel pipe pile 1 is big or small consistent with flange disk 3.
In the utility model, reduced the diameter of steel pipe pile 1, made that its footpath, the end with steel pipe 2 is consistent, both can realize directly butt joint by flange disk 3, and are simple in structure, and short construction period is stressed even, convenient disassembly.
Above embodiment is only for the usefulness that the utility model is described, but not to restriction of the present utility model, person skilled in the relevant technique, under the situation that does not break away from spirit and scope of the present utility model, can also make various conversion or modification, therefore all technical schemes that are equal to also should belong to category of the present utility model, should be limited by each claim.

Claims (3)

1. top interface structure that is used for forced flange stake, comprise steel pipe pile and the steel pipe of fixing with this steel pipe pile, it is characterized in that described steel pipe pile is forced flange stake, fixedly connected by a flange disk between described steel pipe pile and the described steel pipe.
2. the top interface structure that is used for forced flange stake according to claim 1 is characterized in that, the size of described flange disk is big or small consistent with described steel pipe bottom, and fixing with this steel pipe bottom.
3. the top interface structure that is used for forced flange stake according to claim 1 and 2 is characterized in that, the top size of described steel pipe pile is big or small consistent with described flange disk.
CN2010206477399U 2010-12-08 2010-12-08 Top interface structure for press-in flange pile Expired - Lifetime CN201915421U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206477399U CN201915421U (en) 2010-12-08 2010-12-08 Top interface structure for press-in flange pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206477399U CN201915421U (en) 2010-12-08 2010-12-08 Top interface structure for press-in flange pile

Publications (1)

Publication Number Publication Date
CN201915421U true CN201915421U (en) 2011-08-03

Family

ID=44415225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206477399U Expired - Lifetime CN201915421U (en) 2010-12-08 2010-12-08 Top interface structure for press-in flange pile

Country Status (1)

Country Link
CN (1) CN201915421U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107191055A (en) * 2017-07-13 2017-09-22 国家电网公司 A kind of electric pole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107191055A (en) * 2017-07-13 2017-09-22 国家电网公司 A kind of electric pole

Similar Documents

Publication Publication Date Title
CN101812842B (en) Tensionless filling pile structure
CN104110039A (en) Fan base with pressure dispersed type arrangement high-strength pre-stressed anchor rods (cables)
CN205839751U (en) A kind of reinforcement protection device of bridge pile foundation
CN105298205B (en) A kind of power network electric pole reinforces heightening device and its construction method
CN201915421U (en) Top interface structure for press-in flange pile
CN201649071U (en) Unstressing cast-in-place pile
CN202610862U (en) Telegraph pole pit drilling device
CN107165468A (en) A kind of power network electric pole reinforces the construction method of heightening device
CN202194152U (en) Power steel pipe tower base
CN202787296U (en) Foundation structure of anchor pole blower fan
CN205776297U (en) A kind of tidal power generating bored concrete pile foundation with doughnut-shaped steel plate hoop
CN204125965U (en) There is the blower foundation that pressure dispersing type arranges high-strength prestressed anchor bar/anchor cable
CN105870650B (en) Reduce ground resistance method using ground resistance earth anchor
CN204701953U (en) A kind of building timber bracing or strutting arrangement
CN207331663U (en) A kind of earth working material bee lattice fixed connection apparatus
CN203322513U (en) Double-supporting-leg type petroleum pipeline protective device
CN203674643U (en) Device for drawing power-cable protection tube
CN201915397U (en) Pile body structure for press-in type flange pile
CN202509516U (en) +/-800 KV direct current composite clay anchor rod foundation
CN207277864U (en) A kind of concrete temporary support moulding bed for large-scale steel structure assembly
CN202347528U (en) Steel tube inserted foundation
CN204343777U (en) A kind of convenient line bar base
CN221142813U (en) Efficient rock slope surface soil fixing equipment
CN203349970U (en) Wire vibrating anchor cable dynamometer
CN205475220U (en) Prestressed anchorage hitch constructs

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI SOUTH POWER SUPPLY DESIGN CO., LTD.

Free format text: FORMER OWNER: SHANGHAI JINXUAN CONSTRUCTION ENGINEERING CO., LTD.

Effective date: 20120321

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200540 JINSHAN, SHANGHAI TO: 200233 XUHUI, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20120321

Address after: 200233 No. 222 Qin Jiang Road, Xuhui District

Co-patentee after: Shanghai Electric Power Corporation

Patentee after: Shanghai South Power Supply Design Co., Ltd.

Address before: 200540 room 3, building 1621, 136 Jinshan Road, Shanghai, Jinshan District

Co-patentee before: Shanghai Electric Power Corporation

Patentee before: Shanghai Jinxuan Construction Engineering Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110803