CN201910589U - Monitoring distribution structure of GIS (Geographic Information System) substation - Google Patents

Monitoring distribution structure of GIS (Geographic Information System) substation Download PDF

Info

Publication number
CN201910589U
CN201910589U CN2010206880303U CN201020688030U CN201910589U CN 201910589 U CN201910589 U CN 201910589U CN 2010206880303 U CN2010206880303 U CN 2010206880303U CN 201020688030 U CN201020688030 U CN 201020688030U CN 201910589 U CN201910589 U CN 201910589U
Authority
CN
China
Prior art keywords
gis
substation
transformer station
main entrance
ball machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206880303U
Other languages
Chinese (zh)
Inventor
段新辉
刘继权
高新华
谢善益
高雅
梁晓兵
陈炯聪
赵永发
张飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN2010206880303U priority Critical patent/CN201910589U/en
Application granted granted Critical
Publication of CN201910589U publication Critical patent/CN201910589U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a monitoring distribution structure of a GIS (Geographic Information System) substation. The monitoring distribution structure is characterized in that a high-speed balling machine (7) is arranged at the top of a side room of a front door of a warning reception room (3); a main-speed balling machine (7) is arranged at the top of one side wall of an affiliated building of power distribution equipment (1) along a main trunk; one high-speed balling machine (7) is also arranged at the center of a high-voltage wire inlet base station (2); and the tail end of the main trunk (5) is also provided with one high-speed balling machine (7). In the monitoring distribution structure disclosed by the utility model, the selection and layout of monitoring equipment are reasonable in structure, so that not only can omnibearing monitoring on the GIS substation be realized, and safe operation of the GIS substation is furthest ensured, but also the input cost of the monitoring equipment of the substation is reduced.

Description

GIS supervisory control of substation layout structure
Technical field
The utility model relates to the layout structure of supervisory control of substation equipment, particularly relates to the layout structure of the watch-dog of GIS transformer station in the transformer station.
Background technology
Controller switching equipment in the GIS transformer station adopts sulphur hexafluoride (SF6) gas of insulation property and arc extinction performance excellence as insulation and arc-extinguishing medium gas, and GIS transformer station has that floor space is little, the whole sealings of element are not subjected to environmental interference, operational reliability height, operation make things convenient for, advantages such as the time between overhauls(TBO) is long, maintenance workload is little, installation is rapid, operating cost is low, no electromagnetic interference.The outdoor GIS of existing 110kV transformer station comprises distribution assembling building, high pressure inlet wire base station, alert chamber and pump house four parts of passing, and separates the both sides that are arranged on transformer station by major trunk roads, is provided with main entrance alert the biography between chamber and the high pressure inlet wire base station.At present, selection of the watch-dog of GIS transformer station and layout structure are generally more unreasonable, not only can not monitor the real-time video of GIS transformer station effectively, lack the measure that prevents external danger, and the input cost of watch-dog is comparatively expensive.
The utility model content
The purpose of this utility model is, a kind of GIS supervisory control of substation layout structure is provided.The selection and the layout structure of the utility model watch-dog are reasonable, not only can realize the conduct monitoring at all levels to GIS transformer station, have farthest guaranteed the safe operation of GIS transformer station; And the utility model has reduced the input cost of supervisory control of substation equipment.
The technical solution of the utility model: GIS supervisory control of substation layout structure, transformer station comprises distribution assembling building, high pressure inlet wire base station, alert chamber and pump house four parts of passing, and separate the both sides that are arranged on transformer station by major trunk roads, be provided with main entrance alert the biography between chamber and the high pressure inlet wire base station; The described alert top, main entrance side room that passes the chamber is provided with the clipping the ball machine, and pushing up along major trunk roads one side wall of distribution assembling building is provided with main fast ball machine, and central authorities also are provided with the clipping the ball machine in high pressure inlet wire base station; The tail end of major trunk roads also is provided with the clipping the ball machine.
In the above-mentioned GIS supervisory control of substation layout structure, the main entrance side of described transformer station is provided with three pairs of infrared correlation probes, and a pair of infrared correlation probe is arranged on the main entrance both sides, in addition two pairs of right angle side and positive reveals that infrared correlation is popped one's head in and is separately positioned on the main entrance side; Other three side in transformer station also is respectively arranged with a pair of infrared correlation probe.
Compared with prior art, the utility model is provided with the clipping the ball machine in four main positions of major trunk roads, with less clipping the ball machine quantity, forms a tight video monitoring net, can realize real-time video monitoring transformer station; Four sides in GIS transformer station are equipped with infrared correlation probe simultaneously, can monitor and warn external intrusion in real time, realize the conduct monitoring at all levels to GIS transformer station.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Embodiment
The utility model is described in further detail below in conjunction with drawings and Examples, but not as to any restriction of the present utility model.
Embodiment.The utility model as shown in Figure 1.GIS supervisory control of substation layout structure, transformer station comprises distribution assembling building 1, high pressure inlet wire base station 2, alert chamber 3 and pump house 4 four parts of passing, and separates the both sides that are arranged on transformer station by major trunk roads 5, is provided with main entrance 6 alert the biography between chamber 3 and the high pressure inlet wire base station 2; The described alert top, main entrance side room that passes chamber 3 is provided with clipping the ball machine 7, and distribution is adorned pushing up along major trunk roads one side wall of 1 annex and is provided with main fast ball machine 7, and 2 central authorities also are provided with clipping the ball machine 7 in high pressure inlet wire base station; The tail end of major trunk roads 5 also is provided with clipping the ball machine 7.The utility model is provided with the clipping the ball machine in four main positions of major trunk roads, with less clipping the ball machine quantity, forms a tight video monitoring net, can realize real-time video monitoring transformer station.
The main entrance side of transformer station is provided with three pairs of infrared correlation probes 8, and a pair of infrared correlation probe 8 is arranged on main entrance 6 both sides, and other two pairs of infrared correlation probes 8 are separately positioned on the right angle side and the positive reveal of main entrance side; Other three side in transformer station also is respectively arranged with a pair of infrared correlation probe 8.

Claims (2)

1.GIS supervisory control of substation layout structure, transformer station comprises distribution assembling building (1), high pressure inlet wire base station (2), alert chamber (3) and pump house (4) four parts of passing, and separate the both sides that are arranged on transformer station by major trunk roads (5), be provided with main entrance (6) alert the biography between chamber (3) and the high pressure inlet wire base station (2); It is characterized in that: the described alert top, main entrance side room that passes chamber (3) is provided with clipping the ball machine (7), and pushing up along major trunk roads one side wall of distribution dress (1) annex is provided with main fast ball machine (7), and central authorities also are provided with clipping the ball machine (7) in high pressure inlet wire base station (2); The tail end of major trunk roads (5) also is provided with clipping the ball machine (7).
2. GIS supervisory control of substation layout structure according to claim 1, it is characterized in that: the main entrance side of described transformer station is provided with three pairs of infrared correlation probes (8), a pair of infrared correlation probe (8) is arranged on main entrance (6) both sides, and two pairs of infrared correlation probes (8) are separately positioned on the right angle side and the positive reveal of main entrance side in addition; Other three side in transformer station also is respectively arranged with a pair of infrared correlation probe (8).
CN2010206880303U 2010-12-29 2010-12-29 Monitoring distribution structure of GIS (Geographic Information System) substation Expired - Lifetime CN201910589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206880303U CN201910589U (en) 2010-12-29 2010-12-29 Monitoring distribution structure of GIS (Geographic Information System) substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206880303U CN201910589U (en) 2010-12-29 2010-12-29 Monitoring distribution structure of GIS (Geographic Information System) substation

Publications (1)

Publication Number Publication Date
CN201910589U true CN201910589U (en) 2011-07-27

Family

ID=44302788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206880303U Expired - Lifetime CN201910589U (en) 2010-12-29 2010-12-29 Monitoring distribution structure of GIS (Geographic Information System) substation

Country Status (1)

Country Link
CN (1) CN201910589U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105760580A (en) * 2015-09-30 2016-07-13 洛阳摩丁塑业有限公司 Communication electronic equipment graphic operation system based on model calculation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105760580A (en) * 2015-09-30 2016-07-13 洛阳摩丁塑业有限公司 Communication electronic equipment graphic operation system based on model calculation
CN105760580B (en) * 2015-09-30 2019-03-15 洛阳摩丁塑业有限公司 A kind of communication electronic equipment exercise on maps system calculated based on model

Similar Documents

Publication Publication Date Title
CN204463378U (en) The two Leakage Gas monitoring mobile phone warning system of sulfur hexafluoride, oxygen
CN201910589U (en) Monitoring distribution structure of GIS (Geographic Information System) substation
CN205195130U (en) Intelligence high tension switchgear based on internet +
CN203722060U (en) New type high-voltage switch cabinet
CN110112670A (en) Preassembled transformer station is minimized on a kind of column
CN201918804U (en) Indoor first-layer monitor layout structure of indoor GIS (global information system) transformer substation
CN203466460U (en) Air inlet structure of cable chamber of built-in cabinet
CN203242927U (en) Intelligent ring main unit
CN205789679U (en) A kind of sulfur hexafluoride ring network switch being applied to plateau wind energy turbine set
CN206727522U (en) A kind of armoured
CN205212246U (en) Intelligent control system of box -type substation
CN204835262U (en) High pressure / low pressure prepackage type transformer substation
CN201956606U (en) Monitoring layout structure of second floor in indoor GIS (Gas Insulated Substation) chamber
CN203367816U (en) Multifunctional safety isolation plate
CN207559421U (en) A kind of arrangement of GIS device
CN202735191U (en) Online monitoring system for density and trace moisture of SF6 (sulfur hexafluoride)
CN202978084U (en) Metal closed ring network switch cabinet
CN201690124U (en) Extended busbar of intelligent ring main unit
CN206019850U (en) A kind of wireless temperature measuring device
CN109309347A (en) A kind of high-performance Electric Appliance Cabinet external shell protection structure
CN204652572U (en) Based on the orthoscopic supervisory control system of microwave
CN202872254U (en) Remote video monitoring system for high voltage transmission line
CN202004337U (en) Vacuum arc extinguishing assembly chamber of floor box AC high-voltage intelligent switch cabinet
CN208752838U (en) A kind of movable type repair based on condition of component training three-phase enclosed main bus structure entity
CN203301237U (en) Monitoring device and system for ring main unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20110727

CX01 Expiry of patent term