CN201918804U - Indoor first-layer monitor layout structure of indoor GIS (global information system) transformer substation - Google Patents

Indoor first-layer monitor layout structure of indoor GIS (global information system) transformer substation Download PDF

Info

Publication number
CN201918804U
CN201918804U CN 201020688068 CN201020688068U CN201918804U CN 201918804 U CN201918804 U CN 201918804U CN 201020688068 CN201020688068 CN 201020688068 CN 201020688068 U CN201020688068 U CN 201020688068U CN 201918804 U CN201918804 U CN 201918804U
Authority
CN
China
Prior art keywords
indoor
layout structure
chamber
power distribution
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201020688068
Other languages
Chinese (zh)
Inventor
刘继权
谢善益
高雅
梁晓兵
陈炯聪
段新辉
赵永发
张飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN 201020688068 priority Critical patent/CN201918804U/en
Application granted granted Critical
Publication of CN201918804U publication Critical patent/CN201918804U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • Y02B70/3266
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Abstract

The utility model discloses an indoor first-layer monitor layout structure of an indoor GIS (global information system) transformer substation. A power distribution equipment room (1), a grounding transformer room (2), more than one capacitor room (3) and more than one main transformer room (4) are arranged on the first layer of the indoor first-layer monitor layout structure. The indoor first-layer monitor layout structure is characterized in that a medium-speed ball type camera shooting assembly (5) is arranged on the roof between each two adjacent power distribution devices inside the power distribution equipment room, a medium-speed ball type camera shooting assembly (6) is disposed in the center of the roof of each of the grounding transformer room (2) and the capacitor rooms (3), and a high-speed ball type camera shooting assembly (7) is arranged in the center of the roof of each main transformer room (4). The indoor first-layer monitor layout structure is reasonable in selection of monitor equipment and layout structure, can realize directional monitor of the indoor first layer of the indoor GIS transformer substation, and guarantees safety running of production equipment in first equipment to the utmost extent.

Description

Indoor GIS transformer station indoor ground floor monitoring layout structure
Technical field
The utility model relates to the layout structure of supervisory control of substation equipment, particularly relates to indoor GIS transformer station indoor ground floor monitoring layout structure
Background technology
Controller switching equipment in the GIS transformer station adopts sulphur hexafluoride (SF6) gas of insulation property and arc extinction performance excellence as insulation and arc-extinguishing medium gas, and GIS transformer station has that floor space is little, the whole sealings of element are not subjected to environmental interference, operational reliability height, operation make things convenient for, advantages such as the time between overhauls(TBO) is long, maintenance workload is little, installation is rapid, operating cost is low, no electromagnetic interference.Existing indoor GIS transformer station generally comprises two-layer, and ground floor comprises that power distribution equipment chamber, ground connection become chamber, capacitor chamber and transformer chamber; The second layer comprises switchgear house, electrical secondary equipment chamber, communication room and battery room; Safe operation for indoor GIS transformer station, indoors GIS transformer station is indoor must be equipped with watch-dog, yet existing application indoors the watch-dog of the indoor ground floor of GIS transformer station select and layout structure generally more unreasonable, not only can not monitor the equipment operation situation and the internal security environment of the indoor ground floor of indoor GIS transformer station effectively, occurring the monitoring dead angle easily influences the safety of transformer station, and irrational watch-dog selects also to have caused the redundancy of equipment, the rising of cost.
The utility model content
The purpose of this utility model is, a kind of indoor GIS transformer station indoor ground floor monitoring layout structure is provided.The selection and the layout structure of the utility model watch-dog are reasonable, can realize the conduct monitoring at all levels to the indoor ground floor of indoor GIS transformer station, have farthest guaranteed the safe operation of production equipment in first equipment.
The technical solution of the utility model: indoor GIS transformer station indoor ground floor monitoring layout structure, ground floor is provided with power distribution equipment chamber, ground connection and becomes chamber, an above capacitor chamber and an above transformer chamber, it is characterized in that: the roof between the indoor adjacent power distribution equipment of described power distribution equipment is provided with middling speed ball machine; The roof central authorities that ground connection becomes chamber and every capacitor are provided with middling speed ball machine; The roof central authorities of every transformer chamber are provided with the clipping the ball machine.
Before the above-mentioned indoor GIS transformer station indoor ground floor monitoring layout structure, the both walls limit of described power distribution equipment chamber respectively is provided with fixed cameras.
Compared with prior art, the roof of the utility model between the indoor adjacent power distribution equipment of power distribution equipment is provided with middling speed ball machine, can not only monitor the running status of power distribution equipment, can also monitor the indoor situation of power distribution equipment chamber, to power distribution equipment chamber indoor carry out in real time, the video monitorings of 360 degree; The utility model also is provided with middling speed ball machine in the roof central authorities of ground connection change chamber and every capacitor; The roof central authorities of every transformer chamber are provided with the clipping the ball machine, have both realized monitoring in real time equipment running status and indoor security situation in ground connection change chamber, capacitor and the transformer chamber, and have reduced the certain device cost.Two long side wall limits of power distribution equipment chamber are provided with fixed cameras in addition, because power distribution equipment can cover the visual angle of central middling speed ball machine, therefore the fixed cameras on two long side wall limits can be monitored the monitoring dead angle of power distribution equipment chamber, and fixed cameras also the cost than middling speed ball machine is low, therefore two fixed cameras and middling speed ball machine not only can be comprehensive, with multi-angle video monitoring is carried out in the power distribution equipment chamber, and with cost control in desirable scope.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Embodiment
The utility model is described in further detail below in conjunction with drawings and Examples, but not as to any restriction of the present utility model.
Embodiment.The utility model as shown in Figure 1.Indoor GIS transformer station indoor ground floor monitoring layout structure, ground floor is provided with power distribution equipment chamber 1, ground connection and becomes chamber 2, an above capacitor chamber 3 and an above transformer chamber 4, and the roof in the described power distribution equipment chamber 1 between the adjacent power distribution equipment 4 is provided with middling speed ball machine 5; The both walls limit of power distribution equipment chamber 1 respectively is provided with fixed cameras 8.The roof central authorities that ground connection becomes chamber 2 and every capacitor 3 are provided with middling speed ball machine 6; The roof central authorities of every transformer chamber 4 are provided with clipping the ball machine 7.

Claims (2)

1. indoor GIS transformer station indoor ground floor monitoring layout structure, ground floor is provided with power distribution equipment chamber (1), ground connection and becomes chamber (2), an above capacitor chamber (3) and an above transformer chamber (4), it is characterized in that: the roof in the described power distribution equipment chamber (1) between the adjacent power distribution equipment (4) is provided with middling speed ball machine (5); The roof central authorities that ground connection becomes chamber (2) and every capacitor (3) are provided with middling speed ball machine (6); The roof central authorities of every transformer chamber (4) are provided with clipping the ball machine (7).
2. indoor GIS transformer station according to claim 1 indoor ground floor monitoring layout structure, it is characterized in that: the both walls limit of described power distribution equipment chamber (1) respectively is provided with fixed cameras (8).
CN 201020688068 2010-12-29 2010-12-29 Indoor first-layer monitor layout structure of indoor GIS (global information system) transformer substation Expired - Lifetime CN201918804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020688068 CN201918804U (en) 2010-12-29 2010-12-29 Indoor first-layer monitor layout structure of indoor GIS (global information system) transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020688068 CN201918804U (en) 2010-12-29 2010-12-29 Indoor first-layer monitor layout structure of indoor GIS (global information system) transformer substation

Publications (1)

Publication Number Publication Date
CN201918804U true CN201918804U (en) 2011-08-03

Family

ID=44418593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020688068 Expired - Lifetime CN201918804U (en) 2010-12-29 2010-12-29 Indoor first-layer monitor layout structure of indoor GIS (global information system) transformer substation

Country Status (1)

Country Link
CN (1) CN201918804U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104159070A (en) * 2014-06-24 2014-11-19 国网浙江海盐县供电公司 Smart alarm positioning device for pick-up heads of transformer station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104159070A (en) * 2014-06-24 2014-11-19 国网浙江海盐县供电公司 Smart alarm positioning device for pick-up heads of transformer station

Similar Documents

Publication Publication Date Title
CN201667498U (en) Box type transformer substation for open-pit mine
CN206195223U (en) Box type transformer station
CN201918804U (en) Indoor first-layer monitor layout structure of indoor GIS (global information system) transformer substation
CN204333621U (en) Intermediate switchgear cabinet entirety walks line mechanism
CN204515589U (en) Moving miniature data center
CN205723336U (en) Contactless safe circuit switching device
CN201956606U (en) Monitoring layout structure of second floor in indoor GIS (Gas Insulated Substation) chamber
CN201910589U (en) Monitoring distribution structure of GIS (Geographic Information System) substation
CN204012905U (en) Intelligent duplicate power supply conversion vacuum switch cabinet
CN203660330U (en) Ring main unit
CN203278057U (en) Intelligent prefabricated transformer substation
CN202978084U (en) Metal closed ring network switch cabinet
CN203434470U (en) A cabinet structure in a box-sharing function-combining metallic enclosed high-voltage switchgear
CN201690124U (en) Extended busbar of intelligent ring main unit
CN202586129U (en) 110kV combination electric appliance GIS applied to integrated, prefabricated and box type substation
CN206516960U (en) The integrated intelligent traction substation of prepackage type
CN205666497U (en) Block terminal is synthesized to intelligent electric wire netting
CN204441783U (en) The mixed type power distribution equipment loop of a kind of 220kV GIS and opening-type equipment
CN202474836U (en) Outdoor high-voltage opened type bus protection composite apparatus
CN202905973U (en) Multilayer terminal block
CN202353080U (en) Miniaturized gas insulation metal sealing switchgear
CN204615235U (en) A kind of box-type substation
CN201947055U (en) Monitoring equipment layout structure of master control building in AIS (air insulated switchgear) transformer substation
CN208385985U (en) 40.5kV intelligent inflating switch cabinet
CN201887349U (en) Intelligent heat dissipation device for high-voltage switch cabinet

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110803