CN201909827U - Insulating rope test bench - Google Patents

Insulating rope test bench Download PDF

Info

Publication number
CN201909827U
CN201909827U CN2010206484570U CN201020648457U CN201909827U CN 201909827 U CN201909827 U CN 201909827U CN 2010206484570 U CN2010206484570 U CN 2010206484570U CN 201020648457 U CN201020648457 U CN 201020648457U CN 201909827 U CN201909827 U CN 201909827U
Authority
CN
China
Prior art keywords
conductor
arc
lower conductor
ply
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206484570U
Other languages
Chinese (zh)
Inventor
李明
李昆
高世伟
梁方建
张申
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN ELECTRIC POWER COMPANY SHANGQIU POWER SUPPLY Co
Original Assignee
HUNAN ELECTRIC POWER COMPANY SHANGQIU POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN ELECTRIC POWER COMPANY SHANGQIU POWER SUPPLY Co filed Critical HUNAN ELECTRIC POWER COMPANY SHANGQIU POWER SUPPLY Co
Priority to CN2010206484570U priority Critical patent/CN201909827U/en
Application granted granted Critical
Publication of CN201909827U publication Critical patent/CN201909827U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

An insulating rope test bench comprises a bench base, an upper conductor, a lower conductor, two insulating support rods and arc-shaped clamps. The lower conductor is welded on the base and provided with a ground point, the two insulating support rods are respectively arranged on two sides of the conductor vertically, upper ends of the two insulating support rods are connected by the upper conductor, a connecting bar is arranged at one end of the upper conductor and used for connecting a test lead, both the upper conductor and the lower conductor are provided with movable arc-shaped clamps, and the distance between each upper arc-shaped clamp and each lower arc-shaped clamp corresponding to the same is 0.5m. An insulating rope is wound on the upper conductor and the lower conductor on the bench, and a high-voltage lead is connected to the connecting bar of the upper conductor and then is connected with a ground point on the lower conductor through a grounding wire, so that voltage is applied to the upper conductor and alternating-current withstand voltage test can be performed. The insulating rope test bench is simple in structure and high in efficiency, and can be used for insulation test for a longer insulating rope each time. Further, the insulating rope test bench cannot be affected by surrounding environments, current through different sections of the insulating rope and voltage applied to the same are equal, and test results are accurate.

Description

Insulation rope test-bed
Technical field
The utility model relates to a kind of device that the insulation rope is carried out power frequency withstand test.
Background technology
The insulation rope is an indispensable managing security tools and instruments in the electric system, is used by wide model because its flexibility is good, intensity is high, insulating property are strong.Its effect is: 1, can be used as during hot line job and tie up rope and transmit rope; 2, also can be used as lifting rope under the situation about meeting the demands as intensity; 3, also can be used as during non-hot line job and tie up rope and transmit rope; 4, scale also can be used as in live zone and measures chi and use (" electric power safety working regulation " regulation is forbidden to use steel tape, tape measure in live zone and had the line chi of electric conductivity) on the notes; 5, do isolation strip usefulness, separate charged and power failure equipments, show with indicating.
Because the insulation rope will directly contact with live part sometimes; Non-direct contact also is unlikely to the time because the effect of wind or other external force misses the insulation rope bumps live part and cause security incident.Regulation in " so electric power safety working regulation ": the insulation rope will be done AC voltage withstand test (rules require 105kV/0.5m).Method commonly used now when the insulation rope is done experiment is: the insulation rope is hung get up to carry out AC voltage withstand test.This way: 1, not only original but also be subjected to the influence big (as wind) of surrounding environment; 2, the insulation rope is longer, and one section one section (0.5m) tests consuming time long, relatively more clumsy simultaneously; 3, multiply is brought together when testing together, because the kelvin effect of electric current, the distribution that adds to electric field intensity is irregular, and making the electric current that flows through on every section insulation rope is different with the voltage that is born, do not reach every section purpose of carrying out AC voltage withstand test like this, this method is unavailable.
Summary of the invention
In order to overcome difficulty that above-mentioned reason brings and not enough, the utility model provides a kind of device that the insulation rope is tested, and uses this device to carry out AC voltage withstand test to multistage insulation rope simultaneously.
The technical scheme that solution the utility model problem is adopted is: design one insulation rope test-bed, and stand can be designed to random length; It comprises the stand base, goes up lower conductor, insulation strut, and the stand base is made with metal, and lower conductor is welded on the stand base, and designs an earth point, is used for linking to each other with grounding body; Upper conductor is located at the lower conductor top, is connected by insulation strut between the two, and designs a wiring handle, and in order to connect test lead, last lower conductor is parallel to each other; Be provided with mobilizable arc ply-yarn drill on last lower conductor, the arc ply-yarn drill on the last lower conductor is crisscross arranged, and each curved line is fastened on the centre of corresponding top or following two arc ply-yarn drills, and the distance between the arc ply-yarn drill of per up and down two correspondences is 0.5m; Concrete test method is: on the upper and lower last lower conductor that is wrapped on the stand of insulation rope, mate each arc ply-yarn drill respectively and compress the insulation rope; High-voltage connection is connected on the wiring handle place of upper conductor, and upper conductor is as high-pressure side; Be connected on earth point place on the lower conductor with a ground wire, base is as earth potential; Upper conductor is applied voltage, can carry out AC voltage withstand test.
Last lower conductor is that xsect is circular straight-bar or annulus or elliptical ring or polygon annular.
Because the thickness of insulation rope does not wait, arc ply-yarn drill next door all has aperture on electric conductor up and down, rotates the arc ply-yarn drill, and the end of arc ply-yarn drill can enter that the insulation rope that diameter is thinner compresses in the aperture.
Good effect of the present utility model is: test-bed is simple in structure, makes easily, and is with low cost, economical and practical; Once can carry out Insulation Test, high efficiency to very long insulation rope; Be not subjected to the influence of surrounding environment, electric current that flows through and the voltage that is born are impartial on every section insulation rope, and test findings is accurate; By regulating each arc ply-yarn drill, can carry out AC voltage withstand test to the insulation rope of different thicknesses.
Description of drawings
Accompanying drawing is that last lower conductor is the user mode synoptic diagram of the present utility model of straight-bar.
Embodiment
As shown in drawings, stand can be made any length as required; Stand base 1 usefulness metal is made, and welding one lower conductor 2 at one end designs an earth point 3 on the stand base 1, is used for linking to each other with grounding body; Connect an insulation strut 4,5 respectively at lower conductor 2 both sides vertical directions, the epoxy resin enhancement mode glass fibre solid post that insulation strut 4,5 adopts excellent performance is as the major insulation material, and dielectric strength will be higher than 105kV far away; Two insulation strut 4,5 upper ends are connected by upper conductor 6, at one end design a wiring handle 9, in order to connect test lead, last lower conductor 6,2 is copper cylinder or copper pipe, last lower conductor 6,2 is isometric and be parallel to each other, and the insulation strut 4,5 of last lower conductor 6,2 and both sides is formed a framed structure; On upper conductor 6 and below lower conductor 2, be equipped with mobilizable arc ply-yarn drill 7, arc ply-yarn drill 7 on the last lower conductor 6,2 is crisscross arranged, each arc ply-yarn drill 7 is located at the centre of corresponding top or following two arc ply-yarn drills, distance between the arc ply-yarn drill 7 of per up and down two correspondences is 0.5m, promptly as shown in drawings, from a point to the b point, from the b point to the c point, by that analogy, be 0.5m.Because the thickness of insulation rope 10 does not wait, arc ply-yarn drill 7 next doors all have aperture 8 on last lower conductor 6,2, rotate arc ply-yarn drill 7, and the end of arc ply-yarn drill 7 can be inserted the interior insulation rope 10 that diameter is thinner of aperture and be compressed.
Concrete test method is: below the arc ply-yarn drill 7 on the insulation rope 10 upper and lower last lower conductors 6,2 that are wrapped on the stand, mate each arc ply-yarn drill 7 respectively and compress insulation rope 10; High-voltage connection is connected on wiring handle 9 places of upper conductor 6, and upper conductor 6 is as high-pressure side; Be connected on earth point 3 places on the lower conductor 2 with a ground wire, stand base 1 is as earth potential; Upper conductor 6 is applied voltage, can carry out AC voltage withstand test, test is finished, and pulls down insulation rope 10 and can use.

Claims (3)

1. insulation rope test-bed, it is characterized in that: stand can be designed to random length, and it comprises the stand base, goes up lower conductor, insulation strut, the stand base is made with metal, lower conductor is welded on the stand base, and designs an earth point, is used for linking to each other with grounding body; Upper conductor is located at the lower conductor top, is connected by insulation strut between the two, and designs a wiring handle, and in order to connect test lead, last lower conductor is parallel to each other; Be provided with mobilizable arc ply-yarn drill on last lower conductor, the arc ply-yarn drill on the last lower conductor is crisscross arranged, and each curved line is fastened on the centre of corresponding top or following two arc ply-yarn drills, and the distance between the arc ply-yarn drill of per up and down two correspondences is 0.5m.
2. insulation rope test-bed according to claim 1 is characterized in that: going up lower conductor is that xsect is circular straight-bar or annulus or elliptical ring or polygon annular.
3. insulation rope test-bed according to claim 1 and 2 is characterized in that: arc ply-yarn drill next door all has aperture on electric conductor up and down, and arc ply-yarn drill end can be inserted in the aperture.
CN2010206484570U 2010-12-02 2010-12-02 Insulating rope test bench Expired - Fee Related CN201909827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206484570U CN201909827U (en) 2010-12-02 2010-12-02 Insulating rope test bench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206484570U CN201909827U (en) 2010-12-02 2010-12-02 Insulating rope test bench

Publications (1)

Publication Number Publication Date
CN201909827U true CN201909827U (en) 2011-07-27

Family

ID=44302028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206484570U Expired - Fee Related CN201909827U (en) 2010-12-02 2010-12-02 Insulating rope test bench

Country Status (1)

Country Link
CN (1) CN201909827U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103163437A (en) * 2013-03-17 2013-06-19 安徽省电力公司蚌埠供电公司 Winding device for voltage withstand test of insulating rope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103163437A (en) * 2013-03-17 2013-06-19 安徽省电力公司蚌埠供电公司 Winding device for voltage withstand test of insulating rope

Similar Documents

Publication Publication Date Title
CN203398355U (en) Portable puncture-type short circuit grounding wire
CN102004214A (en) Test method of insulating cord
CN105259430A (en) Medium space charge measurement electrode at AC superposition DC voltage based on PEA method
CN208270622U (en) A kind of power distribution network arrester, isolator detecting bracket
CN105116197A (en) A fast wiring device for 750kV lightning arrester resistive current tests
CN202523948U (en) Movable grounding protection device for electric welding equipment
CN201909827U (en) Insulating rope test bench
CN106771386A (en) A kind of electrical test thread guide devices for making somebody a mere figurehead electrical equipment
CN105277838A (en) Device for checking high-voltage electric energy metering device wiring
CN205210239U (en) Testing arrangement around super conductor insulation performance of package and experimental apparatus thereof
CN205038258U (en) 750kV arrester resistive current tests quick termination
CN203759056U (en) AC voltage-resistant support of insulating rod
CN104316736B (en) Combined insulated lead for switch cabinet power-frequency and alternating-current withstand voltage test
CN202720248U (en) Insulating bracket for high voltage test
CN203149075U (en) Insulating tool test device for live-line operation on 10kV distribution network
CN202583299U (en) Special junction pole for testing capacitive current of neutral point ungrounded system
CN104330594A (en) Partial discharge test shielding cover for large transformer
CN205070328U (en) Bundling wire fixing clamping seat
CN206470292U (en) A kind of electrical test thread guide devices for being used to make somebody a mere figurehead electrical equipment
CN208547655U (en) Electric wire wire clamp
CN205749585U (en) Portable high-pressure bus ac voltage withstanding lead-in wire rapid card connection device
CN203224526U (en) A high-voltage wire connector used for AC withstanding voltage
CN107086439B (en) Special hardware structure for network side inlet of converter transformer
CN206804802U (en) A kind of experimental rig of power distribution network wire mask
CN110895323A (en) Portable mutual inductor test rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110727

Termination date: 20111202