CN201908258U - 桥梁主梁-双翼工字钢 - Google Patents
桥梁主梁-双翼工字钢 Download PDFInfo
- Publication number
- CN201908258U CN201908258U CN2011200051838U CN201120005183U CN201908258U CN 201908258 U CN201908258 U CN 201908258U CN 2011200051838 U CN2011200051838 U CN 2011200051838U CN 201120005183 U CN201120005183 U CN 201120005183U CN 201908258 U CN201908258 U CN 201908258U
- Authority
- CN
- China
- Prior art keywords
- double
- cross bar
- wing
- joist steel
- iron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本实用新型涉及一种桥梁主梁-双翼工字钢,包括第一横杆,所述第一横杆连接有两根竖向并排放置的竖杆,每根所述竖杆之间连接有两根横向并排横向放置的第二横杆,每根所述竖杆另一端连接有同一根第三横杆。本实用新型比起一般的工字钢,双翼工字钢承受的力量更强,结构很简单,成本也很低等优点。
Description
技术领域
本实用新型涉及一种工字钢,特别指一种双翼工字钢,用于桥梁主梁上。
背景技术
桥梁作为公路工程的重要组成部分,其结构个构造的完整性将直接影响到公路交通运输的安全性和舒适性,而工字钢作在桥梁主梁结构中起着重要的作用,一般的工字钢没有双翼型的工字钢承受的力量强。
发明内容
本实用新型的目的是为了克服以上的不足,提供一种结构简单、成本低的一种桥梁主梁-双翼工字钢。
本实用新型的目的通过以下技术方案来实现:一种桥梁主梁-双翼工字钢,包括第一横杆,所述第一横杆连接有两根竖向并排放置的竖杆,每根所述竖杆之间连接有两根横向并排横向放置的第二横杆,每根所述竖杆另一端连接有同一根第三横杆。
本实用新型具有以下优点:比起一般的工字钢,双翼工字钢承受的力量更强,结构很简单,成本也很低。
附图说明:
图1为本实用新型的结构示意图;
图中标号:1-第一横杆、2-竖杆、3-第二横杆、4-第三横杆。
具体实施方式:
为了加深对本实用新型的理解,下面将结合实施例和附图对本实用新型作进一步详述,该实施例仅用于解释本实用新型,并不构成对本实用新型保护范围的限定。
如图1示出了本实用新型一种桥梁主梁-双翼工字钢,包括第一横杆1,所述第一横杆1连接有两根竖向并排放置的竖杆2,每根所述竖杆2之间连接有两根横向并排横向放置的第二横杆3,每根所述竖杆2另一端连接有同一根第三横杆4。本实用新型比起一般的工字钢,双翼工字钢承受的力量更强,结构很简单,成本也很低等优点。
Claims (1)
1.一种桥梁主梁-双翼工字钢,包括第一横杆(1),其特征在于:所述第一横杆(1)连接有两根竖向并排放置的竖杆(2),每根所述竖杆(2)之间连接有两根横向并排横向放置的第二横杆(3),每根所述竖杆(2)另一端连接有同一根第三横杆(4)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200051838U CN201908258U (zh) | 2011-01-10 | 2011-01-10 | 桥梁主梁-双翼工字钢 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200051838U CN201908258U (zh) | 2011-01-10 | 2011-01-10 | 桥梁主梁-双翼工字钢 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201908258U true CN201908258U (zh) | 2011-07-27 |
Family
ID=44300462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200051838U Expired - Fee Related CN201908258U (zh) | 2011-01-10 | 2011-01-10 | 桥梁主梁-双翼工字钢 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201908258U (zh) |
-
2011
- 2011-01-10 CN CN2011200051838U patent/CN201908258U/zh not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203419349U (zh) | 脚墩具有可组装、拆卸的塑料托盘 | |
CN204491884U (zh) | 连梁耗能装置 | |
CN201908258U (zh) | 桥梁主梁-双翼工字钢 | |
CN104652644A (zh) | 连梁耗能装置 | |
CN102261036A (zh) | 桥梁主梁-双翼工字钢 | |
CN104019353B (zh) | 一种工业角铁 | |
CN205035904U (zh) | 一种新型的钢结构 | |
CN204326677U (zh) | 新型输电线路钢管杆 | |
CN204211397U (zh) | 组装式标准节 | |
CN104477502A (zh) | 一种钢卷托架 | |
CN202705903U (zh) | 直线段支架 | |
CN204342274U (zh) | 木材抓斗下承梁结构 | |
CN204826281U (zh) | 一种建筑防震系统 | |
CN204238120U (zh) | 波形钢腹板搭接双半圆加矩形螺栓孔结构 | |
CN203684058U (zh) | 新型一体式桥梁装置 | |
CN204728478U (zh) | 一种用于钢筋混凝土框架中的角钢锚件组合埋件 | |
CN203286181U (zh) | 管子连接件 | |
CN103741841B (zh) | 一种消能减震双钢板伸臂墙及实施方法 | |
CN204828430U (zh) | 一种汽车起重机中后桥板弹簧限位装置 | |
CN203049383U (zh) | 一种鼓包鱼尾板 | |
CN204199438U (zh) | 一种双边檩托 | |
CN202675323U (zh) | 锅炉烟道桁架节点装置 | |
CN204343455U (zh) | 一种新型插接钢结构件 | |
CN203240175U (zh) | 管道四通 | |
CN202850260U (zh) | 外包钢板剪力墙与混凝土墙的连接节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110727 Termination date: 20200110 |