CN201891079U - Rocket launching arrangement structure - Google Patents

Rocket launching arrangement structure Download PDF

Info

Publication number
CN201891079U
CN201891079U CN2010206036517U CN201020603651U CN201891079U CN 201891079 U CN201891079 U CN 201891079U CN 2010206036517 U CN2010206036517 U CN 2010206036517U CN 201020603651 U CN201020603651 U CN 201020603651U CN 201891079 U CN201891079 U CN 201891079U
Authority
CN
China
Prior art keywords
tower
wire rope
windlass
rocket launching
phi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206036517U
Other languages
Chinese (zh)
Inventor
李植淮
郭庆
孙立强
杨雪松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Road and Bridge Corp
Original Assignee
China Road and Bridge Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Road and Bridge Corp filed Critical China Road and Bridge Corp
Priority to CN2010206036517U priority Critical patent/CN201891079U/en
Application granted granted Critical
Publication of CN201891079U publication Critical patent/CN201891079U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ropes Or Cables (AREA)

Abstract

The utility model discloses a rocket launching arrangement structure. The rocket launching arrangement structure comprises a tunnel anchor, a main windlass, a No.1 tower, a Phi 16 steel wire rope, a Phi 14 soft rope, a rocket launching rack, a Phi 10 steel wire rope, a No.2 tower, an auxiliary windlass and a gravity anchor; the specification of the main windlass is 20 T, and the main windlass is placed beside the tunnel anchor; the No.1 tower is placed on one side of the main windlass and connected with the Phi 16 steel wire rope; the No.2 tower is placed on the opposite side of the No.1 tower and connected with the Phi 10 steel wire rope; the specification of the auxiliary windlass is 18 T, and the auxiliary windlass is placed on one side of the No.2 tower; the gravity anchor is arranged beside the auxiliary windlass; and the rocket launching rack is placed beside the No.2 tower and connected with the No.1 tower through the Phi 14 soft rope. The arrangement structure has the advantages as follows: the erection work of a suspension bridge leading rope is accelerated, is less subject to weather, terrain or ground feature, can avoid safety threat to working personnel or structures, and is less damaging to environment.

Description

A kind of rocket launching arrangement
Technical field
The utility model relates to an arrangement, particularly relates to a kind of rocket launching arrangement that large-span suspension bridge elder generation dragline sets up that is used for.
Background technology
The various main lines that are communicated with the mountain area need be crossed over valley, various gully, need build suspension bridge, and first dragline sets up the operation at first as the construction of suspension bridge superstructure, is the technical barrier that need break through.Generally, suspension bridge is built on the valley, gully, and the first dragline of little span mountain area suspension bridge generally is to adopt the mode that manually pulls to construct under the cooperation of hoist engine; Large-span suspension bridge is built usually on the waters of the dark wealthy complexity of mountain area river width of peak height paddy, and in this case, the erection method of first dragline comprises the method that manually pulls and helicopter traction method.
Wherein, the shortcoming that manually pulls method is:
1. construction risk is big, very easily causes security incident;
2. owing to the mountain area dense vegetation, the horizontal projection line usefulness after need setting up along first dragline in the steep hills paddy is manually cut out the passage of a wide 1.5m, and environmental destruction is very big;
3. be subjected to seasonal effect bigger, need avoid sleety weather and greasy weather;
4. construction period is longer, does not satisfy construction period.
The shortcoming of helicopter traction method is:
1. the turbulent property of mountain area bridge location is not only determined by the atmospheric boundary layer motion, and is subjected to the effect that the feature turbulent flow is streamed on the mountain peak, and is totally unfavorable to the flight safety influence;
2. the mountain area bridge location has certain influence to the visual field of flight;
3. the many weight in wet bases of mountain area bridge site zone mist have certain influence to the flight visual field;
4. two sides all will have one greater than 500m 2The place for helicopter landing, need build disposable lifting place, big to environmental disruption.
Therefore, need improve job practices.
The utility model content
The utility model aims to provide a kind of safe, economical, convenient, efficient, and the rocket launching arrangement that can use in large-span suspension bridge elder generation dragline sets up.
The technical scheme of a kind of rocket launching arrangement of the utility model is as follows:
A kind of rocket launching arrangement of the utility model comprises tunnel anchor, main winch, 1# tower, Φ 16 wire rope, Φ 14 soft ropes, rocket pod, Φ 10 wire rope, 2# tower, secondary hoist engine and gravity anchor; Described main winch specification is 20T, place anchor next door, tunnel, described 1# tower places a side of main winch, connects Φ 16 wire rope on the described 1# tower, and described 2# tower places the offside of 1# tower, connect Φ 10 wire rope on the described 2# tower, described secondary hoist engine specification is 18T, places a side of 2# tower, and described gravity anchor places secondary hoist engine next door, described rocket launching is placed on 2# tower next door, and described rocket pod is connected by Φ 14 soft ropes with the 1# tower.
The beneficial effect of a kind of rocket launching arrangement of the utility model is:
When a kind of rocket launching arrangement of the utility model is used for large-span suspension bridge elder generation dragline and sets up, can realize that rocket throws the rope technology, use this technology, the effect of acquisition comprises:
1. speed of application is fast;
2. be subjected to weather, the topography and geomorphology influence degree is little;
3. the operation person and works are not constituted security threat;
4. little to environmental disruption.
Description of drawings
Fig. 1 is the schematic diagram of a kind of rocket launching arrangement of the utility model;
Wherein, 1, the tunnel anchor, 2, main winch, 3, the 1# tower, 4, Φ 16 wire rope, 5, Φ 14 soft ropes, 6, rocket pod, 7, Φ 10 wire rope, 8, the 2# tower, 9, secondary hoist engine, 10, gravity anchor, 11, rocket launching track.
The specific embodiment
Referring to accompanying drawing 1, a kind of rocket launching arrangement of the utility model comprises tunnel anchor 1, main winch 2,1# tower 3, Φ 16 wire rope 4, Φ 14 soft ropes 5, rocket pod 6, Φ 10 wire rope 7,2# tower 8, secondary hoist engine 9 and gravity anchor 10; Described main winch 2 specifications are 20T, place tunnel anchor 1 next door, described 1# tower 3 places a side of main winch 2, connect Φ 16 wire rope 4 on the described 1# tower 3, described 2# tower 8 places the offside of 1# tower 3, connect Φ 10 wire rope 7 on the described 2# tower 8, described secondary hoist engine 9 specifications are 18T, place a side of 2# tower 8, described gravity anchor 10 places secondary hoist engine 9 next doors, described rocket pod 6 places 2# tower 8 next doors, and described rocket pod 6 is connected by Φ 14 soft ropes 5 with 1# tower 3.
When using a kind of rocket launching arrangement of the utility model, in the accompanying drawing shown in the numbering 11 is the rocket launching track.

Claims (1)

1. a rocket launching arrangement is characterized in that: comprise tunnel anchor, main winch, 1# tower, Φ 16 wire rope, Φ 14 soft ropes, rocket pod, Φ 10 wire rope, 2# tower, secondary hoist engine and gravity anchor; Described main winch specification is 20T, place anchor next door, tunnel, described 1# tower places a side of main winch, connects Φ 16 wire rope on the described 1# tower, and described 2# tower places the offside of 1# tower, connect Φ 10 wire rope on the described 2# tower, described secondary hoist engine specification is 18T, places a side of 2# tower, and described gravity anchor places secondary hoist engine next door, described rocket launching is placed on 2# tower next door, and described rocket pod is connected by Φ 14 soft ropes with the 1# tower.
CN2010206036517U 2010-11-12 2010-11-12 Rocket launching arrangement structure Expired - Fee Related CN201891079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206036517U CN201891079U (en) 2010-11-12 2010-11-12 Rocket launching arrangement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206036517U CN201891079U (en) 2010-11-12 2010-11-12 Rocket launching arrangement structure

Publications (1)

Publication Number Publication Date
CN201891079U true CN201891079U (en) 2011-07-06

Family

ID=44220556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206036517U Expired - Fee Related CN201891079U (en) 2010-11-12 2010-11-12 Rocket launching arrangement structure

Country Status (1)

Country Link
CN (1) CN201891079U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898427A (en) * 2019-04-02 2019-06-18 王振川 A kind of military bridging engineering truck
CN111622111A (en) * 2020-05-04 2020-09-04 中交第四公路工程局有限公司 Pilot cable construction method for erecting main cable of cable crane in ultra-deep valley

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898427A (en) * 2019-04-02 2019-06-18 王振川 A kind of military bridging engineering truck
CN111622111A (en) * 2020-05-04 2020-09-04 中交第四公路工程局有限公司 Pilot cable construction method for erecting main cable of cable crane in ultra-deep valley

Similar Documents

Publication Publication Date Title
CN201891079U (en) Rocket launching arrangement structure
CN201903289U (en) Rocket launcher
CN205474862U (en) Wet seam template operation platform of portable case roof beam
CN202416171U (en) Stay cable single cable suspension platform
CN204608602U (en) Novel bridge maintenance protection installation work car
CN201852528U (en) Rocket system for throwing pilot cable
CN202625763U (en) Self-propelled automatic lifting high-altitude working machine
CN201851228U (en) Engine of rocket
CN202078660U (en) High-rise rescue device
CN205421163U (en) Water conservancy construction slope protection structure
CN203486809U (en) Falling protector of tower crane vertical ladder
CN203996791U (en) The self-service ferry-boat of a kind of wire rope traction
CN203174605U (en) Gravity type anchor body applied in special geology
CN205591962U (en) A safety compartment that is used for manual work to dig hole operation
CN206826874U (en) A kind of artificial anchor
CN202402221U (en) Tower frame with climbing device
CN102296610B (en) Device for removing square pile and construction method thereof
CN203603065U (en) Installation equipment for bridge anti-collision guardrail steel template
CN201559655U (en) Pedestrian climbing power assisting device
CN201362341Y (en) Twin-hull pontoon for treating soft ground
CN207347970U (en) A kind of earth anchor array anchoring device
CN214456407U (en) Overhead material conveying device
CN206202477U (en) A kind of crawler type sprays anchor operation mobile platform
CN204715216U (en) A kind of Arch Bridge Construction platform structure
CN204919300U (en) Public road bridge of view

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110706

Termination date: 20191112