CN201886882U - Outlet structure of SF6 insulation test transformer - Google Patents

Outlet structure of SF6 insulation test transformer Download PDF

Info

Publication number
CN201886882U
CN201886882U CN2010206255088U CN201020625508U CN201886882U CN 201886882 U CN201886882 U CN 201886882U CN 2010206255088 U CN2010206255088 U CN 2010206255088U CN 201020625508 U CN201020625508 U CN 201020625508U CN 201886882 U CN201886882 U CN 201886882U
Authority
CN
China
Prior art keywords
switch
isolating switch
isolating
earthed
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206255088U
Other languages
Chinese (zh)
Inventor
殷晶辉
姜兴全
魏宏程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China XD Electric Co Ltd
Original Assignee
China XD Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China XD Electric Co Ltd filed Critical China XD Electric Co Ltd
Priority to CN2010206255088U priority Critical patent/CN201886882U/en
Application granted granted Critical
Publication of CN201886882U publication Critical patent/CN201886882U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model discloses the outlet structure of an SF6 insulation test transformer, comprising a first isolating switch, a second isolating switch, a first earthing switch and a second earthing switch which are fixedly installed on the insulation test transformer, wherein the first isolating switch and the first earthing switch are installed at one side of a high-voltage outlet sleeve, and the second isolating switch and the second earthing switch are installed at one side of a butted test port. In the utility model, shells for the earthing switches and that for the isolating switches are isolated from each other through insulating boards and are connected through conducting wires. When partial discharge is carried out, the conducting wires connecting the shells for the earthing switches and that for the isolating switches can be separated, and standard quantity injection can be realized directly through the earthing switches, thereby achieving convenient and fast operation.

Description

A kind of SF<sub〉6</sub〉gas-insulated testing transformer outlet structure
Technical field:
The utility model belongs to the high-voltage switch gear field, relates to a kind of SF 6Gas-insulated testing transformer outlet structure, especially a kind of SF 6The gas-insulated testing transformer outlet structure of isolating switch and earthed switch.
Background technology:
The GIS product export need carry out industrial frequency withstand voltage and partial discharge test, and GIS product export test method adopted and passes through SF in the past 6Gas-insulated testing transformer high-voltage terminal sleeve pipe is guided to the GIS product with high-voltage connection, and there are two problems in this test method:
The high-voltage terminal sleeve pipe can receive outer signals and disturb, make local discharge test be subjected to the influence of external interference signal: testing transformer high-voltage terminal sleeve pipe be connected GIS product high-voltage connection the effect of reception antenna arranged, and the long more received signal ability of high-voltage connection is strong more, often occurring the external interference signal value when GIS product export local discharge test is higher than GIS product local discharge test required value (general GIS product export test requirements document value is 5pC, part is 3pC), and the external interference signal is often tested the requirement of 5pC considerably beyond the GIS product export, must wait until when the external interference signal is lower than 5pC and can carry out GIS product partial discharge test, influence the GIS of company production progress.
The restriction of pilot region: when the GIS product carries out local discharge test, need to be connected between testing transformer high-voltage terminal sleeve pipe and product sleeve pipe with thick conductor, conductor short receptor external interference signal capabilities more is weak more, GIS product local discharge test is easy more to be passed through, thereby the GIS product generally is installed near the testing transformer high-voltage terminal sleeve pipe, and limited place has been limited the GIS product quantity is installed near the high-voltage terminal sleeve pipe.
Solve the problem that exists in the GIS product testing local discharge test, can be by the external interference signal-shield ground be solved, adopt GIS product and testing transformer docking mode to test for this reason, and can reach the purpose of dealing with problems with 1000kV isolating switch and earthed switch.
The utility model is newly-increased part on former testing transformer basis, and newly-increased part be to exit (isolating switch 2 and earthed switch 2) near near high-voltage terminal sleeve pipe (isolating switch 1 and earthed switch 1) and product.By new version, can reach following effect:
For not carrying out local discharge test or relatively being easy to carry out the product of local discharge test, can stretch out lead-in wire by the high voltage test sleeve pipe and test, concrete operations are that isolating switch 1 closes, isolating switch 2 minutes, earthed switch 1 minute, earthed switch 2 close and reach test objective.
For the demanding product of local discharge test, by export 1 and outlet 2 butt joints test, make outer signals by equipment and product casing ground connection, reach the purpose of shielding external interference signal.Concrete operations are that isolating switch 2 closes, isolating switch 1 minute, earthed switch 2 minutes, earthed switch 1 close.
The utility model content:
The novel purpose of the present invention provides a kind of SF 6Gas-insulated testing transformer outlet structure, by isolation, ground connection to 1000kV testing transformer high-voltage terminal sleeve pipe or butt joint test port, reach by high-voltage connection or by the butt joint test port GIS product is carried out withstand voltage and local discharge test, increase work efficiency.
The purpose of this utility model is to overcome the shortcoming of above-mentioned prior art, and a kind of SF is provided 6Gas-insulated testing transformer outlet structure comprises first isolating switch, second isolating switch, first earthed switch and second earthed switch that are fixedly mounted on the Insulation Test transformer; Described first isolating switch and first earthed switch are installed in high-voltage terminal sleeve pipe one side, and described second isolating switch and second earthed switch are installed in butt joint test port one side.
Described first isolating switch and second isolating switch adopt SF 6Gas isolated metal shell enclosed switch.
Described first isolating switch is identical with the second isolating switch structure, all comprises moving contact and fixed contact, the inner scroll bar drive mechanism that adopts of moving contact, and gear parts links to each other with the isolating switch rotating part by insulated tension pole.
Described first earthed switch is identical with the second earthed switch structure, is manual manipulation mode all, reaches earth brace by the manual compression spring and partly contacts with the isolating switch moving contact and separate; The earth brace termination is a ball-type, and end portion is connected with earth brace with spring, and end portion can be stretched within the specific limits, guarantees reliably to contact with the isolating switch moving contact.
Described first earthed switch and the first isolating switch shell are isolated with insulation board, by lead first earthed switch are connected with the first isolating switch shell.
Described second earthed switch and the second isolating switch shell are isolated with insulation board, by lead second earthed switch are connected with the second isolating switch shell.
The utility model by single bushing outlet method, is changed into the 1000kV testing transformer bushing outlet and two kinds of forms of butt joint test port, and is realized that the key of this conversion is design and installation 1000kV isolating switch and earthed switch.This isolating switch is SF 6Gas-insulated, employing metal shell enclosed switch, critical piece comprises moving rotating part, contact part, fixed contact part.
The specification requirement of 1000kV voltage is born in switch fracture and insulation against ground, high-volume reach under 740kV with the current political situation to be lower than 2pC, applicable to 1000kV electric pressure and following SF 6The gas-insulated testing transformer uses.
The main part of this isolating switch comprises moving contact and fixed contact part, the inner scroll bar drive mechanism (being that leading screw cooperates transmission with gear) that adopts of moving contact, gear parts links to each other with the isolating switch rotating part by insulated tension pole, when the isolating switch rotating part rotates, the drive high-voltage contact is flexible, thereby realizes isolating switch branch, the purpose of closing.This isolating switch had both adopted manual manipulation mode, also can adopt electric operating mode, convenient and reliable operation.
Earthed switch is a manual manipulation mode, reaches earth brace by the manual compression spring and partly contacts with the isolating switch moving contact and separate.The earth brace termination is a ball-type, and end portion is connected with earth brace with spring, and end portion can be stretched within the specific limits, guarantees reliably to contact with the isolating switch moving contact.
When product carries out local discharge test, need to inject standard volume by the pulse checksum generator at the high pressure outgoing position, generally go up crane and inject realization at product insulator place by personnel.This design earthed switch and isolating switch shell are isolated with insulation board, by lead earthed switch are connected with the isolating switch shell.When carrying out local discharge test, earthed switch can be connected lead with the isolating switch shell and separate, directly realize the standard volume injection by earthed switch, convenient to operation.
Description of drawings:
Fig. 1 is SF of the present utility model 6Gas-insulated testing transformer outlet structure schematic diagram;
Wherein: 1 is first isolating switch; 2 is first earthed switch; 3 is second isolating switch; 4 is second earthed switch; 5 is the high-voltage terminal sleeve pipe; 6 is first outlet; 7 is second outlet.
Embodiment:
Below in conjunction with accompanying drawing the utility model is done and to be described in further detail:
Referring to Fig. 1, a kind of SF 6Gas-insulated testing transformer outlet structure comprises first isolating switch, second isolating switch, first earthed switch and second earthed switch that are fixedly mounted on the Insulation Test transformer; Described first isolating switch and first earthed switch are installed in high-voltage terminal sleeve pipe one side, and described second isolating switch and second earthed switch are installed in butt joint test port one side.
Described first isolating switch and second isolating switch adopt SF 6Gas isolated metal shell enclosed switch.
Described first isolating switch is identical with the second isolating switch structure, all comprises moving contact and fixed contact, the inner scroll bar drive mechanism that adopts of moving contact, and gear parts links to each other with the isolating switch rotating part by insulated tension pole.
Described first earthed switch is identical with the second earthed switch structure, is manual manipulation mode all, reaches earth brace by the manual compression spring and partly contacts with the isolating switch moving contact and separate; The earth brace termination is a ball-type, and end portion is connected with earth brace with spring, and end portion can be stretched within the specific limits, guarantees reliably to contact with the isolating switch moving contact.
Described first earthed switch and the first isolating switch shell are isolated with insulation board, by lead first earthed switch are connected with the first isolating switch shell.
Described second earthed switch and the second isolating switch shell are isolated with insulation board, by lead second earthed switch are connected with the second isolating switch shell.
The utility model by single bushing outlet method, is changed into the 1000kV testing transformer bushing outlet and two kinds of forms of butt joint test port, and is realized that the key of this conversion is design and installation 1000kV isolating switch and earthed switch.This isolating switch is SF 6Gas-insulated, employing metal shell enclosed switch, critical piece comprises moving rotating part, contact part, fixed contact part.
It is characterized in that switch fracture and insulation against ground bear the specification requirement of 1000kV voltage, high-volume reach under 740kV with the current political situation and be lower than 2pC, applicable to 1000kV electric pressure and following SF 6The gas-insulated testing transformer uses.
The main part of this isolating switch comprises moving contact and fixed contact part, the inner scroll bar drive mechanism (being that leading screw cooperates transmission with gear) that adopts of moving contact, gear parts links to each other with the isolating switch rotating part by insulated tension pole, when the isolating switch rotating part rotates, the drive high-voltage contact is flexible, thereby realizes isolating switch branch, the purpose of closing.This isolating switch had both adopted manual manipulation mode, also can adopt electric operating mode, convenient and reliable operation.
Earthed switch is a manual manipulation mode, reaches earth brace by the manual compression spring and partly contacts with the isolating switch moving contact and separate.The earth brace termination is a ball-type, and end portion is connected with earth brace with spring, and end portion can be stretched within the specific limits, guarantees reliably to contact with the isolating switch moving contact.
Above content is to further describing that the present invention did in conjunction with concrete preferred implementation; can not assert that the specific embodiment of the present invention only limits to this; for the general technical staff of the technical field of the invention; without departing from the inventive concept of the premise; can also make some simple deduction or replace, all should be considered as belonging to the present invention and determine scope of patent protection by claims of being submitted to.

Claims (6)

1. SF 6Gas-insulated testing transformer outlet structure is characterized in that: comprise first isolating switch, second isolating switch, first earthed switch and second earthed switch that are fixedly mounted on the Insulation Test transformer; Described first isolating switch and first earthed switch are installed in high-voltage terminal sleeve pipe one side, and described second isolating switch and second earthed switch are installed in butt joint test port one side.
2. a kind of according to claim 1 SF 6Gas-insulated testing transformer outlet structure is characterized in that: described first isolating switch and second isolating switch adopt SF 6Gas isolated metal shell enclosed switch.
3. a kind of according to claim 1 SF 6Gas-insulated testing transformer outlet structure, it is characterized in that: described first isolating switch is identical with the second isolating switch structure, all comprise moving contact and fixed contact, the inner scroll bar drive mechanism that adopts of moving contact, gear parts links to each other with the isolating switch rotating part by insulated tension pole.
4. a kind of according to claim 1 SF 6Gas-insulated testing transformer outlet structure is characterized in that: described first earthed switch is identical with the second earthed switch structure, is manual manipulation mode all, reaches earth brace by the manual compression spring and partly contacts with the isolating switch moving contact and separate; The earth brace termination is a ball-type, and end portion is connected with earth brace with spring, and end portion can be stretched within the specific limits, guarantees reliably to contact with the isolating switch moving contact.
5. a kind of according to claim 1 SF 6Gas-insulated testing transformer outlet structure is characterized in that: described first earthed switch and the first isolating switch shell are isolated with insulation board, by lead first earthed switch are connected with the first isolating switch shell.
6. a kind of according to claim 1 SF 6Gas-insulated testing transformer outlet structure is characterized in that: described second earthed switch and the second isolating switch shell are isolated with insulation board, by lead second earthed switch are connected with the second isolating switch shell.
CN2010206255088U 2010-11-25 2010-11-25 Outlet structure of SF6 insulation test transformer Expired - Lifetime CN201886882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206255088U CN201886882U (en) 2010-11-25 2010-11-25 Outlet structure of SF6 insulation test transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206255088U CN201886882U (en) 2010-11-25 2010-11-25 Outlet structure of SF6 insulation test transformer

Publications (1)

Publication Number Publication Date
CN201886882U true CN201886882U (en) 2011-06-29

Family

ID=44184430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206255088U Expired - Lifetime CN201886882U (en) 2010-11-25 2010-11-25 Outlet structure of SF6 insulation test transformer

Country Status (1)

Country Link
CN (1) CN201886882U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102830332A (en) * 2012-09-04 2012-12-19 安徽省电力科学研究院 Modularized defect simulator for local discharge detection of gas insulated switchgear
CN109116220A (en) * 2017-06-22 2019-01-01 河南平芝高压开关有限公司 Withstand test device used for high-voltage switch
CN112269109A (en) * 2020-10-16 2021-01-26 江苏恒高电气制造有限公司 Gas insulated transmission line test device and test method
CN113777456A (en) * 2021-10-08 2021-12-10 江苏安靠智能输电工程科技股份有限公司 On-spot insulation test device of totally enclosed gas insulation high voltage switch
CN113899996A (en) * 2021-10-08 2022-01-07 江苏安靠智能输电工程科技股份有限公司 On-spot high-voltage insulation test device
CN113917300A (en) * 2021-10-08 2022-01-11 江苏安靠智能输电工程科技股份有限公司 Direct connection device of gas-insulated high-voltage switch and power transformer

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102830332A (en) * 2012-09-04 2012-12-19 安徽省电力科学研究院 Modularized defect simulator for local discharge detection of gas insulated switchgear
CN109116220A (en) * 2017-06-22 2019-01-01 河南平芝高压开关有限公司 Withstand test device used for high-voltage switch
CN109116220B (en) * 2017-06-22 2021-07-13 河南平芝高压开关有限公司 Withstand voltage test device for high-voltage switch
CN112269109A (en) * 2020-10-16 2021-01-26 江苏恒高电气制造有限公司 Gas insulated transmission line test device and test method
CN113777456A (en) * 2021-10-08 2021-12-10 江苏安靠智能输电工程科技股份有限公司 On-spot insulation test device of totally enclosed gas insulation high voltage switch
CN113899996A (en) * 2021-10-08 2022-01-07 江苏安靠智能输电工程科技股份有限公司 On-spot high-voltage insulation test device
CN113917300A (en) * 2021-10-08 2022-01-11 江苏安靠智能输电工程科技股份有限公司 Direct connection device of gas-insulated high-voltage switch and power transformer
CN113899996B (en) * 2021-10-08 2023-11-14 江苏安靠智能输电工程科技股份有限公司 On-spot high voltage insulation test device

Similar Documents

Publication Publication Date Title
CN201886882U (en) Outlet structure of SF6 insulation test transformer
CN103353574B (en) A kind of insulation test device of GIS insulated tension pole
CN102420071A (en) Totally-enclosed solid-sealed polar pole
CN201774204U (en) Wall feed-through sleeve of soft supporting bus for high voltage switching equipment
CN203659733U (en) Outdoor high-voltage demarcation vacuum circuit breaker
CN201498869U (en) Vacuum ring main unit
CN102280833B (en) 40.5 KV outdoor Gas Insulated Switchgear (GIS)
CN103117189B (en) A kind of pole and solid insulation ring main unit
CN209072090U (en) A kind of self-energizing Intelligent fault isolating device
CN203616435U (en) On-site 220V SF6 gas test device
CN202678086U (en) High-voltage sulfur hexafluoride (SF6) gas-insulation current transformer having function of monitoring superhigh-frequency partial discharge
CN202749310U (en) Replaceable built-in voltage transformer high voltage alternating current dividing circuit breaker
CN215343664U (en) Special earthing device of high tension switchgear GIS combined electrical equipment
CN102709043B (en) A kind of high pressure sulfur hexafluoride gas insulated high voltage current transformer
CN201348901Y (en) Insulating bushing of high-voltage power equipment
CN202205648U (en) Totally-closed solid-sealed polar pole
CN204179559U (en) A kind of GIS Direct Action Type manual operation isolation fracture
CN104143464A (en) Earthing switch assembling unit and high-speed earthing switch
CN202120805U (en) Cubicle gas insulated switchgear
CN203224529U (en) Insulating pedestal used for electrical test
CN201576601U (en) Single-fracture high-voltage isolating switch
CN105552770A (en) Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device
CN202601500U (en) Insulation barrel and main loop structure adopting same
CN203632070U (en) An oil and gas bushing structure for a non-segregated type GIS
CN111508762A (en) Novel withstand voltage device of case GIS cable interval altogether

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110629