CN201873731U - Novel actuating mechanism of hot aluminum slag press - Google Patents
Novel actuating mechanism of hot aluminum slag press Download PDFInfo
- Publication number
- CN201873731U CN201873731U CN2010205932048U CN201020593204U CN201873731U CN 201873731 U CN201873731 U CN 201873731U CN 2010205932048 U CN2010205932048 U CN 2010205932048U CN 201020593204 U CN201020593204 U CN 201020593204U CN 201873731 U CN201873731 U CN 201873731U
- Authority
- CN
- China
- Prior art keywords
- slag
- hydro
- actuating mechanism
- head
- hinged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002893 slag Substances 0.000 title claims abstract description 61
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 title claims abstract description 24
- 229910052782 aluminium Inorganic materials 0.000 title claims abstract description 23
- 230000007246 mechanism Effects 0.000 title claims abstract description 16
- 239000004411 aluminium Substances 0.000 claims description 19
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000003825 pressing Methods 0.000 abstract description 11
- 230000000694 effects Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 4
- 230000001360 synchronised effect Effects 0.000 description 4
- 229910000838 Al alloy Inorganic materials 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 3
- 238000011084 recovery Methods 0.000 description 3
- 238000002844 melting Methods 0.000 description 2
- 230000008018 melting Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 150000004767 nitrides Chemical class 0.000 description 1
- 230000008929 regeneration Effects 0.000 description 1
- 238000011069 regeneration method Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Abstract
The utility model relates to a novel actuating mechanism of a hot aluminum slag press, which is fine in slag pressing effect, simple in structure, convenient in operation, stable and reliable in performance and fine in applicability. According to the technical scheme, the novel actuating mechanism comprises a frame, two hydraulic cylinders and a slag pressing head, wherein the two hydraulic cylinders parallel to each other are vertically mounted at the bottom end of the frame, the slag pressing head is hinged to the top ends of push rods of the two hydraulic cylinders, and the hydraulic cylinders are further communicated with an external oil pump through hydraulic pipelines. The novel actuating mechanism is characterized in that a horizontal member is further fixed to the top end of each push rod, and the left side and the right side of each horizontal member are respectively hinged with the slag pressing head through two connecting members equal in length. Since the slag pressing head is respectively connected with the horizontal members at the top ends of the two push rods through the two connecting members equal in length, two mutually parallel and symmetrical four-bar mechanisms are formed.
Description
Technical field
The utility model relates to the topworks that a kind of hot aluminium slag is pressed the slag machine, the recovery of the slag that produces when being specially adapted to the melting of industrial aluminum and aluminium alloy.
Background technology
In the regeneration process of melting, the remelting of aluminium and aluminium alloy and the assorted aluminium that gives up, the generation of slag is inevitably, and along with the day by day increase of the increasing of primary aluminum consumption with secondary aluminum output, slag amount is also correspondingly many year by year.Aluminium content average out to about 45% in the aluminium slag, remaining is oxide compound, nitride, muriate etc.China still is in the state that comparatively falls behind in the aluminium slag treatment and aspect utilizing, general treatment process is: after skimming, hot aluminium slag is poured on the ground the cooling of giving free rein to, this certainly will cause the aluminium in the slag to burn away in air, and surrounding environment is very abominable; Residual ash almost is not used.Therefore. the residual ash after how as often as possible reclaiming aluminium wherein and making full use of recovery. this is not only a resource problem; it also is an environmental protection problem; the today that particularly improve day by day at environmental protection consciousness, environmental protection problem more and more seems important, addressing this problem particularly needs.
Traditional hot aluminium is pressed in the topworks of slag machine, and the push rod of two hydro-cylinders that are arranged in parallel directly links to each other with pressing the slag head by hinge respectively; But because the certain error of synchronous existence of two hydro-cylinders, in fact the stroke of two hydro-cylinders can not guarantee in full accord, and two hinge interchain gap differences, in pressing the slag process, often cause and press the slag head can not keep horizontality, but two is at a slight tilt, and makes to press the slag effect to be affected.
The utility model content
The purpose of this utility model provides the improvement that a kind of hot aluminium slag is pressed slag machine topworks, and this mechanism should have the characteristics that slag is effective, simple in structure, easy to operate, stable and reliable for performance and adaptability is good of pressing.
For achieving the above object, the technical solution adopted in the utility model is:
A kind of novel hot aluminium slag is pressed slag machine topworks, comprises frame, the vertical pressure slag of the push rod head that vertically is installed in frame bottom and two hydro-cylinders that are parallel to each other and is hinged on two hydro-cylinders, and hydro-cylinder also is communicated with by the oil pump of hydraulicefficiency pipeline with the outside; It is characterized in that each push rod top also fixes a horizontal bars, the left and right sides of horizontal bars is hinged by an isometric connection rod member and a described pressure slag head respectively.
Described pressure slag head forms two by two pairs of isometric connection rod members and the vertical horizontal bars of two push rods respectively and is parallel to each other and the four-bar mechanism of symmetric arrangement.
Principle of work of the present utility model is: the vertical horizontal bars of the push rod of each hydro-cylinder is connected rod member with two hinged with a horizontally disposed pressure slag head again after hinged, forms a four-bar mechanism; Like this, be provided with the four-bar mechanism of two symmetrical distributions between the vertical horizontal bars of push rod of pressure slag head and two hydro-cylinders.According to the characteristic of four-bar mechanism, press the slag head in the course of the work can be all the time and the horizontal bars keeping parallelism, also just guaranteed pressure slag work quality.
The beneficial effects of the utility model are: because two hydro-cylinders in the topworks are connected on the same pressure slag head by a four-bar mechanism respectively again, guaranteed that pressure slag head is in parastate all the time, guarantee pressure slag work quality, improved the rate of recovery of hot aluminium slag; Simultaneously, also reduced the design requirements to synchronous hydraulic cylinder, the movement travel of guaranteeing two hydro-cylinders also can be kept the horizontal attitude of pressing the slag head when deviation is arranged, and is stable and reliable for performance and adaptability good; In addition, also has simple in structure, convenience operation.
Description of drawings
Fig. 1 is a main TV structure synoptic diagram of the present utility model.
Embodiment
Hot aluminium slag is pressed the pressure slag head in the slag machine topworks, drives when being moved up and down by two hydraulic cylinder synchronous to press the slag head to move up and down, and realizes the pressure slag process to hot aluminium slag.Because the certain error (in fact the stroke of two hydro-cylinders can not guarantee in full accord) of synchronous existence of two hydro-cylinders.For this reason, the utility model utilizes parallelogram lindage to eliminate the influence that this problem is brought, and also can keep the horizontal attitude of pressing the slag head when there is deviation in the moving stroke of guaranteeing two hydro-cylinders.
Concrete structure as shown in Figure 1; This hot aluminium slag is pressed slag machine topworks, comprise that frame 1, vertical of the push rod 2-1 that vertically is installed in frame bottom and two hydro-cylinders 2 that are parallel to each other and is hinged on two hydro-cylinders press slag head 5, hydro-cylinder also is communicated with (hydraulicefficiency pipeline and oil pump all give omission among the figure) by hydraulicefficiency pipeline with the oil pump of outside; These structures all with existing mechanism roughly the same.
The utility model is also fixed a horizontal bars 3 on each push rod top, and the left and right sides of horizontal bars is hinged with described pressure slag head 5 by an isometric connection rod member 4 respectively, constitutes a four-bar mechanism thus.Wherein, hydro-cylinder 2 vertically is fixed on the frame 1 down, and the push rod on the hydro-cylinder is down done the work campaign; A horizontal bars 3 is fixed on the top of each push rod, and the other end of 4, two connections of hinged two the isometric connection rod members of left and right sides difference rod member 4 of horizontal bars is hinged with pressure slag head 5 again, constitutes four-bar mechanism thus.Described pressure slag head forms two by two pairs of isometric connection rod members (every pair has two to connect rod members, four connect the rod member length identical) and two vertical horizontal bars of push rod respectively and is parallel to each other and the four-bar mechanism of symmetric arrangement.
In addition, horizontal bars 3 be connected rod member 4 and form an interior angle a; The big I of a is according to pressing slag to require to determine.
Claims (2)
1. a novel hot aluminium slag is pressed slag machine topworks, comprise frame (1), push rod (2-1) the vertical pressure slag head (5) that vertically is installed in frame bottom and two hydro-cylinders (2) that are parallel to each other and is hinged on two hydro-cylinders, hydro-cylinder also is communicated with by the oil pump of hydraulicefficiency pipeline with the outside; It is characterized in that each push rod top also fixes a horizontal bars (3), the left and right sides of horizontal bars is hinged with described pressure slag head by an isometric connection rod member (4) respectively.
2. a kind of novel hot aluminium slag according to claim 1 is pressed slag machine topworks, it is characterized in that described pressure slag head (5) is parallel to each other by two pairs of isometric connection rod members and two two of vertical horizontal bars formation of push rod respectively and the four-bar mechanism of symmetric arrangement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205932048U CN201873731U (en) | 2010-10-30 | 2010-10-30 | Novel actuating mechanism of hot aluminum slag press |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205932048U CN201873731U (en) | 2010-10-30 | 2010-10-30 | Novel actuating mechanism of hot aluminum slag press |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201873731U true CN201873731U (en) | 2011-06-22 |
Family
ID=44161657
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205932048U Expired - Fee Related CN201873731U (en) | 2010-10-30 | 2010-10-30 | Novel actuating mechanism of hot aluminum slag press |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201873731U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104911368A (en) * | 2015-06-11 | 2015-09-16 | 深圳市阿尔泰克铝业设备制造有限公司 | Hot aluminum slag treatment equipment |
CN104988324A (en) * | 2015-06-11 | 2015-10-21 | 深圳市阿尔泰克铝业设备制造有限公司 | Heat dissipating and cooling method for slag pressing head |
-
2010
- 2010-10-30 CN CN2010205932048U patent/CN201873731U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104911368A (en) * | 2015-06-11 | 2015-09-16 | 深圳市阿尔泰克铝业设备制造有限公司 | Hot aluminum slag treatment equipment |
CN104988324A (en) * | 2015-06-11 | 2015-10-21 | 深圳市阿尔泰克铝业设备制造有限公司 | Heat dissipating and cooling method for slag pressing head |
CN104988324B (en) * | 2015-06-11 | 2017-10-03 | 深圳阿尔泰克轻合金技术有限公司 | One kind pressure slag head radiating and cooling means |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201873731U (en) | Novel actuating mechanism of hot aluminum slag press | |
CN102179719B (en) | Compensation mechanism for stress deformation of spindle box of machine tool | |
CN203495092U (en) | Unloading mechanism for spring cutter | |
CN212959069U (en) | Water pump that job stabilization nature is high | |
CN203863113U (en) | Cut-off machine | |
CN203237992U (en) | Synchronous lifting device | |
CN201400719Y (en) | Connecting rod-type crust breaking device | |
CN206247938U (en) | A kind of slot clamping type cooling tower packing bracket | |
CN205817219U (en) | Photovoltaic module framing machine | |
CN104457255B (en) | Sintering ignition furnace and method of adjustment thereof | |
CN203696087U (en) | Blade drive and gap regulating system of hydraulic brake type plate shearing machine | |
CN207184382U (en) | A kind of fixed type photovoltaic support of high stable | |
CN203077644U (en) | Pressure head synchronizing device of heavy metal hydraulic briquetting machine | |
CN202717505U (en) | Synchronizing mechanism for heavy-duty manipulator | |
CN207077855U (en) | A kind of coating machine press-roller device | |
CN202301930U (en) | Novel sealing member | |
CN203050693U (en) | Dobby coal cutter with large mining height | |
CN204402659U (en) | Double-piston double link is without dead point engine piston group | |
CN207239702U (en) | A kind of cutting machine clamping fixture seat | |
CN203268357U (en) | Suspended ceiling mechanism of packing machine | |
CN103862710A (en) | Safe and stable press machine device | |
CN203993090U (en) | The left switching mechanism of tipping arrangement for the two-sided installation of heavier product | |
CN201873764U (en) | Anode lifting fixture | |
CN203470630U (en) | Auxiliary supporting structure of inclined wedge type for dies | |
CN202011909U (en) | Cutter lifting mechanism of residual anode pressure-disengaging machine for anode |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110622 Termination date: 20111030 |