CN201868828U CN2010206327654U CN201020632765U CN201868828U CN 201868828 U CN201868828 U CN 201868828U CN 2010206327654 U CN2010206327654 U CN 2010206327654U CN 201020632765 U CN201020632765 U CN 201020632765U CN 201868828 U CN201868828 U CN 201868828U
Authority
CN
China
Prior art keywords
power cable
high voltage
voltage power
corrugated pipe
ring portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206327654U
Other languages
Chinese (zh)
Inventor
蓝耕
陈立荣
王媚
周晓凡
秦斌
张刚强
秦岭
陈伟信
张宇
贲飞
严曾评
何新龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electrophysics Collective Asset Management Co.,Ltd.
Original Assignee
LOGISTICS SERVICE CENTER SMEPC
SHANGHAI QINGONG WIRE EQUIPMENT CO Ltd
SHANGHAI SHENHE PLASTIC INDUSTRY Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LOGISTICS SERVICE CENTER SMEPC, SHANGHAI QINGONG WIRE EQUIPMENT CO Ltd, SHANGHAI SHENHE PLASTIC INDUSTRY Co Ltd, Shanghai Municipal Electric Power Co filed Critical LOGISTICS SERVICE CENTER SMEPC
Priority to CN2010206327654U priority Critical patent/CN201868828U/en
Application granted granted Critical
Publication of CN201868828U publication Critical patent/CN201868828U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a non-excavation underground type high voltage power cable corrugated pipe. The corrugated pipe is characterized in that a convex ring part (3) is formed along the periphery of the outer wall (1) of the corrugated pipe, and the closely-formed periphery is concentric with that of the radial cross section of the corrugated pipe; and a corresponding groove ring part (4) is formed at the inner wall (2) of the corrugated pipe along the convex ring part (3). In the utility model, the high voltage power cable corrugated pipe for non-excavation burying does not need excavation on the ground when the underground burying is carried out, and has less influence on transportation and running of a city; with the help of clearance formed by the convex ring part and the groove ring part and the selection of materials of a pipe, the high voltage power cable corrugated pipe has good bendability and moderate extensibility; under the condition that the laid lines are winding and circuitous, the corrugated pipe can be bent naturally for meeting the complex changing of the laid lines; the coiled corrugated pipe is small in occupied area, is beneficial to construction and transportation under narrow environment, and simultaneously does not need welding heads for pipeline connection, so that the whole quality of the pipelines is improved.

Description

The buried high voltage power cable bellows of non-excavation
Technical field
The utility model relates to the power cable field; particularly; the utility model relates to a kind of protection pipe box that applies to the buried high voltage power cable of non-excavation; use the protection pipe box of high voltage power cable of the present utility model; can excavate ground as in the past, high voltage power cable can be buried underground underground.
Background technology
The construction development in city proposes higher requirement to the provided underground cable.Because the complexity and the particularity of urban environment; the buried cable laying form of construction work of non-excavation is to urban environment; the people's lives influence is than other modes little (for example grooving pipe laying form of construction work); be the preferable form of construction work of present city cable laying, the performance requirement that the protection pipe box requires and this form of construction work adapts.
At present disclosed is a kind of MPP pipe (power cable protecting pipe) for what cooperate this form of construction work use, and the MPP pipe claims the MPP power cable protecting pipe again, and the employing modified polypropene is a main raw material(s).
Yet the MPP pipe is hollow and the inside and outside smooth insulation pipe of tube wall, and this pipe is the walled tube of rigid pipe, and the problem of its existence is:
At first, described MPP pipe is buried underground c underground often must excavation ground, its trouble of constructing, and the traffic in city, operation etc. are caused bigger influence.For example, the selection of caliber is selected according to other condition of the outside diameter of cable, allowable voltage, electric current and engineering; Need relevant department's regulation and customer requirements ditching, its width, degree of depth fibrous root are decided according to the cabling radical.The cement embedding must be used for preventing its winding or extruding in the place of camber; At two protecting pipe connector places, must use PVC sealant tape winding etc. again with brick and the protecting pipe tube head is fixed with cement.
Secondly, the tortuous circuitous occasion in the path of laying power cable, the MPP pipe of the planomural of the rigid insulation that described inside and outside tube wall is smooth can't be complied with the complicated and changeable of laying-out as natural torsion, limits its environment for use;
Moreover the MPP pipe is deposited in the job site and takies very big construction site, is unfavorable for constructing under narrow environment, simultaneously, also the traffic in city, operation etc. is caused bigger influence.
In addition, for transportation, the tortuosity of laying-out is considered, the MPP length of tube is limited, and its maximum length is generally about 9 meters, like this, length needs many MPP pipes to be made of welded connection apart from cable laying, not only increase construction intensity, and there is hidden danger of quality in this being welded to connect, reduced MPP pipe total quality.
The utility model content
At the problems referred to above, the primary technical problem that the utility model solves is: provide a kind of non-excavation buried high voltage power cable bellows, the buried high voltage power cable bellows of described non-excavation can be complied with the different paths of laying as natural torsion, buries the protective casing of high voltage power cable underground as non-excavation ground; And be suitable under narrow municipal construction environment, using, very little to the influence on system operation such as urban transportation of constructing period.
The utility model solves the problems of the technologies described above the technical scheme that is adopted:
The buried high voltage power cable bellows of a kind of non-excavation is formed with corrugated projection ring portion 3 along outer wall 1 circumference of described bellows, and its closed circumference that forms is concentric with bellows radial cross-section circumference; The inwall 2 of described bellows forms corresponding ripple groove ring portion 4 along corrugated projection ring portion 3 shapes.
Because the MPP of the planomural of the rigid insulation that inside and outside tube wall is smooth pipe all is (being exactly hard) of rigidity generally, can't be arbitrarily crooked, by being installed, these pipelines also can not only follow pipe with one, bellows is flexible, bending easily, elongation, compression (certain angle of bend, the elongation compression factor is all restricted).
A preferred version of the present utility model is: adjacent corrugated projection ring portion 3 fixed interval distance is regularly arranged, and adjacent ripple groove ring portion 4 fixed interval distance is regularly arranged.
A preferred version of the present utility model is: described corrugated projection ring portion 3 bottoms are circular-arc, and described ripple groove ring portion 4 bottoms are circular-arc.
According to the utility model, the FATP material that described bellows body material is modification.
The FATP material is mainly filled a prescription and is:
Strengthen with short fiber 5~10 weight portions;
Nylon 5~10 weight portions;
Polypropylene 60~85 weight portions;
Each analog assistant 1~5 weight portion.
Preferably, the FATP material is mainly filled a prescription and is:
Strengthen with short fiber 5~8 weight portions;
Nylon 5~8 weight portions;
Polypropylene 80~85 weight portions;
Each analog assistant 1~2 weight portion.
The FATP material of modification has following advantage:
Good heat resistance: can adapt to the high temperature that the power cable use produces because of the overload short circuit.
Good electric property: material self shows as than high insulation resistance and specific insulation, and fail safe is good.
Excellent decay resistance and ageing resistace: be applicable to various soil and operational environment, long service life.
Inner wall smooth is smooth, coefficient of friction is little, and anti-wear performance is good, can reduce the infringement to cable in the cable laying process greatly, increases work efficiency.
Compare with traditional asbestos-cement pipe, in light weight, flexible good, the shock resistance and the anti-differential settlement of product are good, need not to seal at the construction field (site) pouring concrete; The transportation easy construction, expense is low, greatly the reduction of erection time.
A preferred version of the present utility model is: described inside diameter of bel is 150-250mm, described inside diameter of bel and bottom, described corrugated projection ring portion (3) bore place are 5-12 to the ratio of the height of outer wall (1): 1, and described corrugated projection ring portion (3) wall thickness is 3-8mm.
A preferred version of the present utility model is: described inside diameter of bel is 150-250mm, described inside diameter of bel and bottom, described corrugated projection ring portion (3) bore place are 5.5-7.5 to the ratio of the height of outer wall (1): 1, and described corrugated projection ring portion (3) wall thickness is 3-8mm.
A preferred version of the present utility model is: described corrugated projection ring portion (3) wall thickness is 3.5-5.5mm.
The buried high voltage power cable bellows construction of non-excavation of the present utility model is as follows:
Region two ends of burying high voltage power cable at need underground excavate two vertical respectively, the suitable conduit excavator digs out the underground piping that is communicated with two end vertical mouths, with the buried high voltage power cable bellows of non-excavation of the present utility model draw into, or push, run through described underground piping, release from another vertical mouth.Then, the high voltage power cable that need are buried underground is after the buried high voltage power cable bellows of described non-excavation draws this pipeline, by other port traction vertical mouth.The bellows that connects excision above ground portion behind the described high voltage power cable.
According to the buried high voltage power cable bellows of non-excavation of the present utility model, need not excavate ground when burying underground construction underground, traffic, the operation in city there are not bigger influence; By protruding ring portion and formed space of groove ring portion and body Material Selection, make its ductility with good bendability and appropriateness, under the tortuous circuitous situation of laying-out, the utility model can be complied with the complicated and changeable of laying-out as natural torsion; The bellows floor space of coiling is little, is beneficial under narrow environment construction and transportation, and simultaneously, the joint that need not pipeline connects improves the total quality of pipeline; Ripple struction can be strengthened pipeline to the soil resistance of loading; Good seal, the place use high in level of ground water more can show its superiority.
Description of drawings
Fig. 1 is the radial section structure chart of the buried high voltage power cable bellows of non-excavation of the present utility model.
Embodiment
Below, according to embodiment, in conjunction with the accompanying drawings embodiment of the present utility model is elaborated.
Embodiment 1-3
As shown in Figure 1, inside and outside wall 2,1 circumference of bellows is formed with the bottom is circular arc for protruding ring portion 3 of the corrugated of circular arc and relative bottom ripple groove ring portion 4, its closed circumference that forms is concentric with bellows radial cross-section circumference, projection ring portion 3 and corresponding ripple groove ring portion 4 are pressed fixed range along the regularly arranged unlimited extension of pipe range, constitute separate one by one ripple struction.This ripple struction has not only improved the moment of inertia of tubing, has improved the combination property of tubing, and the flexibility of tubing is enhanced simultaneously, can carry out coiling of certain-length; The utility model ductility and good bendability are specifically, if the utility model bellows is bent to circle, more close than the distance under the straightened condition near the distance between the adjacent protrusion ring portion 3 in the center of circle, the openend of the groove ring portion 4 in the corresponding close center of circle is expanded more than the distance under the straightened condition; Away from the distance between the adjacent protrusion ring portion 3 in the center of circle than the distance under the straightened condition more away from, the openend of corresponding groove ring portion 4 away from the center of circle is more close than the distance under the straightened condition.
The MPP that compares pipe is owing to the utlity model has good bendability, all can coil in transportation and construction site and take in, and area occupied reduces greatly than the MPP pipe, is particularly suitable for constructing in narrow construction site; Owing to can coil and take in, one-time formed body length is a lot of than the MPP pipe range, when laying long distance line, and the corresponding joint that reduces tube and tube, when the complications that run into laying-out were circuitous, the utility model can be complied with the complex conditions of laying the path by natural torsion.
The utility model ripple struction ratio: described inside diameter of bel is 152-225mm, described inside diameter of bel and bottom, described corrugated projection ring portion (3) bore place are 5-12 to the ratio of the height of outer wall (1): 1, and described corrugated projection ring portion (3) wall thickness is 3-8mm.
From structure proportion as can be seen the bellows pipe thickness fix, this structure proportion helps the saving of body material.
What the utility model tube material was selected for use is the FATP material of modification.The FATP material is mainly filled a prescription and is:
Strengthen with short fiber 5~10 weight portions; Nylon 5~10 weight portions; Polypropylene 60~85 weight portions; Each analog assistant 1~5 weight portion.
Region two ends of burying high voltage power cable at need underground excavate two vertical respectively, use the pipeline excavator to dig out the underground piping that is communicated with two end vertical mouths, with the buried high voltage power cable bellows of non-excavation of the present utility model draw into, or push, run through described underground piping, release from another vertical mouth.Then, the high voltage power cable that need are buried underground is after the buried high voltage power cable bellows of described non-excavation draws this pipeline, by other port traction vertical mouth.The bellows that connects excision above ground portion behind the described high voltage power cable.The buried high voltage power cable of non-excavation of the present utility model is buried underground and is finished.
Adopt the FATP material of modification, no matter intensity, thermal endurance, the relative MPP material of hard and soft property from material has further improvement, following table 1,2nd, the FATP of embodiment 1-3 and MPP material and pipe performance relatively:
Table 1
Figure BDA0000035144550000051
Table 2
Figure BDA0000035144550000061
Table 3 is the bellows specification of each embodiment.
Internal diameter (mm) External diameter (mm) Wall thickness (mm)
Embodiment 1 150 183 4.5
Embodiment 2 175 205 5.0
Embodiment 3 200 235 5.5
Table 4 is the Main physical mechanical property of embodiment 1-3 bellows tubing
Figure BDA0000035144550000062
Figure BDA0000035144550000071
Table 5
Table 6 be the bellows of embodiment 1-3 with relatively with the size of diameter tubing in the past
MPP tubing The FATP bellows MPP tubing The FATP bellows
Compare specification DN180*12.0 DN152*3.5 DN200*13.0 DN177*4.0
Internal diameter 156 152 174 177
Tube outer diameter 180 189 200 215
Wall thickness 12.0 3.5 13.0 4.0
From the comparison of last table, the utility model pipe thickness is thin more a lot of than MPP tubing, and this helps the flexural deformation of bellows.
Table 7 is the bellows operating expenses comparison of pipeline in the past of embodiment 1-3:
MPP tubing The FATP bellows
Specification DN180*12.0 DN152*3.5
Engineering consumption (m) 2160 2160
Pulling eye length (m) 108 108
Hole count 20 20
Link cost 7200 1000
Weld time (h) 40 0
Embodiment 4-6
Except described bellows material was chliorinated polyvinyl chloride (PVC-C), other made the buried high voltage power cable bellows of non-excavation of the present utility model as embodiment 1-3.
According to the buried high voltage power cable bellows of non-excavation of the present utility model, need not excavate ground when burying underground construction underground, traffic, the operation in city there are not bigger influence; By protruding ring portion and formed space of groove ring portion and pipe Material Selection, make its ductility with good bendability and appropriateness, under the tortuous circuitous situation of laying-out, the utility model can be complied with the complicated and changeable of laying-out as natural torsion; The bellows floor space of coiling is little, is beneficial under narrow environment construction and transportation, and simultaneously, the joint that need not pipeline connects improves the total quality of pipeline; Ripple struction can be strengthened pipeline to the soil resistance of loading; Good seal, the place use high in level of ground water more can show its superiority.The utility model is applicable to association areas such as telecommunications, railway, highway, tunnel, telecommunication cable, broadcast TV line protective casing.

Claims (6)

1. buried high voltage power cable bellows of non-excavation is characterized in that: outer wall (1) circumference along described bellows is formed with corrugated projection ring portion (3), and its closed circumference that forms is concentric with bellows radial cross-section circumference; The inwall of described bellows (2) forms corresponding ripple groove ring portion (4) along protruding ring portion (3) shape.
2. according to the buried high voltage power cable bellows of the described non-excavation of claim 1, it is characterized in that: adjacent corrugated projection ring portion (3) is regularly arranged with corresponding ripple groove ring portion (4) spacing distance.
3. according to the buried high voltage power cable bellows of the described non-excavation of claim 1, it is characterized in that: described pipeline corrugated projection ring portion (3) bottom is circular-arc, and described ripple groove ring portion (4) bottom is circular-arc.
4. according to the buried high voltage power cable bellows of the described non-excavation of claim 1, it is characterized in that: described inside diameter of bel is 150-250mm, described inside diameter of bel and bottom, described corrugated projection ring portion (3) bore place are 5-12 to the ratio of the height of outer wall (1): 1, and described corrugated projection ring portion (3) wall thickness is 3-8mm.
5. according to the buried high voltage power cable bellows of the described non-excavation of claim 4, it is characterized in that: described inside diameter of bel and bottom, described corrugated projection ring portion (3) bore place are 5.5-7.5 to the ratio of the height of outer wall (1): 1, and described corrugated projection ring portion (3) wall thickness is 3-8mm.
6. according to claim 4 or the buried high voltage power cable bellows of 5 described non-excavations, it is characterized in that: described corrugated projection ring portion (3) wall thickness is 3.5-5.5mm.
CN2010206327654U 2010-11-30 2010-11-30 Non-excavation underground type high voltage power cable corrugated pipe Expired - Fee Related CN201868828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206327654U CN201868828U (en) 2010-11-30 2010-11-30 Non-excavation underground type high voltage power cable corrugated pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206327654U CN201868828U (en) 2010-11-30 2010-11-30 Non-excavation underground type high voltage power cable corrugated pipe

Publications (1)

Publication Number Publication Date
CN201868828U true CN201868828U (en) 2011-06-15

Family

ID=44139971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206327654U Expired - Fee Related CN201868828U (en) 2010-11-30 2010-11-30 Non-excavation underground type high voltage power cable corrugated pipe

Country Status (1)

Country Link
CN (1) CN201868828U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055158A (en) * 2010-11-30 2011-05-11 上海市电力公司 Trenchless buried type high voltage power cable bellows

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055158A (en) * 2010-11-30 2011-05-11 上海市电力公司 Trenchless buried type high voltage power cable bellows

Similar Documents

Publication Publication Date Title
US7550669B2 (en) Slip-joint connection for electric service conduit to service boxes
CN102055158A (en) Trenchless buried type high voltage power cable bellows
CN101752820B (en) Underground cable protective sleeve
CN109458757B (en) Static drilling root planting energy pile and production method and construction method thereof
CN206174001U (en) Prefabricated movement joint tube coupling and prefabricated assembled utility tunnel
CN201868828U (en) Non-excavation underground type high voltage power cable corrugated pipe
CN205557584U (en) Steel pipe corridor and large -scale utility tunnel system
CN110671542A (en) Socket type corrugated reinforced double-flat-wall composite pipe and manufacturing method thereof
CN103775100B (en) A kind of prefabricated assembled city integrated piping lane
CN206802552U (en) A kind of non-excavation type push pipe
CN212080489U (en) Multilayer anti-burst PE pipe
CN214889560U (en) Telescopic pipeline connector
CN201639248U (en) Underground cable protective casing
CN211649434U (en) Internal stop type rubber ring butt joint structure of winding pipe
CN206736961U (en) A kind of Novel steel-plastic composite pipe corridor
CN2631086Y (en) Single-wall corrugated sheath tube ofr underground cable
CN113224722A (en) Buried high-pressure-resistance external-force-resistance diamond-shaped cable protection composite sleeve and sleeve assembly
CN215891439U (en) High-strength double-wall winding pipe
CN210201451U (en) PVC communication pipeline for urban underground comprehensive pipe gallery
CN207117138U (en) A kind of cable protection pipe
CN205489410U (en) Bury ground wire and cable carbon element screwed pipe for sheath
CN215071572U (en) Electric power protection tube buckling tube
CN216976076U (en) PPR water supply pipe
CN219120015U (en) Composite polyvinyl chloride double-wall corrugated pipe
CN212377463U (en) Connecting structure of wall-through embedded sleeve and water stop steel plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI DIANWU COLLECTIVE ASSETS MANAGEMENT CO.,

Free format text: FORMER OWNER: SHANGHAI QIN'GONG LINE + EQUIPMENT CO., LTD. SHANGHAI SHENHE PLASTIC CO., LTD.

Effective date: 20120926

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120926

Address after: 200122, 1122 deep road, Huangpu District, Shanghai

Patentee after: Shanghai Electric Power Corporation

Patentee after: Shanghai Electrophysics Collective Asset Management Co.,Ltd.

Patentee after: Shanghai Shenhe Plastic Industry Co., Ltd.

Address before: 200122, 1122 deep road, Huangpu District, Shanghai

Patentee before: Shanghai Electric Power Corporation

Patentee before: Shanghai Qingong Wire Equipment Co., Ltd.

Patentee before: Shanghai Shenhe Plastic Industry Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110615

Termination date: 20191130