CN201858974U - 长距离顶管轴线测量系统 - Google Patents

长距离顶管轴线测量系统 Download PDF

Info

Publication number
CN201858974U
CN201858974U CN2010205260854U CN201020526085U CN201858974U CN 201858974 U CN201858974 U CN 201858974U CN 2010205260854 U CN2010205260854 U CN 2010205260854U CN 201020526085 U CN201020526085 U CN 201020526085U CN 201858974 U CN201858974 U CN 201858974U
Authority
CN
China
Prior art keywords
point
distance
coordinate
prism
measuring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205260854U
Other languages
English (en)
Inventor
顾卫东
周琼
李政侃
李都
毛伟华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Water Construction & Engineering Co Ltd
Original Assignee
Shanghai Water Construction & Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Water Construction & Engineering Co Ltd filed Critical Shanghai Water Construction & Engineering Co Ltd
Priority to CN2010205260854U priority Critical patent/CN201858974U/zh
Application granted granted Critical
Publication of CN201858974U publication Critical patent/CN201858974U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

长距离顶管轴线测量系统,包括前300m测量系统和300m后测量系统,所述前300m测量系统包括激光经纬仪和设置在机头前壳体上的光靶,激光经纬仪的激光束方向为顶管轴线的设计方向,光靶设置在机头前壳体的中心,所述300m后测量系统包括在B点设置的全站仪,在A点设置的后视点架棱镜,在C点设置的棱镜,设A点的坐标为(0、0、HA),B点的坐标为(L、0、HB),其中HA为A点的高程,HB为B点的高程,L为A、B点的距离且大于或等于100m,则C点的坐标为(L’、α、HC),L’为A、C点距离,α为在设计轴线上的偏差值,HC为C点的高程,该全站仪、在A点设置的后视点架棱镜、在C点设置的棱镜构成测量L’、α的测量系统。

Description

长距离顶管轴线测量系统
技术领域
本实用新型涉及顶管轴线测量系统。
背景技术
顶管顶进轴线误差直接影响地表沉降与进洞姿态,而且在顶进中误差累计到一定程度,必然会影响管道的整体姿态,甚至不能保证顺利进洞。控制管道轴线的偏转、偏移是顶管施工的难点之一,为保证顶进管道轴线施工质量要求,必须在管道顶进过程中实时跟踪测量。常用的做法是采用经纬仪对激光接收装置进行跟踪测量,这种测量方法在300m以内能保证测量的准确度,同时激光接收装置的上下、左右偏转对测量准确度会产生影响。但在一些工程中,最大顶距超过1000m,所以必须采用新的测量手段,控制测量精度,保证施工质量。
实用新型内容
本实用新型的目的在于提供一种长距离顶管轴线测量系统,长距离指300m以上的距离。
一种长距离顶管轴线测量系统,其特点是,包括前300m测量系统和300m后测量系统,所述前300m测量系统包括激光经纬仪和设置在机头前壳体上的光靶,激光经纬仪的激光束方向为顶管轴线的设计方向,光靶设置在机头前壳体的中心,所述300m后测量系统包括在B点设置的全站仪,在A点设置的后视点架棱镜,在C点设置的棱镜,设A点的坐标为(0、0、HA),B点的坐标为(L、0、HB),其中HA为A点的高程,HB为B点的高程,L为A、B点的距离且大于或等于100m,则C点的坐标为(L’、α、HC),L’为A、C点距离,α为在设计轴线上的偏差值,HC为C点的高程,该全站仪、在A点设置的后视点架棱镜、在C点设置的棱镜构成测量L’、α的测量系统。
所述的长距离顶管轴线测量系统,其特点是,所述光靶包括激光接收靶和配重件,激光接收靶和配重件位于杆件的两端部,该杆件可自由转动地设置在顶管机头上,并且以顶管机头的轴心线为转动中心线。
本实用新型的有益效果是:
传统的光学仪器在管道内受到施工环境,如粉尘、温度、湿度等的影响,光线在传播过程中,光点会发生偏差与模糊放大等现象,难以保证300m以上的顶管施工顶进轴线的控制,为克服上述困难,保证测量数据的准确性,本实用新型由前300m测量系统和300m后系统构成,从而可分两步进行量测:前300m顶管施工采用激光经纬仪测轴线,300m后的顶管施工采用全站仪测轴线,从而减少环境、距离等对测量误差的影响,实现长距离顶管轴线的准确测量。
附图说明
图1是自动摆针光靶的结构示意图。
图2是激光接收靶靶面放大示意图。
图3是前300m测量系统的构造图。
图4是确定后300m测量系统的安装位置的示意图。
图5是后300m测量系统的构造图。
图6是后300m测量系统的测量原理图。
具体实施方式
如图1和图2所示,在顶管机头4壳体上安装了杆件2,杆件2的转动中心21为顶管机头的中心轴线,在杆件2的上、下端部分别安装了激光接收靶3和配重件1,因此,在机头发生任何方向的旋转时,杆件2不会随着机头的旋转而运动,而激光接收靶3始终可以居于机头轴线正上方保持不变,并和轴线始终一致,激光接收靶3与机头前壳体平行,保证了接收激光的灵活可靠,便于测量的连贯性,结合使用坡度板量测顶管机头的旋转角,便可以容易地掌握机头的实时姿态,从而采取调整措施。
如图3所示,前300m测量系统在工作井6内管道顶进轴线方向上架设一台激光经纬仪5,并激光经纬仪5底座平台与工作井底板单独连接,除此之外不能与其它任何设备有接触,以免其它设备的震动或移动导致底座平台的震动,否则会间接导致激光经纬仪的不稳定,从而导致测量数据的不准确;
激光经纬仪5发出一束与管道设计轴线和管道坡度一致的激光61,并投射到机头光靶3上形成光点,光点与光靶中心的距离(水平方向与垂直方向)即反映出顶管机头实际轴线与设计轴线的偏差。
由于机头和管节在顶进时都在不断向前移动,这束激光61在机头和管节移动的同时是稳稳的跟踪测量光靶3,这样在顶进过程中可以在光靶上直观的看出机头的前进方向是否按照管道设计轴线和坡度挺进,若发现有偏差机头操作人员可以及时依据测量光靶上的偏差数据来进行反向纠偏。
如图4和图5所示,用架设在工作井6内的激光经纬仪95在有效激光发射范围内用激光在管内底部投放两点分别为A、B,A、B两点间距离为L(选点时距离不能少于100m),用钢卷尺量出机头和第一节管节连接处管内底的中心线位置C点,A、B、C点的高程可以以E点高程基础确定,例如按同上方法在顶进管道洞口处量出管内底中心线位置E点,E点高程为管道进洞图纸设计高程,用水准仪92、91在管道内相对E点的基础上分别测量出A、B两点的高程HA、HB
同时参照图6,后300m测量系统在管道内B点上架设全站仪93,A点上架设后视点架棱镜94,C点架设棱镜92,首先用全站仪93测量出A、B两点间的距离为L,假定坐标系,设A点为原点,管道的顶进方向为X轴,顶进方向偏差为Y轴,A点坐标为(0、0、HA),B点坐标为(L、0、HB),A点为后视点架棱镜,测量出C点坐标为(L’、α、HC),可以得出L’为A、C两点间的距离,α为C点在设计轴线上的偏差值,HC为C点相对E点的测量高程值。按照E、C两点间的距离根据管道设计坡度确定出C点相对于E点的设计高程hc,根据HC和hc相比较可以得知C点高程的偏差值。

Claims (2)

1.长距离顶管轴线测量系统,其特征在于,包括前300m测量系统和300m后测量系统,所述前300m测量系统包括激光经纬仪和设置在机头前壳体上的光靶,激光经纬仪的激光束方向为顶管轴线的设计方向,光靶设置在机头前壳体的中心,所述300m后测量系统包括在B点设置的全站仪,在A点设置的后视点架棱镜,在C点设置的棱镜,设A点的坐标为(0、0、HA),B点的坐标为(L、0、HB),其中HA为A点的高程,HB为B点的高程,L为A、B点的距离且大于或等于100m,则C点的坐标为(L’、α、HC),L’为A、C点距离,α为在设计轴线上的偏差值,HC为C点的高程,该全站仪、在A点设置的后视点架棱镜、在C点设置的棱镜构成测量L’、α的测量系统。
2.如权利要求1所述的长距离顶管轴线测量系统,其特征在于,所述光靶包括激光接收靶和配重件,激光接收靶和配重件位于杆件的两端部,该杆件可自由转动地设置在顶管机头上,并且以顶管机头的轴心线为转动中心线。
CN2010205260854U 2010-09-13 2010-09-13 长距离顶管轴线测量系统 Expired - Lifetime CN201858974U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205260854U CN201858974U (zh) 2010-09-13 2010-09-13 长距离顶管轴线测量系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205260854U CN201858974U (zh) 2010-09-13 2010-09-13 长距离顶管轴线测量系统

Publications (1)

Publication Number Publication Date
CN201858974U true CN201858974U (zh) 2011-06-08

Family

ID=44104779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205260854U Expired - Lifetime CN201858974U (zh) 2010-09-13 2010-09-13 长距离顶管轴线测量系统

Country Status (1)

Country Link
CN (1) CN201858974U (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103256944A (zh) * 2013-05-14 2013-08-21 中铁上海工程局有限公司 一种顶管自动测量导向系统大气折光误差消除方法
CN105091852A (zh) * 2015-07-19 2015-11-25 南宁市政工程集团有限公司 一种顶管开挖激光导向测量施工工法
CN105202261A (zh) * 2015-11-04 2015-12-30 上海十三冶建设有限公司 测控顶管顶进方向的装置及其使用方法
CN106895820A (zh) * 2017-02-09 2017-06-27 中铁二十四局集团浙江工程有限公司 隧道竖井逆向坐标传递投点测量方法
CN106908048A (zh) * 2017-02-09 2017-06-30 中铁二十四局集团浙江工程有限公司 深竖井逆向坐标传递投点测量方法
CN106979769A (zh) * 2017-02-09 2017-07-25 中铁二十四局集团浙江工程有限公司 隧道竖井逆向坐标传递投点施工测量方法
CN106979768A (zh) * 2017-02-09 2017-07-25 中铁二十四局集团浙江工程有限公司 深竖井逆向坐标传递投点施工测量方法
CN107747934A (zh) * 2017-09-28 2018-03-02 中国建筑第八工程局有限公司 顶管轴线测量装置及顶管轴线测量方法
CN107905259A (zh) * 2017-11-29 2018-04-13 浙江跃龙园林建设有限公司 箱涵顶进监测装置及其施工方法
CN108645393A (zh) * 2018-08-13 2018-10-12 中铁二十局集团第工程有限公司 一种顶管机姿态三维测量系统及方法
CN108731654A (zh) * 2018-06-01 2018-11-02 安徽路鼎科技股份有限公司 光电激光靶导向系统
CN111879297A (zh) * 2020-07-30 2020-11-03 中铁二十局集团第六工程有限公司 箱涵顶进装置及方法
CN114739358A (zh) * 2022-03-14 2022-07-12 中铁隧道集团二处有限公司 一种小口径长距离管幕顶进导向实时测量方法

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103256944A (zh) * 2013-05-14 2013-08-21 中铁上海工程局有限公司 一种顶管自动测量导向系统大气折光误差消除方法
CN103256944B (zh) * 2013-05-14 2015-12-02 中铁上海工程局集团有限公司 一种顶管自动测量导向系统大气折光误差消除方法
CN105091852A (zh) * 2015-07-19 2015-11-25 南宁市政工程集团有限公司 一种顶管开挖激光导向测量施工工法
CN105202261A (zh) * 2015-11-04 2015-12-30 上海十三冶建设有限公司 测控顶管顶进方向的装置及其使用方法
CN106908048B (zh) * 2017-02-09 2019-04-12 中铁二十四局集团浙江工程有限公司 深竖井逆向坐标传递投点测量方法
CN106895820A (zh) * 2017-02-09 2017-06-27 中铁二十四局集团浙江工程有限公司 隧道竖井逆向坐标传递投点测量方法
CN106979769A (zh) * 2017-02-09 2017-07-25 中铁二十四局集团浙江工程有限公司 隧道竖井逆向坐标传递投点施工测量方法
CN106979768A (zh) * 2017-02-09 2017-07-25 中铁二十四局集团浙江工程有限公司 深竖井逆向坐标传递投点施工测量方法
CN106908048A (zh) * 2017-02-09 2017-06-30 中铁二十四局集团浙江工程有限公司 深竖井逆向坐标传递投点测量方法
CN106979769B (zh) * 2017-02-09 2019-04-23 中铁二十四局集团浙江工程有限公司 隧道竖井逆向坐标传递投点施工测量方法
CN106979768B (zh) * 2017-02-09 2019-04-23 中铁二十四局集团浙江工程有限公司 深竖井逆向坐标传递投点施工测量方法
CN107747934A (zh) * 2017-09-28 2018-03-02 中国建筑第八工程局有限公司 顶管轴线测量装置及顶管轴线测量方法
CN107747934B (zh) * 2017-09-28 2020-11-03 中国建筑第八工程局有限公司 顶管轴线测量方法
CN107905259A (zh) * 2017-11-29 2018-04-13 浙江跃龙园林建设有限公司 箱涵顶进监测装置及其施工方法
CN108731654A (zh) * 2018-06-01 2018-11-02 安徽路鼎科技股份有限公司 光电激光靶导向系统
CN108645393A (zh) * 2018-08-13 2018-10-12 中铁二十局集团第工程有限公司 一种顶管机姿态三维测量系统及方法
CN111879297A (zh) * 2020-07-30 2020-11-03 中铁二十局集团第六工程有限公司 箱涵顶进装置及方法
CN114739358A (zh) * 2022-03-14 2022-07-12 中铁隧道集团二处有限公司 一种小口径长距离管幕顶进导向实时测量方法

Similar Documents

Publication Publication Date Title
CN201858974U (zh) 长距离顶管轴线测量系统
CN105241444A (zh) 一种悬臂式掘进机空间位姿自动检测系统及其测量方法
CN102518160B (zh) 一种基于gps和激光技术的高程控制系统的高程控制方法
CN202938814U (zh) 全站仪棱镜组和隧道施工的顶管机导向系统
CN102937437A (zh) 全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法
CN105091852A (zh) 一种顶管开挖激光导向测量施工工法
CN111637888B (zh) 基于惯导和激光雷达单点测距的掘进机定位方法及系统
CN108195364B (zh) 用于锚杆钻机的作业定位系统
CN103335647A (zh) 一种盾构机姿态测量系统及其测量方法
CN111692456A (zh) 一种用于管道检测的slam系统及方法
CN102749066B (zh) 一种电子激光靶及其测量装置
CN102692210A (zh) 定点扫描式快速隧道断面净空测量及收敛测量方法
CN112269202A (zh) 一种运动载体辅助的空间基准传递系统及方法
CN111707232A (zh) 一种基于北斗定位多点解算的铁塔姿态预警装置
CN111473803B (zh) 一种用于矿用激光靶的标定方法
CN111173502A (zh) 一种市政工程用顶管开挖激光导向测量施工工法
CN115877408A (zh) 基于北斗定位技术的捣固车数字化作业系统及作业方法
CN106646498B (zh) 一种掘进机横向偏移测量方法
CN104535078A (zh) 一种基于标志点的光电设备对飞行目标的测量方法
CN205002742U (zh) 起重机纠偏激光检测仪
CN102679974B (zh) 高速定位免换站式盾构掘进姿态实时测量方法及系统
CN103245362A (zh) 一种顶管自动测量导向系统棱镜误差修正方法
CN212300318U (zh) 一种基于北斗定位多点解算的铁塔姿态预警装置
CN112855173B (zh) 一种盾构姿态调整激光靶连续量测系统
CN112964191B (zh) 一种微变形激光准直测量方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20110608

CX01 Expiry of patent term