CN102937437A - 全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法 - Google Patents

全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法 Download PDF

Info

Publication number
CN102937437A
CN102937437A CN2012104747166A CN201210474716A CN102937437A CN 102937437 A CN102937437 A CN 102937437A CN 2012104747166 A CN2012104747166 A CN 2012104747166A CN 201210474716 A CN201210474716 A CN 201210474716A CN 102937437 A CN102937437 A CN 102937437A
Authority
CN
China
Prior art keywords
total station
prism group
station prism
push bench
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104747166A
Other languages
English (en)
Inventor
刘飞香
程永亮
郑大桥
贺泊宁
谭新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Heavy Industry Group Co Ltd
Original Assignee
China Railway Construction Heavy Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Heavy Industry Group Co Ltd filed Critical China Railway Construction Heavy Industry Group Co Ltd
Priority to CN2012104747166A priority Critical patent/CN102937437A/zh
Publication of CN102937437A publication Critical patent/CN102937437A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法。其中隧道施工的顶管机导向系统,包括激光靶、主全站仪棱镜组、若干分全站仪棱镜组、后视棱镜、通信盒、计算机;所述激光靶安装在隧道中的顶管机上,主全站仪棱镜组安装在隧道始发井口内的安装支架上,其余分全站仪棱镜组随顶管机的掘进逐个间隔安装在在激光靶与主全站仪棱镜组之间的随顶管机一同前进的隧道管片上,后视棱镜安装在隧道始发井口的墙壁上,主全站仪棱镜组和分全站仪棱镜组均与计算机连接。本发明系统和方法可以实现在长距离曲线顶管隧道中对顶管机姿态的自动测量,指导顶管机的掘进施工。

Description

全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法
技术领域
本发明属于隧道测量装置及方法,具体涉及一种全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法。
背景技术
在隧道测量中,通常使用全站仪进行测量工作,全站仪是一种可以同时进行角度测量(水平角、竖直角) 和距离测量(斜距、平距、高差)的仪器。然而在顶管隧道中,由于管片一直处于运动状态,使得全站仪自身不稳定,无法像盾构隧道一样进行测量工作。对于短距离直线顶管隧道,通常在始发井口安装全站仪,在顶管机上安装激光靶,不换站直接进行测量,使用距离不超过1000m;对于长距离曲线顶管隧道,就难以直接进行测量,通常进行人工测量,效率低下。
发明内容
本发明的目的是提供一种全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法,通过该系统实现在长距离曲线顶管隧道中对顶管机姿态的自动测量,指导掘进。
实现本发明目的采用的技术方案是:
本发明提供的全站仪棱镜组,包括由底座、设底座上的支架、设在支架上的望远镜、操作面板和提把组成的全站仪,所述全站仪的提把上设有
棱镜。
本发明的隧道施工的顶管机导向系统,包括激光靶、主全站仪棱镜组、若干分全站仪棱镜组、后视棱镜、通信盒、计算机;所述激光靶安装在隧道中的顶管机上,主全站仪棱镜组安装在隧道始发井口内的安装支架上,其余分全站仪棱镜组随顶管机的掘进逐个间隔安装在在激光靶与主全站仪棱镜组之间的随顶管机一同前进的隧道管片上,后视棱镜安装在隧道始发井口的墙壁上,主全站仪棱镜组和分全站仪棱镜组均与计算机连接。
本发明提供的隧道施工的顶管机导向系统的导向方法,按照以下步骤进行:
1、在隧道中的顶管机上安装激光靶,在隧道始发井口墙壁上安装后视棱镜,在隧道始发井口上安装主全站仪棱镜组;
2、首先利用计算机控制主全站仪棱镜组从隧道始发井口先测量后视棱镜进行后视定向,再测量激光靶的坐标从而计算出顶管机的位置,与设计线路比较,求出顶管机此时的里程和偏差;
3、当主全站仪棱镜组测量不到激光靶时,在激光靶与主全站仪棱镜组之间的随顶管机一同前进的隧道管片上安装第一分全站仪棱镜组,由计算机控制主全站仪棱镜组测量后视棱镜进行后视定向,再测量第一分全站仪棱镜组计算其坐标,使第一分全站仪棱镜组以主全站仪棱镜组的测量数据为基准重新进行后视定向,由第一分全站仪棱镜组测量激光靶的坐标从而计算出顶管机的位置,与设计线路比较,求出顶管机此时的里程和偏差;
4、随着顶管机的掘进,当主全站仪棱镜组测量不到第一分全站仪棱镜组时,再在第一分全站仪棱镜组与全站仪棱镜组之间的隧道管片上增加第二分全站仪棱镜组,由计算机控制主全站仪棱镜组先测量后视棱镜进行后视定向,再测量第二分全站仪棱镜组计算其坐标,使第二分全站仪棱镜组以主全站仪棱镜组的测量数据为基准重新进行后视定向;由计算机控制第二分全站仪棱镜组测量第一分全站仪棱镜组的坐标,使第一分全站仪棱镜组以第二分全站仪棱镜组的测量数据为基准重新进行后视定向,再由第一分全站仪棱镜组测量激光靶的坐标从而计算出顶管机的位置,与设计线路比较,求出顶管机此时的里程和偏差;如此类推依次增加第N分全站仪棱镜组不断求出顶管机新的里程和偏差。
本发明系统和方法可以实现在长距离曲线顶管隧道中对顶管机姿态的自动测量,指导顶管机的掘进施工,具有系统结构简单,使用方便,测量精度高,导向效果好等优点。
下面结合附图对本发明作进一步说明。
附图说明
图1是现有全站仪的结构示意图。
图2是本发明的全站仪棱镜组结构示意图。
图3是本发明系统的结构示意图。
图4是本发明系统的使用状态示意图。
具体实施方式
本发明的全站仪棱镜组的结构如图1所示,包括全站仪基座101、基座脚螺丝102、全站仪底板103、操作面板104、全站仪支架105、望远镜106、提把107、提把拆装按钮108、棱镜109。其中,全站仪基座101、基座脚螺丝102、全站仪底板103构成了全站仪底座,用于固定全站仪和对全站仪调平;操作面板104用于对全站仪进行操作;全站仪支架105用于固定望远镜106和提把107,并通过提把拆装按钮108对其进行拆装;棱镜109固定于提把107中心。全站仪支架105可以以其竖直中心为固定轴360度转动,同时带动操作面板104、望远镜106、提把107和棱镜109一同转动。
全站仪棱镜组由现有的全站仪(参见图2)改造而成,只是在全站仪的提把107加装了棱镜109,这样全站仪棱镜组既可以当测站进行测量工作,又可以作为后视和前视目标供设站定向和目标测量。棱镜7的固定方式可以为螺栓固定、卡箍固定等方式。棱镜109的方向可随着全站仪棱镜组中全站仪的中心竖直轴线的转动,跟随同步转动,保证全站仪棱镜组中全站仪视线方向和棱镜方向的相同,使得全站仪棱镜组既可作为全站仪进行测量,又可以作为测量目标点,供其它全站仪棱镜组中的全站仪测量。
本发明的隧道施工的顶管机导向系统,如图3、图4所示,包括激光靶6、主全站仪棱镜组1、若干分全站仪棱镜组11、12…1N、后视棱镜3、通信盒4、计算机;所述激光靶6安装在隧道中的顶管机7上,主全站仪棱镜组1安装在隧道始发井口2内的安装支架8上,其余分全站仪棱镜组11、12…1N随顶管机7的掘进逐个间隔安装在在激光靶1与主全站仪棱镜组1之间的随顶管机7一同前进的隧道管片5上,后视棱镜3安装在隧道始发井口2的墙壁上,主全站仪棱镜组1和各分全站仪棱镜组11、12…1N均与计算机连接,计算机安装于控制室内。
以下以3台全站仪棱镜组的具体操作方法为例(实际使用中可根据需要对全站仪棱镜组的数量进行增减),对本发明系统的导向方法做进一步的说明。
首先(参见图3)在隧道中的顶管机7上安装激光靶6,在始发井口2处的墙壁上安装后视棱镜3其坐标为(40.6577,-6.5315,1.1045),在始发井口内的安装支架8上安装主全站仪棱镜组1其坐标为(26.06,-6.7136,-10.7105),用计算机控制主全站仪棱镜组1从隧道始发井口先测量后视棱镜3进行后视定向,再测量激光靶6坐标(43.1542,-6.7822,-10.7505)计算出顶管机7的位置,与设计线路比较,求出顶管机7此时的里程和偏差;
当主全站仪棱镜组1测量不到激光靶6时,在最接近始发井口2同时可以看到激光靶6的位置,在激光靶6与主全站仪棱镜组1之间的随顶管机一同前进的隧道管片5上安装第一分全站仪棱镜组11,此时的测量流程为:用计算机控制主全站仪棱镜组1测量后视棱镜3进行后视定向,再测量第一分全站仪棱镜组11计算其坐标(68.4528,-6.6842,-10.8456);使第一分全站仪棱镜组11以主全站仪棱镜组1测量的数据为基准重新进行后视定向,由第一分全站仪棱镜组2测量激光靶6的坐标(376.781,-6.942,-10.9874)从而计算出顶管机7的位置,与设计线路比较,求出顶管机7此时的里程和偏差;
随着顶管机7的掘进,由于第一分全站仪棱镜组11随着隧道管片5一同前进,导致主全站仪棱镜组1测量不到第一分全站仪棱镜组11,这时,再在第一分全站仪棱镜组11与主全站仪棱镜组1之间的隧道管片5上增加新的第二分全站仪棱镜组12(参见图4),此时的测量流程为:由计算机控制主全站仪棱镜组1先测量后视棱镜3进行后视定向,再测量第二分全站仪棱镜组12计算其坐标(70.9994,-6.9804,-10.8533),使第二分全站仪棱镜组12以主全站仪棱镜组1测量的数据为基准重新进行后视定向;由计算机控制第二分全站仪棱镜组12)测量第一分全站仪棱镜组11的坐标(380.6172,-6.7264,-10.8745);使第一分全站仪棱镜组11以第二分全站仪棱镜组12测量的数据为基准重新进行后视定向,再由第一分全站仪棱镜组11测量激光靶6的坐标(688.9454,-6.5347,-10.8971)从而计算出顶管机位置,与设计线路比较,求出顶管机此时的里程和偏差;如此类推依次增加第N分全站仪棱镜组不断求出顶管机新的里程和偏差。

Claims (3)

1.一种全站仪棱镜组,包括由底座、设底座上的支架、设在支架上的望远镜、操作面板和提把组成的全站仪,其特征是所述全站仪的提把上设有棱镜。
2.一种隧道施工的顶管机导向系统,其特征是包括激光靶、主全站仪棱镜组、若干分全站仪棱镜组、后视棱镜、通信盒、计算机;所述激光靶安装在隧道中的顶管机上,主全站仪棱镜组安装在隧道始发井口内的安装支架上,其余分全站仪棱镜组随顶管机的掘进逐个间隔安装在在激光靶与主全站仪棱镜组之间的随顶管机一同前进的隧道管片上,后视棱镜安装在隧道始发井口的墙壁上,主全站仪棱镜组和分全站仪棱镜组均与计算机连接。
3.一种隧道施工的顶管机导向系统的导向方法,按照以下步骤进行:
1)、在隧道中的顶管机上安装激光靶,在隧道始发井口墙壁上安装后视棱镜,在隧道始发井口上安装主全站仪棱镜组;
2)、首先利用计算机控制主全站仪棱镜组从隧道始发井口先测量后视棱镜进行后视定向,再测量激光靶的坐标从而计算出顶管机的位置,与设计线路比较,求出顶管机此时的里程和偏差;
3)、当主全站仪棱镜组测量不到激光靶时,在激光靶与主全站仪棱镜组之间的随顶管机一同前进的隧道管片上安装第一分全站仪棱镜组,由计算机控制主全站仪棱镜组测量后视棱镜进行后视定向,再测量第一分全站仪棱镜组计算其坐标,使第一分全站仪棱镜组以主全站仪棱镜组的测量数据为基准重新进行后视定向,由第一分全站仪棱镜组测量激光靶的坐标从而计算出顶管机的位置,与设计线路比较,求出顶管机此时的里程和偏差;
4)、随着顶管机的掘进,当主全站仪棱镜组测量不到第一分全站仪棱镜组时,再在第一分全站仪棱镜组与全站仪棱镜组之间的隧道管片上增加第二分全站仪棱镜组,由计算机控制主全站仪棱镜组先测量后视棱镜进行后视定向,再测量第二分全站仪棱镜组计算其坐标,使第二分全站仪棱镜组以主全站仪棱镜组的测量数据为基准重新进行后视定向;由计算机控制第二分全站仪棱镜组测量第一分全站仪棱镜组的坐标,使第一分全站仪棱镜组以第二分全站仪棱镜组的测量数据为基准重新进行后视定向,再由第一分全站仪棱镜组测量激光靶的坐标从而计算出顶管机的位置,与设计线路比较,求出顶管机此时的里程和偏差;如此类推依次增加第N分全站仪棱镜组不断求出顶管机新的里程和偏差。
CN2012104747166A 2012-11-21 2012-11-21 全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法 Pending CN102937437A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104747166A CN102937437A (zh) 2012-11-21 2012-11-21 全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104747166A CN102937437A (zh) 2012-11-21 2012-11-21 全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法

Publications (1)

Publication Number Publication Date
CN102937437A true CN102937437A (zh) 2013-02-20

Family

ID=47696348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104747166A Pending CN102937437A (zh) 2012-11-21 2012-11-21 全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法

Country Status (1)

Country Link
CN (1) CN102937437A (zh)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103322989A (zh) * 2013-06-06 2013-09-25 上海米度测量技术有限公司 一种动态实时测量顶管机位置和姿态的测量装置及其方法
CN103994752A (zh) * 2014-06-05 2014-08-20 中铁上海工程局集团有限公司 一种有关顶管施工的自动测量导向系统及方法
CN104142145A (zh) * 2014-08-06 2014-11-12 上海隧道工程有限公司 大断面矩形顶管自动测量方法及装置
CN105403203A (zh) * 2015-12-22 2016-03-16 中铁上海工程局集团有限公司 一种长距离直线顶管中心简易控制测量系统及方法
CN105974398A (zh) * 2016-07-27 2016-09-28 中国航空工业集团公司西安飞机设计研究所 一种雷达激光靶校准前调平方法
CN106123776A (zh) * 2016-07-08 2016-11-16 上海市政建设有限公司 一种顶管智能顶进测量系统以及测量方法
CN106289194A (zh) * 2016-08-22 2017-01-04 中铁六局集团天津铁路建设有限公司 用于测量单孔管涵顶进方向偏差的方法
CN106764055A (zh) * 2017-01-09 2017-05-31 中建四局第三建筑工程有限公司 顶管三点一线施工工法
CN108645393A (zh) * 2018-08-13 2018-10-12 中铁二十局集团第工程有限公司 一种顶管机姿态三维测量系统及方法
CN108761480A (zh) * 2018-06-27 2018-11-06 四川君逸数码科技股份有限公司 城市地下管廊定位系统
WO2018233390A1 (zh) * 2017-06-19 2018-12-27 中国矿业大学 一种用于弯道施工的掘进定位系统及方法
CN109323652A (zh) * 2018-10-08 2019-02-12 中国铁建重工集团有限公司 一种工程机械定位系统
CN109403984A (zh) * 2018-11-26 2019-03-01 中铁隧道集团四处有限公司 长距离曲线顶管自动导向系统
CN109443326A (zh) * 2018-10-08 2019-03-08 中国铁建重工集团有限公司 一种工程机械定位方法及系统
CN109991025A (zh) * 2019-04-08 2019-07-09 中国矿业大学(北京) 一种地铁管片偏差自动测量靶及其测量方法
CN110332927A (zh) * 2019-07-25 2019-10-15 常州大地测绘科技有限公司 一种顶管机小光斑激光导向系统
CN111197486A (zh) * 2020-01-18 2020-05-26 广州鑫唐夏信息科技有限公司 一种基于机器视觉的顶管机导向方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322851A (zh) * 2011-09-14 2012-01-18 中铁四局集团第一工程有限公司 一种利用智能全站仪测量二等跨河水准高差的方法
CN102564389A (zh) * 2010-12-13 2012-07-11 上海市基础工程有限公司 顶管工程自动测量系统及其方法
CN202938814U (zh) * 2012-11-21 2013-05-15 中国铁建重工集团有限公司 全站仪棱镜组和隧道施工的顶管机导向系统

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102564389A (zh) * 2010-12-13 2012-07-11 上海市基础工程有限公司 顶管工程自动测量系统及其方法
CN102322851A (zh) * 2011-09-14 2012-01-18 中铁四局集团第一工程有限公司 一种利用智能全站仪测量二等跨河水准高差的方法
CN202938814U (zh) * 2012-11-21 2013-05-15 中国铁建重工集团有限公司 全站仪棱镜组和隧道施工的顶管机导向系统

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103322989A (zh) * 2013-06-06 2013-09-25 上海米度测量技术有限公司 一种动态实时测量顶管机位置和姿态的测量装置及其方法
CN103994752A (zh) * 2014-06-05 2014-08-20 中铁上海工程局集团有限公司 一种有关顶管施工的自动测量导向系统及方法
CN104142145A (zh) * 2014-08-06 2014-11-12 上海隧道工程有限公司 大断面矩形顶管自动测量方法及装置
CN105403203A (zh) * 2015-12-22 2016-03-16 中铁上海工程局集团有限公司 一种长距离直线顶管中心简易控制测量系统及方法
CN106123776A (zh) * 2016-07-08 2016-11-16 上海市政建设有限公司 一种顶管智能顶进测量系统以及测量方法
CN106123776B (zh) * 2016-07-08 2019-03-01 上海市政建设有限公司 一种顶管智能顶进测量系统以及测量方法
CN105974398A (zh) * 2016-07-27 2016-09-28 中国航空工业集团公司西安飞机设计研究所 一种雷达激光靶校准前调平方法
CN105974398B (zh) * 2016-07-27 2018-08-24 中国航空工业集团公司西安飞机设计研究所 一种雷达激光靶校准前调平方法
CN106289194A (zh) * 2016-08-22 2017-01-04 中铁六局集团天津铁路建设有限公司 用于测量单孔管涵顶进方向偏差的方法
CN106764055B (zh) * 2017-01-09 2019-02-01 中建四局第三建筑工程有限公司 顶管三点一线施工工法
CN106764055A (zh) * 2017-01-09 2017-05-31 中建四局第三建筑工程有限公司 顶管三点一线施工工法
WO2018233390A1 (zh) * 2017-06-19 2018-12-27 中国矿业大学 一种用于弯道施工的掘进定位系统及方法
CN108761480A (zh) * 2018-06-27 2018-11-06 四川君逸数码科技股份有限公司 城市地下管廊定位系统
CN108645393A (zh) * 2018-08-13 2018-10-12 中铁二十局集团第工程有限公司 一种顶管机姿态三维测量系统及方法
CN109443326A (zh) * 2018-10-08 2019-03-08 中国铁建重工集团有限公司 一种工程机械定位方法及系统
CN109323652A (zh) * 2018-10-08 2019-02-12 中国铁建重工集团有限公司 一种工程机械定位系统
CN109443326B (zh) * 2018-10-08 2021-01-22 中国铁建重工集团股份有限公司 一种工程机械定位方法及系统
CN109403984A (zh) * 2018-11-26 2019-03-01 中铁隧道集团四处有限公司 长距离曲线顶管自动导向系统
CN109403984B (zh) * 2018-11-26 2024-02-09 中铁隧道局集团建设有限公司 长距离曲线顶管自动导向系统
CN109991025A (zh) * 2019-04-08 2019-07-09 中国矿业大学(北京) 一种地铁管片偏差自动测量靶及其测量方法
CN109991025B (zh) * 2019-04-08 2023-11-14 中国矿业大学(北京) 一种地铁管片偏差自动测量靶及其测量方法
CN110332927A (zh) * 2019-07-25 2019-10-15 常州大地测绘科技有限公司 一种顶管机小光斑激光导向系统
CN110332927B (zh) * 2019-07-25 2021-08-10 常州大地测绘科技有限公司 一种顶管机小光斑激光导向系统
CN111197486A (zh) * 2020-01-18 2020-05-26 广州鑫唐夏信息科技有限公司 一种基于机器视觉的顶管机导向方法

Similar Documents

Publication Publication Date Title
CN102937437A (zh) 全站仪棱镜组和隧道施工的顶管机导向系统及其导向方法
CN202938814U (zh) 全站仪棱镜组和隧道施工的顶管机导向系统
CN201858974U (zh) 长距离顶管轴线测量系统
CN106840129B (zh) 一种快速测量地铁管片中心三维坐标的方法
CN102953304B (zh) 地铁轨道结构施工的精密测量控制方法
CN103994752B (zh) 一种有关顶管施工的自动测量导向系统及方法
CN202834381U (zh) 三维双曲线钢顶管纠偏装置
CN108253946B (zh) 多功能竖向测量联系测量一体化三维坐标传递装置及方法
CN103292748A (zh) 一种基于激光测量的多基板拼合检测方法
CN104536008B (zh) 一种凿岩台车炮孔激光测距定位方法
CN105091852A (zh) 一种顶管开挖激光导向测量施工工法
CN205300569U (zh) 隧道变形监测设备和系统
CN102849092B (zh) 隧道台车可视化定位监测系统
CN204405014U (zh) 一种基于激光测距仪的巷道变形测量装置
CN104949661A (zh) 超高层建筑核心筒模板定位测量控制方法
CN107449407A (zh) 用于土压平衡盾构机的自动测量导向系统及方法
CN204881624U (zh) 超高层建筑核心筒模板定位测量控制装置
CN112065078A (zh) 一种调垂系统
CN103983148B (zh) 隧道光面爆破全自动炮孔放样方法
CN109268015A (zh) 基于非连续通视下顶管法联络通道施工的导向系统及方法
CN108222985B (zh) 用于锚杆钻机的数据采集系统
CN102374861A (zh) 产生铅垂激光束的全站仪或觇牌的点下对中操作方法
CN102679974B (zh) 高速定位免换站式盾构掘进姿态实时测量方法及系统
CN102322854B (zh) 隧道监控量测点及tsp炮孔布设装置与方法
CN209085528U (zh) 用于地铁第三轨参数测量的装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130220