CN201843617U - Pipeline arranging structure of trolley matched with shield machine - Google Patents

Pipeline arranging structure of trolley matched with shield machine Download PDF

Info

Publication number
CN201843617U
CN201843617U CN2010206111433U CN201020611143U CN201843617U CN 201843617 U CN201843617 U CN 201843617U CN 2010206111433 U CN2010206111433 U CN 2010206111433U CN 201020611143 U CN201020611143 U CN 201020611143U CN 201843617 U CN201843617 U CN 201843617U
Authority
CN
China
Prior art keywords
pipelines
trolley
pipeline
shield machine
matched
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206111433U
Other languages
Chinese (zh)
Inventor
刘德全
洪鹏
盛少琴
施理军
李金兰
吴丹
陈焕杰
邵能杰
凌金花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cssc Offshore & Marine Engineering Group Co ltd
Guangzhou Shipyard International Co Ltd
Original Assignee
Guangzhou Shipyard International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shipyard International Co Ltd filed Critical Guangzhou Shipyard International Co Ltd
Priority to CN2010206111433U priority Critical patent/CN201843617U/en
Application granted granted Critical
Publication of CN201843617U publication Critical patent/CN201843617U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a pipeline arranging structure of a trolley matched with a shield machine. Pipelines are arranged outside the left side and the right side of the matched trolley, and walkways extending towards tunnel duct pieces are arranged at the outer sides of the left side and the right side of the matched trolley below the pipelines. In the pipeline arranging structurem, the pipelines are arranged at the outer sides of the left side and the right side of the matched trolley, therefore, the space of the matched trolley is not occupied, further larger operating space is provided on the trolley, and the pipeline arranging structure is more beneficial to smooth implementation of various operations. In addition, the walkways extending towards the tunnel duct pieces are arranged below the pipelines, therefore, operators can install and repair the pipelines on the walkways, and the pipelines are more convenient to install and repair.

Description

Line arrangement structure on the supporting chassis of a kind of shield machine
Technical field
The utility model relates to the line arrangement structure on the supporting chassis of shield machine.
Background technology
The shield machine that is used for construction of underground tunnel generally includes the anterior shield body portion and the supporting chassis part at rear portion.Owing to be subjected to restrictions such as shield body diameter, pattern, capacity, the equipment such as power supply-distribution system, auxiliary equipment, hydraulic test, electric fixtures, dregs haulage device, grouting equipment, section of jurisdiction loading and unloading that are used for the shield machine driving all must be installed on supporting chassis.And since supporting chassis also bearing and placing construction material and machine with the material and the function of carrying out the place of various operations, so on the supporting chassis pipeline of each equipment layout to the installation, maintenance of equipment on the supporting chassis, operate very important.
At present, the main centralized arrangement of the pipeline of the supporting chassis of shield machine is in supporting chassis center top, and there is following shortcoming in it: 1, tip position is higher, installs and inconvenient maintenance; 2, the top in the middle of the supporting chassis is equipped with the belt conveyor of carrying native slag usually, and the native slag on it accumulates on the pipeline easily, and pipeline is produced corrosion, influences the application life of pipeline.3, pipeline centralized arrangement, the sort check maintenance difficult.
Summary of the invention
The utility model is intended to provide the line arrangement structure on the supporting chassis of a kind of shield machine, so that carry out operation, the installation that makes things convenient for pipeline and maintenance on the supporting chassis.
Line arrangement structure on the supporting chassis of shield machine described in the utility model, it is in the outside of supporting chassis and arranged on left and right sides installation pipeline, the outside of supporting chassis and arranged on left and right sides, the aisle of extending to the tunnel duct piece direction is set below pipeline.
Line arrangement structure on the supporting chassis of shield machine described in the utility model, it is at supporting chassis left and right sides arranged outside pipeline, pipeline does not take the space on the supporting chassis, can the installation of miscellaneous equipment on the chassis not exerted an influence, can not influence putting of various materials on the chassis, can not influence the various operations on the chassis yet, make to be used for bigger working space on the chassis relatively, more help carrying out smoothly of various operations.In addition, the below of supporting chassis left and right sides outside pipeline is provided with the aisle of extending to tunnel duct piece, and operating personnel can stand in and install on the aisle and the maintenance pipeline, so the installation of pipeline and keep in repair convenient.Simultaneously, pipeline is positioned at the outside, the left and right sides of supporting chassis, and it also can be classified to different pipelines, such as kinetic energy equipment pipelines such as gas, hydraulic coupling are contained in a side, pipeline such as filling system, water system is contained in opposite side, and classification is arranged and installed, can be convenient to maintenance more.
Description of drawings
Fig. 1 is the line arrangement structural representation on the supporting chassis of shield machine described in the utility model;
Fig. 2 is the C-C schematic diagram of Fig. 1.
The specific embodiment
Line arrangement structure on the supporting chassis of a kind of shield machine, as Fig. 1, Fig. 2, its outside in supporting chassis 4 and arranged on left and right sides is equipped with pipeline 1, the outside of supporting chassis and arranged on left and right sides, the aisle 3 of extending to tunnel duct piece 2 directions is set below pipeline.

Claims (1)

1. the line arrangement structure on the supporting chassis of shield machine is characterized in that: in the outside of supporting chassis and arranged on left and right sides installation pipeline, the outside of supporting chassis and arranged on left and right sides, the aisle of extending to the tunnel duct piece direction is set below pipeline.
CN2010206111433U 2010-11-17 2010-11-17 Pipeline arranging structure of trolley matched with shield machine Expired - Lifetime CN201843617U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206111433U CN201843617U (en) 2010-11-17 2010-11-17 Pipeline arranging structure of trolley matched with shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206111433U CN201843617U (en) 2010-11-17 2010-11-17 Pipeline arranging structure of trolley matched with shield machine

Publications (1)

Publication Number Publication Date
CN201843617U true CN201843617U (en) 2011-05-25

Family

ID=44038510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206111433U Expired - Lifetime CN201843617U (en) 2010-11-17 2010-11-17 Pipeline arranging structure of trolley matched with shield machine

Country Status (1)

Country Link
CN (1) CN201843617U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422866A (en) * 2013-08-24 2013-12-04 中铁十二局集团有限公司 Underground folding start method for assorted trolleys after shielding
CN104453922A (en) * 2014-09-29 2015-03-25 武汉船用机械有限责任公司 Shield machine trolley

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422866A (en) * 2013-08-24 2013-12-04 中铁十二局集团有限公司 Underground folding start method for assorted trolleys after shielding
CN104453922A (en) * 2014-09-29 2015-03-25 武汉船用机械有限责任公司 Shield machine trolley

Similar Documents

Publication Publication Date Title
CN201843617U (en) Pipeline arranging structure of trolley matched with shield machine
CN107054388A (en) Track chassis and its application method in the construction of major diameter penstock
CN203959748U (en) A kind of rail roadway stakcer crane with Combined guide wheels
CN206813012U (en) Track chassis for the installation of major diameter penstock
CN202500559U (en) Compact type composite height-regulating coal cutter with small drum and large mining height
CN203727768U (en) Multifunctional furnace dismounting and bale breaking machine with double breaking function and double power
CN203109523U (en) Mining toothed rail welding mould
CN203222832U (en) Crushing and loading dinting machine for coal mine
CN209291727U (en) A kind of multiple degrees of freedom cable reel installation
CN202937274U (en) Novel high-efficient vehicle-mounted automatic feed pulp shooting machine
CN203527447U (en) Moving vehicle device for supercharger repairing roll-over table
CN202625628U (en) Mining monorail hoist turning device
CN202031646U (en) Self-moving device arranged on transfer machine
CN211405223U (en) Installation trolley for current transformer of isolated-phase enclosed bus
CN205859046U (en) A kind of crane drag chain joint
CN202645557U (en) Loading device for digging anchor machine
CN203583569U (en) Excavation-type loading machine supporting hydraulic cylinder convenient to disassemble
CN108868760A (en) A kind of packaged type ore collection miner
CN202326051U (en) Mine cage power generation device
CN202592790U (en) Hidden towline bracket for movable worktable for hydraulic press
CN203730064U (en) Device for lifting and supporting loader head of reversed loader
CN203021210U (en) Improved gantry crane
CN203402706U (en) Support of bucket-wheel stacker-reclaimer gate seat
CN221023431U (en) Mine tunnel emergency power supply vehicle upper assembling structure
CN203049657U (en) Guiding device of coal briquette loader

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 510382 Guangzhou, Guangdong Province, south of Fangcun Avenue, No. 40

Patentee after: CSSC OFFSHORE & MARINE ENGINEERING (Group) Co.,Ltd.

Address before: 510382 Guangzhou, Guangdong Province, south of Fangcun Avenue, No. 40

Patentee before: GUANGZHOU SHIPYARD INTERNATIONAL Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20160115

Address after: 511462 Nansha District, Guangzhou, Pearl River Management District, West Road, No., the first floor of the layer on the ground floor, No. 68

Patentee after: Guangzhou Shipyard International Co.,Ltd.

Address before: 510382 Guangzhou, Guangdong Province, south of Fangcun Avenue, No. 40

Patentee before: CSSC OFFSHORE & MARINE ENGINEERING (Group) Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110525