CN201838213U - 一种抽水蓄能电站的仿真培训系统 - Google Patents
一种抽水蓄能电站的仿真培训系统 Download PDFInfo
- Publication number
- CN201838213U CN201838213U CN2010202457907U CN201020245790U CN201838213U CN 201838213 U CN201838213 U CN 201838213U CN 2010202457907 U CN2010202457907 U CN 2010202457907U CN 201020245790 U CN201020245790 U CN 201020245790U CN 201838213 U CN201838213 U CN 201838213U
- Authority
- CN
- China
- Prior art keywords
- machine
- training system
- operator
- power station
- storage power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012549 training Methods 0.000 title claims abstract description 26
- 238000004088 simulation Methods 0.000 claims description 18
- 238000004458 analytical method Methods 0.000 abstract description 4
- 238000011160 research Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 7
- 238000009825 accumulation Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 239000012467 final product Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000010977 unit operation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202457907U CN201838213U (zh) | 2010-07-02 | 2010-07-02 | 一种抽水蓄能电站的仿真培训系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202457907U CN201838213U (zh) | 2010-07-02 | 2010-07-02 | 一种抽水蓄能电站的仿真培训系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201838213U true CN201838213U (zh) | 2011-05-18 |
Family
ID=44008316
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202457907U Expired - Lifetime CN201838213U (zh) | 2010-07-02 | 2010-07-02 | 一种抽水蓄能电站的仿真培训系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201838213U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105204420A (zh) * | 2015-09-18 | 2015-12-30 | 中国南方电网有限责任公司调峰调频发电公司 | 抽水蓄能机组运行流程及故障查找培训系统及方法 |
-
2010
- 2010-07-02 CN CN2010202457907U patent/CN201838213U/zh not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105204420A (zh) * | 2015-09-18 | 2015-12-30 | 中国南方电网有限责任公司调峰调频发电公司 | 抽水蓄能机组运行流程及故障查找培训系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102663912B (zh) | 区域电网调控一体计算机仿真系统 | |
CN103794109B (zh) | 具有仿真培训功能的电力控制系统及其仿真培训方法 | |
CN103559822A (zh) | 一种变电站仿真培训系统 | |
CN105139714A (zh) | 一种电气化铁路牵引变电所的可视化仿真培训系统及方法 | |
CN103208220B (zh) | 智能型低压供配电实训系统及其实训方法 | |
CN103901777B (zh) | 一种电网调控一体化联合的仿真方法 | |
CN102831792B (zh) | 配网故障仿真系统及其仿真方法 | |
CN101635106A (zh) | 集控站仿真培训系统 | |
CN104064065A (zh) | 配网故障仿真分析培训系统实现方法 | |
CN116580610A (zh) | 一种虚拟变电站运维vr培训与实景实训系统 | |
CN110611312B (zh) | 一种变电站间隔层全景数据在线模拟系统及方法 | |
Chang et al. | A training simulation system for substation equipments maintenance | |
CN111665805A (zh) | 基于3d技术的控制系统培训装置及方法 | |
CN106652646B (zh) | 基于实际监控系统的船舶动力系统嵌入式模拟训练系统 | |
CN201838213U (zh) | 一种抽水蓄能电站的仿真培训系统 | |
CN107741703A (zh) | 核电虚拟dcs仿真平台人机接口架构 | |
CN2916813Y (zh) | 数控系统综合实验台 | |
RU115115U1 (ru) | Тренажер для подготовки операторов | |
CN107015482A (zh) | 一种船舶集控室操作训练模拟器 | |
CN208335507U (zh) | 一种继电保护教学实验仿真平台 | |
CN209486946U (zh) | 基于vr技术的继电保护仿真训练平台系统 | |
Dong et al. | Research on overhead crane training system and its construction based on virtual reality | |
CN112906324A (zh) | 一种大型装备维修模拟训练装置 | |
CN111369874A (zh) | 一种基于模型设计的线路保护实验平台 | |
Li et al. | Monitoring and control system design and implementation of emulational transformer substation based on the mcgs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: HUADONG TIANHUANGPING PUMP STORAGE CO., LTD. Effective date: 20121226 Owner name: STATE GRID XINYUAN CO., LTD. HUADONG TIANHUANGPING Effective date: 20121226 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 310012 HANGZHOU, ZHEJIANG PROVINCE TO: 100017 DONGCHENG, BEIJING |
|
TR01 | Transfer of patent right |
Effective date of registration: 20121226 Address after: 100017 No. 86 West Chang'an Avenue, Beijing Patentee after: State Grid Corporation of China Patentee after: State Grid Xinyuan Co., Ltd. Patentee after: Huadong Tianhuangping Pump Storage Co., Ltd. Address before: Hangzhou City, Zhejiang province 310012 Xihu District Wenyi Road No. 300 Patentee before: Huadong Tianhuangping Pump Storage Co., Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110518 |