CN201826579U - 八度地震区百万机组火力发电厂的主厂房 - Google Patents

八度地震区百万机组火力发电厂的主厂房 Download PDF

Info

Publication number
CN201826579U
CN201826579U CN2010205815843U CN201020581584U CN201826579U CN 201826579 U CN201826579 U CN 201826579U CN 2010205815843 U CN2010205815843 U CN 2010205815843U CN 201020581584 U CN201020581584 U CN 201020581584U CN 201826579 U CN201826579 U CN 201826579U
Authority
CN
China
Prior art keywords
bay
steam turbine
bunker
deaerator
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205815843U
Other languages
English (en)
Inventor
张略秋
胡波
王日云
陈书平
黄和波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Huaneng Power International Inc
Original Assignee
Guangdong Electric Power Design Institute
Huaneng Power International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Electric Power Design Institute, Huaneng Power International Inc filed Critical Guangdong Electric Power Design Institute
Priority to CN2010205815843U priority Critical patent/CN201826579U/zh
Application granted granted Critical
Publication of CN201826579U publication Critical patent/CN201826579U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种八度地震区百万机组火力发电厂的主厂房,包括汽机间、除氧间和煤仓间,其中汽机间和煤仓间分别位于除氧间的两侧,所述汽机间和所述除氧间为一体式结构,且该汽机间和该除氧间的结构为钢筋混凝土框架结构;所述煤仓间与所述汽机间和所述除氧间分开独立布置,且该煤仓间的结构为框架短肢剪力墙钢筋混凝土结构。本实用新型的结构布置简洁合理,能够满足8度区抗震设防的要求,而且,由于不需要布置大量的钢斜撑来提供抗侧刚度,给设备和管道的安装带来便利,同时也显著降低了工程造价。

Description

八度地震区百万机组火力发电厂的主厂房
技术领域
本实用新型涉及工业建筑物,尤其是一种八度地震区百万机组火力发电厂的主厂房。
背景技术
现有的火力发电厂的主厂房主要由汽机间、除氧间和煤仓间组成,其有多种结构形式,常用的有钢筋混凝土框架结构和钢框架结构,一般来讲,在高烈度区(8度抗震设防及以上)采用钢框架结构,认为钢框架结构具有更好的抗震性能;在低烈度区采用钢筋混凝土框架结构,以期节约造价。但是,在高烈度区,为了使钢架结构具有一定的抗侧刚度,在竖向平面内需布置大量的钢斜撑4(如图1所示),这些钢斜撑4影响了设备运行空间,导致各类管道布置不灵活;而且,对钢结构节点的安装要求也比较高,增大了施工难度,此外,采用钢结构,导致主厂房工程造价也较高。
发明内容
本实用新型的目的在于,提供一种八度地震区百万机组火力发电厂的主厂房,满足《建筑抗震设计规范》(GB50011-2001)规定的结构设计要求,同时结构布置简洁和合理,有利于设备与管道的安装,并且成本低。
为了实现上述目的,本实用新型采用的技术方案是:一种八度地震区百万机组火力发电厂的主厂房,包括汽机间、除氧间和煤仓间,其中汽机间和煤仓间分别位于除氧间的两侧,所述汽机间和所述除氧间为一体式结构,且该汽机间和该除氧间的结构为钢筋混凝土框架结构;所述煤仓间与所述汽机间和所述除氧间分开独立布置,且该煤仓间的结构为框架短肢剪力墙钢筋混凝土结构。
作为上述技术方案的优选方案,所述煤仓间的长度方向与所述汽机间和所述除氧间的长度方向垂直,在该煤仓间的四周分散布置有钢筋混凝土短肢剪力墙。
与现有技术相比,本实用新型具有如下有益效果。
(1)本实用新型的煤仓间与汽机间和除氧间分开独立布置,煤仓间、汽机间和除氧间均比现有一体式主厂房的结构更加规则,因此有利于提高结构的抗震能力。
(2)煤仓间采用框架短肢剪力墙钢筋混凝土结构,其结构具有平面和竖向规则的特点,经计算,第一、二振型均为平动,平动系数分别为1.0和0.99,说明结构规则性很好;并且,结构弹性阶段层间最大位移比为1/1007(纵向)和1/1327,小于规定值(1/800)要求;结构弹塑性变形阶段层间最大位移角为1/114,小于定值(1/100)要求。因此,满足《建筑抗震设计规范》(GB50011-2001)规定的结构设计要求。
(3)由于框架短肢剪力墙钢筋混凝土结构充分利用了墙肢的抗侧刚度,剪力墙沿煤仓间周边布置,也能够显著提高结构的抗扭刚度,并且,结构的竖向平面,不再需要布置大量斜撑来满足结构的抗侧要求,因此可以为管道和设备提供大量内部运行空间,这样,不仅节省了土建工程造价,也节省了工艺和设备方面的造价。
总之,本实用新型的结构布置简洁合理,能够满足8度区抗震设防的要求,而且,由于不需要布置大量的钢斜撑来提供抗侧刚度,给设备和管道的安装带来便利,同时也显著降低了工程造价。
附图说明
图1是现有技术中主厂房的结构示意图;
图2是本实用新型实施例的平面布置图;
图3是本实用新型实施例煤仓间的平面布置图;
图4本实用新型实施例煤仓间的主视图;
图5是本实用新型实施例煤仓间的侧视图;
图6是本实用新型实施例汽机间和除氧间的侧视图。
具体实施方式
下面结合附图对本实用新型的实施例进行详细说明。
如图2所示,发电厂主厂房采用侧煤仓布置,汽机间1和除氧间2为一体式结构(为便于叙述,以下合称为汽机间-除氧间),而煤仓间与汽机间-除氧间分开独立布置,并位于除氧间2背对汽机间1的一侧。将煤仓间3与汽机间-除氧间分开独立布置,与原来的整体式结构相比,煤仓间3和汽机间-除氧间均在平面和竖向更规则,有利于提高结构的抗震能力。下面进一步对本实施例的结构进行说明,为了便于说明,将结构体系的长度方向定义为纵向,将结构体系的宽度方向定义为横向。
如图3至图5所示,煤仓间3为多层框架短肢剪力墙钢筋混凝土结构。煤仓间3的四周分散布置有钢筋混凝土短肢剪力墙3a,煤仓间3内部布置有钢筋混凝土柱3b。钢筋混凝土短肢剪力墙3a的横截面大部分为“T”形或“L”形。短肢剪力墙3a由于充分利用了墙肢的抗侧刚度,沿煤仓间3的周边布置,能够显著提高结构的抗扭刚度;而且,结构的竖向平面,不再需要布置大量斜撑来满足结构的抗侧要求,还可以为内部提供管道和设备提供大量内部运行空间,这样,不仅节省了土建工程造价,也节省了工艺和设备方面的造价。
如图1和图6所示,汽机间-除氧间为一体化的多层钢筋混凝土框架结构。汽机间-除氧间纵向共23条轴线,横向共5条轴线,其中A至B柱列为汽机间1框架,B至C柱列为除氧间2框架。
在实际工程设计当中,首先与工艺专业配合确定可以设置剪力墙的位置,然后根据抗震设防的需要通过计算确定墙的位置、数量及尺寸。建立整体模型后,采用计算软件分各种工况进行分析,通过计算得到的内力进行截面设计,从而确定钢混凝土柱、钢筋混凝土柱、剪力墙等截面与配筋。与传统火电厂结构体系相比,将煤仓间3与汽机间-除氧间分开独立布置,并且,汽机间-除氧间采用钢筋混凝土框架结构,煤仓间3采用框架-短肢剪力墙3a钢筋混凝土结构,结构布置简洁合理,能够满足8度区抗震设防的要求。通过计算分析及试验研究,第一、二振型均为平动,平动系数分别为1.0和0.99,说明结构规则性很好;结构弹性阶段层间最大位移比为1/1007(纵向)和1/1327;小于规定值(1/800)要求;结构弹塑性变形阶段层间最大位移角为1/114,小于定值(1/100)要求。
相对于传统体系而言,由于不需要布置大量的钢斜撑来提供抗侧刚度,给设备和管道的安装带来便利,同时也显著降低了工程造价。据估算,与钢结构相比,本实用新型应用于1000MW机组中,可节约工程造价>3000万元。
以上仅为本实用新型的具体实施例,并不以此限定本实用新型的保护范围;在不违反本实用新型构思的基础上所作的任何替换与改进,均属本实用新型的保护范围。

Claims (2)

1.一种八度地震区百万机组火力发电厂的主厂房,包括汽机间、除氧间和煤仓间,其中汽机间和煤仓间分别位于除氧间的两侧,其特征在于:所述汽机间和所述除氧间为一体式结构,且该汽机间和该除氧间的结构为钢筋混凝土框架结构;所述煤仓间与所述汽机间和所述除氧间分开独立布置,且该煤仓间的结构为框架短肢剪力墙钢筋混凝土结构。
2.根据权利要求1所述的八度地震区百万机组火力发电厂的主厂房,其特征在于:所述煤仓间的长度方向与所述汽机间和所述除氧间的长度方向垂直,在该煤仓间的四周分散布置有钢筋混凝土短肢剪力墙。
CN2010205815843U 2010-10-28 2010-10-28 八度地震区百万机组火力发电厂的主厂房 Expired - Fee Related CN201826579U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205815843U CN201826579U (zh) 2010-10-28 2010-10-28 八度地震区百万机组火力发电厂的主厂房

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205815843U CN201826579U (zh) 2010-10-28 2010-10-28 八度地震区百万机组火力发电厂的主厂房

Publications (1)

Publication Number Publication Date
CN201826579U true CN201826579U (zh) 2011-05-11

Family

ID=43965124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205815843U Expired - Fee Related CN201826579U (zh) 2010-10-28 2010-10-28 八度地震区百万机组火力发电厂的主厂房

Country Status (1)

Country Link
CN (1) CN201826579U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101963003A (zh) * 2010-10-28 2011-02-02 广东省电力设计研究院 八度地震区百万机组火力发电厂的主厂房
CN102828630A (zh) * 2012-09-11 2012-12-19 江苏省电力设计院 一种大型火力发电厂侧煤仓间结构
CN103216123A (zh) * 2013-04-16 2013-07-24 中国电力工程顾问集团华东电力设计院 核电常规岛防甩击装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101963003A (zh) * 2010-10-28 2011-02-02 广东省电力设计研究院 八度地震区百万机组火力发电厂的主厂房
CN102828630A (zh) * 2012-09-11 2012-12-19 江苏省电力设计院 一种大型火力发电厂侧煤仓间结构
CN102828630B (zh) * 2012-09-11 2014-09-03 江苏省电力设计院 一种大型火力发电厂侧煤仓间结构
CN103216123A (zh) * 2013-04-16 2013-07-24 中国电力工程顾问集团华东电力设计院 核电常规岛防甩击装置
CN103216123B (zh) * 2013-04-16 2015-04-15 中国电力工程顾问集团华东电力设计院 核电常规岛防甩击装置

Similar Documents

Publication Publication Date Title
CN201722848U (zh) L型混凝土柱
CN104775534A (zh) 装配式泡沫铝复合材料减振耗能柱装置
CN101545294A (zh) 装置耗能型密肋复合墙板
CN202380630U (zh) 一种型钢龙骨阻尼耗能复合墙板
CN205276501U (zh) 装配式混凝土框架延性节点结构
CN201826579U (zh) 八度地震区百万机组火力发电厂的主厂房
CN101672118B (zh) 一种大型火力发电厂主厂房结构
CN101929216A (zh) 轻钢阻尼复合墙板
Zhang et al. Research on structural design of an isolated high-rise building with enlarged base and multiple tower layer in high-intensity area
CN105649250A (zh) 介于梁板体系与无梁楼盖体系之间的结构体系及其构建方法
CN201627386U (zh) 一种大型火力发电厂主厂房结构
CN105649231A (zh) 一种三折线外形面内弯曲屈服型消能器及其制造方法
CN203238804U (zh) 一种新型消能减震伸臂桁架高层结构体系
CN104929277B (zh) 一种抗震墙体及其施工方法
Li et al. Structural shear wall systems with metal energy dissipation mechanism
CN203113847U (zh) 一种火力发电厂钢结构主厂房结构
Markogiannaki et al. Strengthening of a multistory R/C building under lateral loading by utilizing ties
CN104652609A (zh) 用于填充墙与主体结构的高性能泡沫铝耗能连接装置
CN202866039U (zh) 一种tjs金属剪切型阻尼器
CN101963003A (zh) 八度地震区百万机组火力发电厂的主厂房
CN212000576U (zh) 一种上承式混凝土拱桥拱上结构减震装置
Fan et al. Simplified design method and seismic performance of space trusses with consideration of the influence of the stiffness of their lower supporting columns
CN103541453B (zh) 波形软钢节点阻尼器
CN105298017A (zh) 一种钢管阻尼橡胶连梁
CN206448422U (zh) 一种预制减震楼板

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP03 Change of name, title or address

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: Guangdong Electric Power Design Institute of CEEC

Patentee after: Huaneng Power International, Inc.

Address before: 510600 No. 846 Dongfeng East Road, Guangzhou, Guangdong, Yuexiu District

Patentee before: Guangdong Electric Power Design Institute

Patentee before: Huaneng Power International, Inc.

C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: Company limited of China Energy Engineering Group Guangdong Electric Power Design Institute

Patentee after: Huaneng Power International, Inc.

Address before: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee before: Guangdong Electric Power Design Institute of CEEC

Patentee before: Huaneng Power International, Inc.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110511

Termination date: 20171028