CN102828630B - 一种大型火力发电厂侧煤仓间结构 - Google Patents
一种大型火力发电厂侧煤仓间结构 Download PDFInfo
- Publication number
- CN102828630B CN102828630B CN201210332466.2A CN201210332466A CN102828630B CN 102828630 B CN102828630 B CN 102828630B CN 201210332466 A CN201210332466 A CN 201210332466A CN 102828630 B CN102828630 B CN 102828630B
- Authority
- CN
- China
- Prior art keywords
- coal
- power plant
- thermal power
- bunker
- bunker bay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明公开了一种大型火力发电厂侧煤仓间结构,包括皮带层、煤斗支承层和运转层,所述一种大型火力发电厂侧煤仓间结构沿四周分散布置有横向抗震墙和纵向抗震墙;所述一种大型火力发电厂侧煤仓间结构框架柱采用格构柱;所述运转层和煤斗支承层均设置钢筋混凝土桁架梁;所述皮带层框架梁依靠转换柱支承。本发明火力发电厂侧煤仓间结构是一种适合于高烈度地震区发电机组的钢筋混凝土主厂房结构体系,相对于传统结构体系而言,它具有自重轻、材料省、构件受力更合理的优点,使结构的安全度和抗震性大幅度提高;在工艺布置上,巧妙的结构布局大大方便了工艺布置和运行,降低了后期的维护成本。
Description
技术领域
本发明属于厂房设计技术领域,涉及一种新型大型火力发电厂主厂房结构体系。
背景技术
发电厂是国家能源建设的重要组成部分,而主厂房是发电厂的核心建筑,其布置直接关系到电厂的安全经济运行、检修维护和工程造价。和传统的前煤仓方案相比,主厂房的侧煤仓布置由于拉近了锅炉与汽机的距离、充分利用了两炉间的场地,因此可以有效地减少四大管道的材料耗量,节约成本,并节省用地。
从侧煤仓间的结构形式来看,汶川大地震后,国家抗震法规从提高“冗余度”出发,要求高层建筑物不能使用两列柱的单跨框架结构,因此常规侧煤仓间一般采用三列或四列柱的框架结构,然而增加中间立柱在工艺布置上使两台锅炉对应的磨煤机必须设置各自对应的检修通道,不但增加了结构的跨度,同时也给设备检修带来不便。
为避免单框架,在侧煤仓间结构上,也有工程采取抗震墙结构或短肢抗震墙的结构,但由于侧煤仓间跨度大、荷载重(特别是支承煤斗和运转层的框架梁),因此,为体现“强柱弱梁”的抗震设计概念,同时减少梁的截面和自重,在侧煤仓间中部一般还是设置柱,从而在实际的使用过程中,检修不方便,结构总跨度大。
有鉴于上述现有的侧煤仓间结构存在的缺陷,本设计人,积极加以研究创新,以期创设一种新型结构的发电厂侧煤仓间的结构,使其更具有实用性。
发明内容
本发明的主要目的在于,克服现有的侧煤仓间结构存在的缺陷,提供一种新型结构的发电厂侧煤仓间的结构,该结构不仅具有优良的抗震性能和实用性,而且具有产业上的利用价值。
为实现上述目的,本发明采取如下技术解决方案:
一种大型火力发电厂侧煤仓间结构,包括框架梁以及分别沿框架梁四周分散布置的纵向抗震墙和横向抗震墙以及格构式框架柱,所述框架梁设置有皮带层、煤斗支承层、磨煤机检修轨道和运转层,在所述运转层以及所述煤斗支承层上设置有桁架梁,在所述运转层的下部处设置有两列磨煤机和磨煤机检修轨道。
前述的大型火力发电厂侧煤仓间结构,其中,所述桁架梁为钢筋混凝土桁架梁。
前述的大型火力发电厂侧煤仓间结构,其中,在所述煤斗支承层的桁架梁上设置有转换柱,该转换柱用于支撑竖向荷载的皮带层所在的框架梁。
前述的大型火力发电厂侧煤仓间结构,其中,所述运转层上的钢筋混凝土桁架梁内可供工业管线穿过。
前述的大型火力发电厂侧煤仓间结构,其中,所述煤斗支承层的钢筋混凝土桁架梁上支承煤斗。
借由上述技术方案,本发明发电厂侧煤仓间的结构至少具有下列优点:
(1)取消发电厂侧煤仓间的中间立柱,使两列磨煤机共用中间检修通道,从而减少了结构的横向跨度、节省了空间,同时工艺布置更加灵活和方便。
(2)纵向抗震墙隔跨布置,便于工艺专业管线布置。
(3)、采用钢筋混凝土桁架和格构式框架柱代替传统的实腹梁、柱,具有自重较轻、材料节省、受力更合理的优点。
(4)、本结构更有利于抗震,实现了“多道设防”的抗震设计概念。
(5)、通过充分利用运转层上的钢筋混凝土桁架梁的空心部分布置工艺管线及在桁架梁上设置转换柱,减少了皮带层框架梁的跨度和结构总高度。
综上所述,本发明具有上述诸多的优点,可广泛应用于大型火力发电厂侧煤仓间结构。
上述说明仅是本发明技术方案的概述,为了能够更清楚了解本发明的技术手段,并可依照说明书的内容予以实施,以下以本发明的较佳实施例并配合附图详细说明如后。
附图说明
图1本发明大型火力发电厂侧煤仓间结构的示意图。
图2本发明大型火力发电厂侧煤仓间结构的横向剖面布置图。
图3本发明大型火力发电厂侧煤仓间结构的纵向剖面布置图。
具体实施方式
为更进一步阐述本发明为达成预定发明目的所采取的技术手段及功效,以下结合附图及较佳实施例,对本发明的具体实施方式作进一步的详细说明。
如图所示,一种大型火力发电厂侧煤仓间结构,包括框架梁6以及分别沿框架梁6四周分散布置的纵向抗震墙1和横向抗震墙2以及格构式框架柱3,其中,框架梁6、纵向抗震墙1和横向抗震墙2以及格构式框架柱3均采用刚接,形成完整的抗侧力结构体系,在地震来临时,由于和实腹梁相比框架梁的上、下弦截面远小于墙、柱,因此通过配筋的调整完全可以实现梁节点先于柱破坏的“强柱弱梁”的设计思路,另外,框架梁6、纵向抗震墙1和横向抗震墙2以及格构式框架柱3具有比实腹构件更大的刚度,因此相关地震位移可大大减少,框架梁6设置有皮带层7、煤斗支承层8、和运转层9,在运转层9上设置有桁架梁4.1,运转层9上的钢筋混凝土桁架梁4.1内可供工业管线11穿过,煤斗支承层8上设置有桁架梁4,煤斗支承层8的钢筋混凝土桁架梁4上支承煤斗10,在煤斗支承层8的桁架梁上设置有转换柱5,该转换柱5用于支撑竖向荷载的皮带层所在的框架梁6,减少了框架梁的跨度,在运转层9的下部处设置有两列磨煤机13和磨煤机检修轨道12,使两列磨煤机13共用中间的磨煤机检修轨道12,从而减少了结构的横向跨度,并且节省了空间。
为了提高本发明桁架梁4、4.1的的强度,桁架梁4、4.1为钢筋混凝土桁架梁。
在实际工程设计当中,首先与工艺专业配合确定可以设置纵向抗震墙1和横向抗震墙2的位置和长度,然后根据抗震设防的需要通过计算确定抗震墙的具体数量和尺寸。建立整体模型后,采用计算软件分各种工况进行分析,通过计算得到的内力进行截面设计,从而确定钢筋混凝土柱、抗震墙和桁架梁的截面与配筋。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案范围内,当可利用上述揭示的技术内容作出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (5)
1.一种大型火力发电厂侧煤仓间结构,包括框架梁(6)以及分别沿框架梁(6)四周分散布置的纵向抗震墙(1)和横向抗震墙(2)以及格构式框架柱(3),所述框架梁(6)设置有皮带层(7)、煤斗支承层(8)、和运转层(9),其特征在于,在所述运转层(9)以及所述煤斗支承层(8)上设置有桁架梁(4),在所述运转层(9)的下部处设置有两列磨煤机(13)和磨煤机检修轨道(12)。
2.根据权利要求1所述的大型火力发电厂侧煤仓间结构,其特征在于,所述桁架梁(4)为钢筋混凝土桁架梁。
3.根据权利要求1所述的大型火力发电厂侧煤仓间结构,其特征在于,在所述煤斗支承层(8)的桁架梁上设置有转换柱(5),该转换柱(5)用于支撑竖向荷载的皮带层所在的框架梁。
4.根据权利要求1所述的大型火力发电厂侧煤仓间结构,其特征在于,所述运转层(9)上的钢筋混凝土桁架梁内可供工业管线(11)穿过。
5.根据权利要求1所述的大型火力发电厂侧煤仓间结构,其特征在于,所述煤斗支承层(8)的钢筋混凝土桁架梁(4)上支承煤斗(10)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210332466.2A CN102828630B (zh) | 2012-09-11 | 2012-09-11 | 一种大型火力发电厂侧煤仓间结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210332466.2A CN102828630B (zh) | 2012-09-11 | 2012-09-11 | 一种大型火力发电厂侧煤仓间结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102828630A CN102828630A (zh) | 2012-12-19 |
CN102828630B true CN102828630B (zh) | 2014-09-03 |
Family
ID=47331922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210332466.2A Active CN102828630B (zh) | 2012-09-11 | 2012-09-11 | 一种大型火力发电厂侧煤仓间结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102828630B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103075033A (zh) * | 2013-02-22 | 2013-05-01 | 中国电力工程顾问集团东北电力设计院 | 橡胶支座支撑钢煤斗系统 |
CN103362324B (zh) * | 2013-07-25 | 2016-05-18 | 中国电力工程顾问集团华东电力设计院有限公司 | 支承煤斗的支撑-桁架结构 |
CN104612421B (zh) * | 2014-12-30 | 2017-10-31 | 华电郑州机械设计研究院有限公司 | 一种仓前转接机房连体布置结构 |
CN106013431B (zh) * | 2016-07-04 | 2018-04-06 | 中国能源建设集团广东省电力设计研究院有限公司 | 一种煤仓间的煤斗梁 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201627386U (zh) * | 2009-09-28 | 2010-11-10 | 中国电力工程顾问集团西北电力设计院 | 一种大型火力发电厂主厂房结构 |
CN201826579U (zh) * | 2010-10-28 | 2011-05-11 | 广东省电力设计研究院 | 八度地震区百万机组火力发电厂的主厂房 |
CN202731348U (zh) * | 2012-09-11 | 2013-02-13 | 江苏省电力设计院 | 一种大型火力发电厂侧煤仓间结构 |
-
2012
- 2012-09-11 CN CN201210332466.2A patent/CN102828630B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201627386U (zh) * | 2009-09-28 | 2010-11-10 | 中国电力工程顾问集团西北电力设计院 | 一种大型火力发电厂主厂房结构 |
CN201826579U (zh) * | 2010-10-28 | 2011-05-11 | 广东省电力设计研究院 | 八度地震区百万机组火力发电厂的主厂房 |
CN202731348U (zh) * | 2012-09-11 | 2013-02-13 | 江苏省电力设计院 | 一种大型火力发电厂侧煤仓间结构 |
Also Published As
Publication number | Publication date |
---|---|
CN102828630A (zh) | 2012-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103147526B (zh) | 长条形格栅钢管混凝土组合结构剪力墙及其制备方法 | |
CN103924802B (zh) | 一种大型直筒锥段型钢结构冷却塔 | |
CN102828630B (zh) | 一种大型火力发电厂侧煤仓间结构 | |
CN102251602A (zh) | 剪切型开孔软钢建筑结构抗震阻尼器 | |
CN209397989U (zh) | 高架独柱车站的消能减震体结构 | |
CN203531445U (zh) | 新型钢结构厂房 | |
CN202202410U (zh) | 一种钢结构箱形柱与箱形梁和工字梁连接十字形异型节点 | |
CN203821907U (zh) | 大型直筒锥段型钢结构冷却塔 | |
CN101672118A (zh) | 一种大型火力发电厂主厂房结构 | |
CN102787650B (zh) | 一种脱硝钢结构支架 | |
CN201627386U (zh) | 一种大型火力发电厂主厂房结构 | |
CN104775521B (zh) | 一种装配整体式正交斜放混合型钢网格盒式结构 | |
CN202731348U (zh) | 一种大型火力发电厂侧煤仓间结构 | |
CN207905104U (zh) | 一种装配式建筑桁架结构 | |
CN202202411U (zh) | 一种钢结构变截面箱形柱与工字梁刚性连接t形异型节点 | |
CN203464302U (zh) | 一种倾斜烟道结构 | |
CN203113847U (zh) | 一种火力发电厂钢结构主厂房结构 | |
CN202090457U (zh) | 一种剪切型并联软钢建筑结构抗震阻尼器 | |
CN202689585U (zh) | 大型钢桁架的地面组对拼装胎具 | |
CN201258599Y (zh) | 格构式角钢结构全联合构架 | |
CN103470077A (zh) | 新型钢结构厂房 | |
CN202202414U (zh) | 一种钢结构箱形柱与工字梁刚性连接十字形异型节点 | |
CN202117162U (zh) | 空冷凝汽器支承结构 | |
Li et al. | Finite element analysis of foundation settlement of 220kv transmission tower with independent foundation | |
CN103453219B (zh) | 电缆过河桥架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINA ENERGY ENGINEERING GROUP JIANGSU ELECTRIC PO Free format text: FORMER NAME: JIANGSU ELECTRIC POWER DESIGNING INST. |
|
CP01 | Change in the name or title of a patent holder |
Address after: 211102, No. 58-3, Su Yuan Avenue, Jiangning District, Jiangsu, Nanjing Patentee after: Chinese energy construction group Jiangsu Prov. Power Design Inst Co., Ltd Address before: 211102, No. 58-3, Su Yuan Avenue, Jiangning District, Jiangsu, Nanjing Patentee before: Jiangsu Electric Power Designing Institute |