CN201818095U - 一种新型复合材料管体预埋结构 - Google Patents
一种新型复合材料管体预埋结构 Download PDFInfo
- Publication number
- CN201818095U CN201818095U CN2010205491810U CN201020549181U CN201818095U CN 201818095 U CN201818095 U CN 201818095U CN 2010205491810 U CN2010205491810 U CN 2010205491810U CN 201020549181 U CN201020549181 U CN 201020549181U CN 201818095 U CN201818095 U CN 201818095U
- Authority
- CN
- China
- Prior art keywords
- embedded
- pipe body
- composite pipe
- embedded structure
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002131 composite material Substances 0.000 title claims abstract description 17
- 238000004519 manufacturing process Methods 0.000 claims abstract description 5
- 239000002184 metal Substances 0.000 claims abstract description 5
- 229910052751 metal Inorganic materials 0.000 claims abstract description 5
- 229910052755 nonmetal Inorganic materials 0.000 claims abstract description 5
- 239000011157 advanced composite material Substances 0.000 claims description 6
- 150000002843 nonmetals Chemical class 0.000 claims description 4
- 238000004891 communication Methods 0.000 abstract description 3
- 239000007769 metal material Substances 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Foundations (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205491810U CN201818095U (zh) | 2010-09-29 | 2010-09-29 | 一种新型复合材料管体预埋结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205491810U CN201818095U (zh) | 2010-09-29 | 2010-09-29 | 一种新型复合材料管体预埋结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201818095U true CN201818095U (zh) | 2011-05-04 |
Family
ID=43916059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205491810U Expired - Lifetime CN201818095U (zh) | 2010-09-29 | 2010-09-29 | 一种新型复合材料管体预埋结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201818095U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852326A (zh) * | 2012-09-27 | 2013-01-02 | 无锡久一重工机械有限公司 | 悬伸梁的支座 |
-
2010
- 2010-09-29 CN CN2010205491810U patent/CN201818095U/zh not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852326A (zh) * | 2012-09-27 | 2013-01-02 | 无锡久一重工机械有限公司 | 悬伸梁的支座 |
CN102852326B (zh) * | 2012-09-27 | 2015-08-19 | 无锡久一重工机械有限公司 | 悬伸梁的支座 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202164830U (zh) | 输电铁塔的加固装置 | |
CN203639005U (zh) | 一种塔吊的加固装置 | |
JP2010043505A (ja) | 鉄塔の主柱材取替え工法 | |
CN201475501U (zh) | 组装式竖向管组支架及其与管组的安装结构 | |
CN204898706U (zh) | 一种钢管桩基通信杆塔结构 | |
CN201818095U (zh) | 一种新型复合材料管体预埋结构 | |
CN204437484U (zh) | 大跨度钢网架的风管支架 | |
CN202359830U (zh) | 新型输电铁塔的加固装置 | |
CN202117299U (zh) | 一种工具式悬挑脚手架支承体系 | |
CN201461205U (zh) | 立式水轮发电机组径向支撑结构 | |
CN101603330A (zh) | 钢-混组合结构无焊接节点连接器 | |
CN204089082U (zh) | 避雷带装置 | |
CN202380475U (zh) | 钢筋混凝土杆与基础的连接装置 | |
CN202745459U (zh) | C80高强度混凝土大梢径部分预应力电杆 | |
CN202031370U (zh) | 一种混凝土-钢结构复合风电塔架 | |
CN202513536U (zh) | 一种电力隧道用电缆支架 | |
CN214062984U (zh) | 一种可无损伤安装支架的螺母预埋式管片 | |
CN208074268U (zh) | 一种市政管道预制垫件 | |
CN203452440U (zh) | 两端为内法兰连接的预应力混凝土杆段 | |
CN206917904U (zh) | 一种可调节固定角度装有旋转底盘的水泵 | |
CN206110799U (zh) | 新型的石墨烯复合材料单管塔 | |
CN201690285U (zh) | 一种电机安装支架 | |
CN108275583B (zh) | 一种超高层外挂动臂塔吊支撑架及其安装方法 | |
CN202055146U (zh) | 一种熨平板附件的连接结构 | |
CN202450627U (zh) | 门柱柱脚预埋件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20151225 Address after: 311400, 528 Golf Road, Dongzhou street, Fuyang District, Zhejiang, Hangzhou Patentee after: WanXing Traffic Engineering Co., Ltd., Fuyang City Address before: The 10 floor No. 130 Fuchun Street Youth Palace Longshan road 311400 Zhejiang city of Fuyang Province Patentee before: Zhao Xinrong |
|
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 311400, 528 Golf Road, Dongzhou street, Fuyang District, Zhejiang, Hangzhou Patentee after: Fuyang Hangzhou Wanxing Traffic Engineering Co., Ltd. Address before: 311400, 528 Golf Road, Dongzhou street, Fuyang District, Zhejiang, Hangzhou Patentee before: WanXing Traffic Engineering Co., Ltd., Fuyang City |
|
CP03 | Change of name, title or address |
Address after: 311400 Zhejiang, Hangzhou, Fuyang District, Dongzhou Street Golf Road, building 528, No. 1 Patentee after: Hangzhou Wanxing Polytron Technologies Inc Address before: 311400, 528 Golf Road, Dongzhou street, Fuyang District, Zhejiang, Hangzhou Patentee before: Fuyang Hangzhou Wanxing Traffic Engineering Co., Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20110504 |
|
CX01 | Expiry of patent term |